| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEVERLY CONSTRUCTION CO. LLC |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
- 4 - HUEY STOCKSTILL, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
108,000.00 |
108,000.00 |
120,000.00 |
120,000.00 |
35,000.00 |
35,000.00 |
200,000.00 |
200,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
16,500.00 |
16,500.00 |
18,000.00 |
18,000.00 |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
24   |
SQYD |
21.00 |
504.00 |
20.00 |
480.00 |
20.00 |
480.00 |
12.00 |
288.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
1,623.1 |
LNFT |
10.00 |
16,231.00 |
5.00 |
8,115.50 |
4.00 |
6,492.40 |
5.00 |
8,115.50 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,300.8 |
SQYD |
4.60 |
5,983.68 |
3.00 |
3,902.40 |
6.00 |
7,804.80 |
6.00 |
7,804.80 |
| 202-02-H |
removal of guard rail
|
324   |
LNFT |
5.50 |
1,782.00 |
3.00 |
972.00 |
5.00 |
1,620.00 |
3.00 |
972.00 |
| 202-02-I |
removal of approach slabs
|
134   |
SQYD |
17.00 |
2,278.00 |
35.00 |
4,690.00 |
40.00 |
5,360.00 |
33.00 |
4,422.00 |
| 202-02-01 |
removal of fence
|
6,052   |
LNFT |
1.82 |
11,014.64 |
1.00 |
6,052.00 |
2.50 |
15,130.00 |
3.00 |
18,156.00 |
| 202-02-02 |
removal of existing signal equip. & relocated items
|
lump |
LUMP |
7,146.06 |
7,146.06 |
2,000.00 |
2,000.00 |
6,500.00 |
6,500.00 |
7,000.00 |
7,000.00 |
| 203-01 |
general excavation
|
53,827   |
CUYD |
5.85 |
314,887.95 |
6.00 |
322,962.00 |
8.00 |
430,616.00 |
6.00 |
322,962.00 |
| 203-02 |
drainage excavation
|
2,780   |
CUYD |
7.12 |
19,793.60 |
15.00 |
41,700.00 |
11.00 |
30,580.00 |
16.00 |
44,480.00 |
| 203-04 |
embankment
|
10,829   |
CUYD |
9.20 |
99,626.80 |
8.00 |
86,632.00 |
12.00 |
129,948.00 |
5.00 |
54,145.00 |
| 203-05 |
nonplastic embankment
|
78,774   |
CUYD |
9.09 |
716,055.66 |
12.00 |
945,288.00 |
12.00 |
945,288.00 |
13.00 |
1,024,062.00 |
| 203-09 |
geotextile fabric
|
672   |
SQYD |
1.15 |
772.80 |
2.00 |
1,344.00 |
1.00 |
672.00 |
1.00 |
672.00 |
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
11.00 |
1,100.00 |
8.00 |
800.00 |
8.00 |
800.00 |
9.00 |
900.00 |
| 204-06 |
temporary silt fencing
|
45,800   |
LNFT |
2.35 |
107,630.00 |
1.00 |
45,800.00 |
1.30 |
59,540.00 |
2.00 |
91,600.00 |
| 302-02-D |
class ii base course (12" thick)
|
80,973.1 |
SQYD |
14.75 |
1,194,353.22 |
15.00 |
1,214,596.50 |
16.00 |
1,295,569.60 |
15.00 |
1,214,596.50 |
| 401-01 |
aggregate surface course (net section) (4" thick)
|
23.2 |
CUYD |
53.00 |
1,229.60 |
75.00 |
1,740.00 |
45.00 |
1,044.00 |
37.00 |
858.40 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
35.00 |
17,500.00 |
45.00 |
22,500.00 |
30.00 |
15,000.00 |
34.00 |
17,000.00 |
| 502-01 |
superpave asphaltic concrete
|
33,122.8 |
TON |
62.00 |
2,053,613.60 |
56.00 |
1,854,876.80 |
54.50 |
1,805,192.60 |
56.00 |
1,854,876.80 |
| 509-01 |
cold planing asphaltic pavement
|
33,451   |
SQYD |
1.48 |
49,507.48 |
1.40 |
46,831.40 |
