| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of concrete patches
|
25   |
SQYD |
50.00 |
1,250.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
130   |
CUYD |
20.00 |
2,600.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
25   |
CUYD |
20.00 |
500.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
240   |
CUYD |
150.00 |
36,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,297.9 |
TON |
65.16 |
280,051.16 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,556.7 |
TON |
65.16 |
101,434.57 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.070 |
MILE |
350.00 |
1,074.50 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
6.141 |
MILE |
500.00 |
3,070.50 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
80   |
SQYD |
150.00 |
12,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.141 |
MILE |
2,000.00 |
12,282.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
2.65 |
ACRE |
1,500.00 |
3,975.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-001 |
cement treated base course (12 in depth)
|
19,818   |
SQYD |
6.50 |
128,817.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
643,054.73 |
|
|
|
|
|
|
|