Letting of 11/17/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 013-12-0049
Parish: ST TAMMANY
Routes: US 190
Description: US 190 AT PELICAN PARK, LEFT TURN LANE
Type Const: grading, drainage structures, cold planing asphaltic concrete pavement, class ii
base course, superpave asphaltic concrete overlay and related work
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $188,825.53
206487 HUEY STOCKSTILL, INC. $256,918.20
306276 BARRIERE CONSTRUCTION CO., LLC. $284,802.57
416724 STRANCO, INC. $310,300.88
512487 DIAMOND B CONSTRUCTION CO., L.L.C. $464,041.88
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
BARRIERE CONSTRUCTION CO., LLC.
- 4 -
STRANCO, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of existing side drain pipe 1      ea 2,000.00 2,000.00 1,100.00 1,100.00 300.00 300.00 2,259.00 2,259.00
203-06 excavation & embankment lump      lump 10,000.00 10,000.00 10,000.00 10,000.00 40,000.00 40,000.00 13,838.00 13,838.00
204-05-A temporary sediment check dams (hay) 5      ea 130.00 650.00 125.00 625.00 160.00 800.00 86.60 433.00
204-06 temporary silt fencing 694      ln m 4.50 3,123.00 4.50 3,123.00 5.50 3,817.00 4.89 3,393.66
302-02-C class ii base course (250 mm thick) 960.6    sq m 25.00 24,015.00 38.00 36,502.80 28.00 26,896.80 28.44 27,319.46
304-01 lime 161.75   Mg 5.00 808.75 130.00 21,027.50 0.10 16.17 180.20 29,147.35
304-04-D lime treatment (type d) (300 mm thick) 961      sq m 1.00 961.00 8.00 7,688.00 3.00 2,883.00 7.40 7,111.40
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    cu m 15.00 750.00 35.00 1,750.00 60.00 3,000.00 14.60 730.00
502-01 superpave asphaltic concrete 1,228.6    Mg 70.00 86,002.00 81.00 99,516.60 90.00 110,574.00 108.70 133,548.82
509-01 cold planing asphaltic pavement 2,591      sq m 3.50 9,068.50 3.10 8,032.10 6.50 16,841.50 4.09 10,597.19
509-02 contractor retained reclaimed asphaltic pavement - 130      cu m 5.00 - 650.00 FREE FREE 9.00 - 1,170.00 FREE FREE
701-05-G side drain pipe (450 mm) 25.5    ln m 165.00 4,207.50 160.00 4,080.00 280.00 7,140.00 182.55 4,655.02
702-08-A side drain safety end (type 1) 2      ea 1,000.00 2,000.00 700.00 1,400.00 1,200.00 2,400.00 2,637.00 5,274.00
713-01 temporary signs & barricades lump      lump 16,000.00 16,000.00 12,000.00 12,000.00 10,000.00 10,000.00 19,942.00 19,942.00
713-03-A temporary pavement markings (100 mm width) 700      ln m 1.70 1,190.00 1.75 1,225.00 2.00 1,400.00 2.35 1,645.00
713-07 temporary reflectorized raised pavement markers 60      ea 4.70 282.00 4.40 264.00 6.00 360.00 15.28 916.80
717-01 seeding 12      kg 50.00 600.00 50.00 600.00 30.00 360.00 48.50 582.00
718-01 fertilizer 395      kg 1.00 395.00 1.00 395.00 1.30 513.50 1.98 782.10
724-01-B pavement patching (300 mm minimum thickness) 21      sq m 115.00 2,415.00 180.00 3,780.00 125.00 2,625.00 234.86 4,932.06
726-01 bedding material 18.7    cu m 50.00 935.00 70.00 1,309.00 70.00 1,309.00 102.03 1,907.96
727-01 mobilization lump      lump 15,000.00 15,000.00 25,000.00 25,000.00 40,000.00 40,000.00 29,255.00 29,255.00
731-02 reflectorized raised pavement markers 595      ea 5.60 3,332.00 6.00 3,570.00 6.00 3,570.00 6.98 4,153.10
732-02-A plastic pavement striping (solid line)(100 mm width) 1.734  km 1,425.00 2,470.95 1,500.00 2,601.00 1,500.00 2,601.00 1,771.63 3,072.00
732-02-C plastic pavement striping (solid line)(200 mm width) 0.046  km 2,750.00 126.50 3,000.00 138.00 3,000.00 138.00 3,434.78 157.99
732-02-E plastic pavement striping (solid line)(600 mm width) 0.066  km 8,200.00 541.20 8,600.00 567.60 9,000.00 594.00 10,227.27 674.99
732-03-A plastic pavement striping (broken line)(100 mm width) 0.042  km 765.00 32.13 800.00 33.60 800.00 33.60 952.38 39.99
732-04-A plastic pavement legends & symbols (arrow) 3      ea 145.00 435.00 150.00 450.00 200.00 600.00 181.33 543.99
732-04-C plastic pavement legends & symbols (only) 1      ea 135.00 135.00 140.00 140.00 200.00 200.00 168.00 168.00
740-01 construction layout lump      lump 2,000.00 2,000.00 10,000.00 10,000.00 7,000.00 7,000.00 3,221.00 3,221.00
                       