0.75 |
25,088.25 |
1.30 |
43,486.30 |
| 701-01-I |
cross drain pipe (24" rcp)
|
72   |
LNFT |
63.00 |
4,536.00 |
60.00 |
4,320.00 |
140.00 |
10,080.00 |
75.00 |
5,400.00 |
| 701-01-K |
cross drain pipe (30" rcp)
|
320   |
LNFT |
59.00 |
18,880.00 |
100.00 |
32,000.00 |
150.00 |
48,000.00 |
92.00 |
29,440.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
64   |
LNFT |
98.00 |
6,272.00 |
80.00 |
5,120.00 |
145.00 |
9,280.00 |
82.00 |
5,248.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
40   |
LNFT |
94.00 |
3,760.00 |
100.00 |
4,000.00 |
150.00 |
6,000.00 |
92.00 |
3,680.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
352   |
LNFT |
84.50 |
29,744.00 |
120.00 |
42,240.00 |
150.00 |
52,800.00 |
108.00 |
38,016.00 |
| 701-02-P |
cross drain pipe arch (96" equiv. rcpa)
|
24   |
LNFT |
618.00 |
14,832.00 |
800.00 |
19,200.00 |
900.00 |
21,600.00 |
800.00 |
19,200.00 |
| 701-03-F |
storm drain pipe (15" rcp)
|
52   |
LNFT |
45.00 |
2,340.00 |
200.00 |
10,400.00 |
80.00 |
4,160.00 |
43.00 |
2,236.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
2,638   |
LNFT |
50.00 |
131,900.00 |
60.00 |
158,280.00 |
97.00 |
255,886.00 |
50.00 |
131,900.00 |
| 701-05-I |
side drain pipe (24")(cmp)
|
94   |
LNFT |
62.00 |
5,828.00 |
60.00 |
5,640.00 |
100.00 |
9,400.00 |
41.00 |
3,854.00 |
| 701-05-I-01 |
side drain pipe (24")(cmp)(erosion)
|
320   |
LNFT |
53.00 |
16,960.00 |
60.00 |
19,200.00 |
100.00 |
32,000.00 |
41.00 |
13,120.00 |
| 701-05-I-02 |
side drain pipe (24")(cmp)(rcp)
|
104   |
LNFT |
62.00 |
6,448.00 |
60.00 |
6,240.00 |
100.00 |
10,400.00 |
41.00 |
4,264.00 |
| 701-06-E |
side drain pipe arch (30" equiv.)
|
56   |
LNFT |
73.00 |
4,088.00 |
100.00 |
5,600.00 |
120.00 |
6,720.00 |
71.00 |
3,976.00 |
| 701-12-M |
corrugated metal pipe (extension)(36")
|
96   |
LNFT |
115.00 |
11,040.00 |
120.00 |
11,520.00 |
200.00 |
19,200.00 |
66.00 |
6,336.00 |
| 701-14 |
cleaning existing pipes
|
850   |
LNFT |
6.60 |
5,610.00 |
20.00 |
17,000.00 |
15.00 |
12,750.00 |
13.00 |
11,050.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
1,000.00 |
2,000.00 |
500.00 |
1,000.00 |
8,000.00 |
16,000.00 |
705.00 |
1,410.00 |
| 702-03-A |
catch basins (cb-01)
|
8   |
EACH |
3,275.00 |
26,200.00 |
3,000.00 |
24,000.00 |
3,500.00 |
28,000.00 |
2,000.00 |
16,000.00 |
| 702-03-C |
catch basins (cb-06)
|
3   |
EACH |
3,380.00 |
10,140.00 |
5,000.00 |
15,000.00 |
4,300.00 |
12,900.00 |
3,000.00 |
9,000.00 |
| 702-04-B |
adjusting catch basins
|
3   |
EACH |
900.00 |
2,700.00 |
2,200.00 |
6,600.00 |
600.00 |
1,800.00 |
800.00 |
2,400.00 |
| 702-08-B |
side drain safety end (type 2)
|
6   |
EACH |
3,175.00 |
19,050.00 |
3,300.00 |
19,800.00 |
2,800.00 |
16,800.00 |
3,000.00 |
18,000.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
62.5 |
LNFT |
49.00 |
3,062.50 |
45.00 |
2,812.50 |
48.00 |
3,000.00 |
47.00 |
2,937.50 |
| 704-03 |
blocked out guard rail
|
262.5 |
LNFT |
20.50 |
5,381.25 |
22.00 |
5,775.00 |
20.00 |
5,250.00 |
21.00 |
5,512.50 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
6.3 |
LNFT |
77.00 |
485.10 |
80.00 |
504.00 |
72.00 |
453.60 |
81.00 |
510.30 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
46.00 |
4,600.00 |
50.00 |
5,000.00 |
44.00 |
4,400.00 |
47.00 |
4,700.00 |
| 704-11-A |
guard rail end treatment (flared)
|
5   |
EACH |
2,150.00 |
10,750.00 |
2,200.00 |
11,000.00 |
2,000.00 |
10,000.00 |
2,000.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
5,962   |
LNFT |
4.50 |
26,829.00 |
4.50 |
26,829.00 |
4.00 |
23,848.00 |
5.00 |
29,810.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
399.2 |
SQYD |
44.00 |
17,564.80 |
40.00 |
15,968.00 |
40.00 |
15,968.00 |
44.00 |
17,564.80 |
| 707-03 |
combination concrete curb & gutter
|
2,603.7 |
LNFT |
18.45 |
48,038.26 |
22.00 |
57,281.40 |
16.00 |
41,659.20 |
32.00 |
83,318.40 |
| 708-01 |
right-of-way monument
|
25   |
EACH |
135.00 |
3,375.00 |
75.00 |
1,875.00 |
165.00 |
4,125.00 |
134.00 |
3,350.00 |
| 712-04 |
flexible revetment
|
1,090   |
SQYD |
44.00 |
47,960.00 |
50.00 |
54,500.00 |
45.00 |
49,050.00 |
58.00 |
63,220.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
| 713-04-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
4.592 |
MILE |
3,885.00 |
17,839.92 |
3,500.00 |
16,072.00 |
3,800.00 |
17,449.60 |
4,000.00 |
18,368.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
14.254 |
MILE |
12,000.00 |
171,048.00 |
11,100.00 |
158,219.40 |
11,500.00 |
163,921.00 |
12,000.00 |
171,048.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
606   |
EACH |
4.95 |
2,999.70 |
5.00 |
3,030.00 |
5.00 |
3,030.00 |
5.00 |
3,030.00 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
32   |
EACH |
47.00 |
1,504.00 |
500.00 |
16,000.00 |
220.00 |
7,040.00 |
500.00 |
16,000.00 |
| 717-01 |
seeding
|
2,904   |
LB |
6.65 |
19,311.60 |
7.00 |
20,328.00 |
6.00 |
17,424.00 |
6.00 |
17,424.00 |
| 718-01 |
fertilizer
|
96,800   |
LB |
0.25 |
24,200.00 |
0.20 |
19,360.00 |
0.20 |
19,360.00 |
0.20 |
19,360.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
85.00 |
8,500.00 |
60.00 |
6,000.00 |
45.00 |
4,500.00 |
65.00 |
6,500.00 |
| 724-01-B |
pavement patching (12"minimum thickness)
|
100   |
SQYD |
139.00 |
13,900.00 |
80.00 |
8,000.00 |
100.00 |
10,000.00 |
100.00 |
10,000.00 |
| 726-01 |
bedding material
|
2,554.4 |
CUYD |
45.35 |
115,842.04 |
40.00 |
102,176.00 |
38.00 |
97,067.20 |
40.00 |
102,176.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
227,000.00 |
227,000.00 |
581,000.00 |
581,000.00 |
608,000.00 |
608,000.00 |
850,000.00 |
850,000.00 |
| 729-01-A |
sign (type a) (r10-10) (left turn signal)
|
20.0 |
SQFT |
39.00 |
780.00 |
20.00 |
400.00 |
20.00 |
400.00 |
38.00 |
760.00 |
| 729-01-B |
sign (type a) (r3-sl) (only)
|
15.0 |
SQFT |
39.00 |
585.00 |
25.00 |
375.00 |
22.00 |
330.00 |
38.00 |
570.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
75.00 |
300.00 |
70.00 |
280.00 |