 CONTRACTOR TOTAL       188,825.53   256,918.20   284,802.57   310,300.88
 
Item Number Item Description Quantity Unit of Measure - 5 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of existing side drain pipe 1      ea 1,500.00 1,500.00            
203-06 excavation & embankment lump      lump 7,500.00 7,500.00            
204-05-A temporary sediment check dams (hay) 5      ea 350.00 1,750.00            
204-06 temporary silt fencing 694      ln m 5.00 3,470.00            
302-02-C class ii base course (250 mm thick) 960.6    sq m 21.50 20,652.90            
304-01 lime 161.75   Mg 125.00 20,218.75            
304-04-D lime treatment (type d) (300 mm thick) 961      sq m 2.50 2,402.50            
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    cu m 45.00 2,250.00            
502-01 superpave asphaltic concrete 1,228.6    Mg 135.62 166,622.73            
509-01 cold planing asphaltic pavement 2,591      sq m 3.00 7,773.00            
509-02 contractor retained reclaimed asphaltic pavement - 130      cu m 0.10 - 13.00            
701-05-G side drain pipe (450 mm) 25.5    ln m 175.00 4,462.50            
702-08-A side drain safety end (type 1) 2      ea 1,850.00 3,700.00            
713-01 temporary signs & barricades lump      lump 5,000.00 5,000.00            
713-03-A temporary pavement markings (100 mm width) 700      ln m 200.00 140,000.00            
713-07 temporary reflectorized raised pavement markers 60      ea 10.00 600.00            
717-01 seeding 12      kg 18.00 216.00            
718-01 fertilizer 395      kg 1.00 395.00            
724-01-B pavement patching (300 mm minimum thickness) 21      sq m 125.00 2,625.00            
726-01 bedding material 18.7    cu m 75.00 1,402.50            
727-01 mobilization lump      lump 25,000.00 25,000.00            
731-02 reflectorized raised pavement markers 595      ea 5.00 2,975.00            
732-02-A plastic pavement striping (solid line)(100 mm width) 1.734  km 2,500.00 4,335.00            
732-02-C plastic pavement striping (solid line)(200 mm width) 0.046  km 10,000.00 460.00            
732-02-E plastic pavement striping (solid line)(600 mm width) 0.066  km 18,000.00 1,188.00            
732-03-A plastic pavement striping (broken line)(100 mm width) 0.042  km 18,000.00 756.00            
732-04-A plastic pavement legends & symbols (arrow) 3      ea 450.00 1,350.00            
732-04-C plastic pavement legends & symbols (only) 1      ea 450.00 450.00            
740-01 construction layout lump      lump 35,000.00 35,000.00            
                       
 CONTRACTOR TOTAL       464,041.88            