70.00 |
280.00 |
| 730-05 |
light pole (30',single arm)
|
1   |
EACH |
2,681.00 |
2,681.00 |
5,200.00 |
5,200.00 |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
| 730-15 |
relocate light pole (30', single arm)
|
1   |
EACH |
2,871.00 |
2,871.00 |
6,000.00 |
6,000.00 |
5,800.00 |
5,800.00 |
2,800.00 |
2,800.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,197   |
EACH |
5.60 |
6,703.20 |
5.50 |
6,583.50 |
5.50 |
6,583.50 |
5.00 |
5,985.00 |
| 732-01-C-03 |
plastic pavement striping (solid line) (8" width) hot
appl. thermoplastic (40 mil) |
3,892   |
LNFT |
0.88 |
3,424.96 |
0.90 |
3,502.80 |
0.80 |
3,113.60 |
1.00 |
3,892.00 |
| 732-01-E-03 |
plastic pavement striping (solid line)(24" width) hot
appl. thermoplastic (40 mil) |
246   |
LNFT |
2.66 |
654.36 |
2.50 |
615.00 |
2.50 |
615.00 |
3.00 |
738.00 |
| 732-02-A-03 |
plastic pavement striping (solid line) (4" width) hot
appl. thermoplastic (40 mil) |
8.540 |
MILE |
2,051.00 |
17,515.54 |
2,000.00 |
17,080.00 |
2,000.00 |
17,080.00 |
2,000.00 |
17,080.00 |
| 732-03-A-03 |
plastic pavement striping (broken line)(4" width) hot
appl. thermoplastic (40 mil) |
3.700 |
MILE |
828.00 |
3,063.60 |
800.00 |
2,960.00 |
800.00 |
2,960.00 |
1,000.00 |
3,700.00 |
| 732-04-A-03 |
plastic pavement legends & symbols (arrow) hot appl.
thermoplastic (40 mil) |
33   |
EACH |
138.00 |
4,554.00 |
130.00 |
4,290.00 |
125.00 |
4,125.00 |
134.00 |
4,422.00 |
| 732-04-C-03 |
plastic pavement legends & symbols (only) hot appl.
thermoplastic (40 mil) |
10   |
EACH |
127.00 |
1,270.00 |
120.00 |
1,200.00 |
120.00 |
1,200.00 |
124.00 |
1,240.00 |
| 732-05 |
removal of existing markings
|
2.148 |
MILE |
4,600.00 |
9,880.80 |
4,800.00 |
10,310.40 |
4,500.00 |
9,666.00 |
4,200.00 |
9,021.60 |
| 736-01 |
trenching and backfilling
|
509   |
LNFT |
2.60 |
1,323.40 |
2.80 |
1,425.20 |
2.75 |
1,399.75 |
3.00 |
1,527.00 |
| 736-03 |
jacked or bored conduit (3" p.e.c.)
|
795   |
LNFT |
18.00 |
14,310.00 |
17.00 |
13,515.00 |
17.00 |
13,515.00 |
18.00 |
14,310.00 |
| 736-04-A |
signal support (mast arm standard w/35 ft. arm)
|
1   |
EACH |
10,200.00 |
10,200.00 |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 736-04-B |
signal support (mast arm standard w/40 ft. arm)
|
1   |
EACH |
11,500.00 |
11,500.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
11,000.00 |
| 736-04-C |
signal support (mast arm standard w/45 ft. arm)
|
1   |
EACH |
11,500.00 |
11,500.00 |
12,000.00 |
12,000.00 |
11,500.00 |
11,500.00 |
11,000.00 |
11,000.00 |
| 736-04-D |
signal support (mast arm standard w/35 ft. and 45 ft.
arms) |
1   |
EACH |
14,750.00 |
14,750.00 |
15,000.00 |
15,000.00 |
14,500.00 |
14,500.00 |
14,000.00 |
14,000.00 |
| 736-04-E |
signal support (mast arm standard w/40 ft. and 45 ft.
arms) |
1   |
EACH |
16,200.00 |
16,200.00 |
16,000.00 |
16,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
| 736-04-F |
signal support (mast arm standard w/45 ft. and 45 ft.
arms) |
1   |
EACH |
16,600.00 |
16,600.00 |
16,000.00 |
16,000.00 |
15,500.00 |
15,500.00 |
16,000.00 |
16,000.00 |
| 736-05-A |
signal head (3-section r, y, g, 12" lens)
|
21   |
EACH |
1,075.00 |
22,575.00 |
1,400.00 |
29,400.00 |
1,300.00 |
27,300.00 |
1,000.00 |
21,000.00 |
| 736-05-B |
signal head (3-section r, y, g, 12" lens)
|
3   |
EACH |
995.00 |
2,985.00 |
2,400.00 |
7,200.00 |
2,200.00 |
6,600.00 |
900.00 |
2,700.00 |
| 736-06 |
signal service
|
2   |
EACH |
1,575.00 |
3,150.00 |
1,050.00 |
2,100.00 |
1,000.00 |
2,000.00 |
1,500.00 |
3,000.00 |
| 736-08 |
signal controller
|
2   |
EACH |
21,000.00 |
42,000.00 |
14,000.00 |
28,000.00 |
13,500.00 |
27,000.00 |
20,000.00 |
40,000.00 |
| 736-09 |
loop detector (sawcut. loop wire, sealant)
|
240   |
LNFT |
9.50 |
2,280.00 |
14.00 |
3,360.00 |
14.00 |
3,360.00 |
9.00 |
2,160.00 |
| 736-10-A |
underground junction box - type f
|
17   |
EACH |
610.00 |
10,370.00 |
500.00 |
8,500.00 |
450.00 |
7,650.00 |
600.00 |
10,200.00 |
| 736-10-B |
underground junction box - type h
|
1   |
EACH |
910.00 |
910.00 |
1,100.00 |
1,100.00 |
1,100.00 |
1,100.00 |
900.00 |
900.00 |
| 736-11-A |
conduit (1" p.e.c.)
|
340   |
LNFT |
2.15 |
731.00 |
3.30 |
1,122.00 |
3.20 |
1,088.00 |
2.00 |
680.00 |
| 736-11-B |
conduit (2" p.e.c.)
|
30   |
LNFT |
3.65 |
109.50 |
4.50 |
135.00 |
4.50 |
135.00 |
4.00 |
120.00 |
| 736-11-C |
conduit (3" p.e.c.)
|
190   |
LNFT |
6.10 |
1,159.00 |
5.00 |
950.00 |
5.00 |
950.00 |
6.00 |
1,140.00 |
| 736-12-A |
conductor, 2c (shielded)
|
640   |
LNFT |
1.05 |
672.00 |
1.20 |
768.00 |
1.20 |
768.00 |
1.00 |
640.00 |
| 736-12-B |
conductor, 3c (power #6 awg)
|
100   |
LNFT |
2.60 |
260.00 |
1.10 |
110.00 |
1.00 |
100.00 |
3.00 |
300.00 |
| 736-12-C |
conductor, 6c (signal #14 awg)
|
590   |
LNFT |
1.44 |
849.60 |
1.10 |
649.00 |
1.00 |
590.00 |
1.30 |
767.00 |
| 736-12-D |
conductor, 10c (signal #14 awg)
|
2,680   |
LNFT |
1.90 |
5,092.00 |
1.50 |
4,020.00 |
1.50 |
4,020.00 |
2.00 |
5,360.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
115,000.00 |
115,000.00 |
100,000.00 |
100,000.00 |
75,000.00 |
75,000.00 |
133,000.00 |
133,000.00 |
| 804-01-B |
precast concrete piles (14")
|
2,580   |
LNFT |
29.60 |
76,368.00 |
31.00 |
79,980.00 |
23.00 |
59,340.00 |
30.00 |
77,400.00 |
| 804-01-C |
precast concrete piles (16")
|
680   |
LNFT |
58.00 |
39,440.00 |
60.00 |
40,800.00 |
38.00 |
25,840.00 |
60.00 |
40,800.00 |
| 804-01-F |
precast concrete piles (24")
|
850   |
LNFT |
74.00 |
62,900.00 |
77.00 |
65,450.00 |
66.00 |
56,100.00 |
76.00 |
64,600.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
526.00 |
1,052.00 |
550.00 |
1,100.00 |
5,000.00 |
10,000.00 |
540.00 |
1,080.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
40.67 |
CUYD |
910.00 |
37,009.70 |
1,400.00 |
56,938.00 |
2,400.00 |
97,608.00 |
1,000.00 |
40,670.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
44.36 |
CUYD |
1,000.00 |
44,360.00 |
1,700.00 |
75,412.00 |
914.00 |
40,545.04 |
1,000.00 |
44,360.00 |
| 805-01-F |
class a concrete (bents)
|
147.14 |
CUYD |
690.00 |
101,526.60 |
700.00 |
102,998.00 |
900.00 |
132,426.00 |
700.00 |
102,998.00 |
| 805-03 |
class aa concrete
|
253.36 |
CUYD |
640.00 |
162,150.40 |
650.00 |
164,684.00 |
710.00 |
179,885.60 |
700.00 |
177,352.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
1,155.0 |
LNFT |
79.00 |
91,245.00 |
80.00 |
92,400.00 |
75.00 |
86,625.00 |
80.00 |
92,400.00 |
| 805-11 |
strip seal joints
|
91.50 |
LNFT |
132.00 |
12,078.00 |
140.00 |
12,810.00 |
115.00 |
10,522.50 |
130.00 |
11,895.00 |
| 805-12-S |
reinforced concrete box culverts (8'x 8')
|
192.0 |
LNFT |
650.00 |
124,800.00 |
700.00 |
134,400.00 |
937.00 |
179,904.00 |
510.00 |
97,920.00 |
| 806-01 |
deformed reinforcing steel
|
99,638   |
LB |
0.75 |
74,728.50 |
0.80 |
79,710.40 |
0.86 |
85,688.68 |
1.00 |
99,638.00 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
16,000.00 |
16,000.00 |
17,000.00 |
17,000.00 |
4,000.00 |
4,000.00 |
16,000.00 |
16,000.00 |
| 810-01 |
concrete railing (barrier)
|
734.50 |
LNFT |
49.00 |
35,990.50 |
50.00 |
36,725.00 |
100.00 |
73,450.00 |
47.00 |
34,521.50 |
| 813-01 |
concrete approach slabs
|
720.00 |
SQYD |
163.00 |
117,360.00 |
160.00 |
115,200.00 |
165.00 |
118,800.00 |
160.00 |
115,200.00 |
| S-001 |
sawcutting asphaltic concrete, (per inch per foot)
|
11,700.00 |
IPFT |
0.55 |
6,435.00 |
0.50 |
5,850.00 |
0.50 |
5,850.00 |
1.00 |
11,700.00 |
| S-002 |
conflict box
|
1   |
EACH |
14,000.00 |
14,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
6,100.00 |
6,100.00 |
| S-003 |
clean out existing inlets
|
5   |
EACH |
400.00 |
2,000.00 |
200.00 |
1,000.00 |
400.00 |
2,000.00 |
210.00 |
1,050.00 |
| S-004 |
exploratory excavation
|
50   |
EACH |
750.00 |
37,500.00 |
600.00 |
30,000.00 |
750.00 |
37,500.00 |
300.00 |
15,000.00 |
| S-005 |
dam removal and replacement (labranche canal)
|
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
5,100.00 |
5,100.00 |
| S-006 |
initial installation & final removal of dams
(labranche canal) |
lump |
LUMP |
16,000.00 |
16,000.00 |
9,000.00 |
9,000.00 |
1,000.00 |
1,000.00 |
5,100.00 |
5,100.00 |
| S-007 |
dam removal and replacement (main canal)
|
1   |
EACH |
6,400.00 |
6,400.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
20,000.00 |
20,000.00 |
| S-008 |
initial installation & final removal of dams (main
canal) |
lump |
LUMP |
16,000.00 |
16,000.00 |
25,000.00 |
25,000.00 |
1,000.00 |
1,000.00 |
60,000.00 |
60,000.00 |
| S-009 |
future utility conduit
|
1,270   |
LNFT |
160.00 |
203,200.00 |
150.00 |
190,500.00 |
190.00 |
241,300.00 |
150.00 |
190,500.00 |
| S-010 |
transplanting
|
7   |
ea |
1,000.00 |
7,000.00 |
1,000.00 |
7,000.00 |
900.00 |
6,300.00 |
1,000.00 |
7,000.00 |
| S-011 |
geogrid
|
25,928   |
SQYD |
2.10 |
54,448.80 |
2.00 |
51,856.00 |
2.50 |
64,820.00 |
3.00 |
77,784.00 |
| S-012 |
video camera
|
8   |
EACH |
5,775.00 |
46,200.00 |
6,000.00 |
48,000.00 |
5,500.00 |
44,000.00 |
5,400.00 |
43,200.00 |
| S-013 |
video cable
|
1,160   |
LNFT |
3.10 |
3,596.00 |
5.00 |
5,800.00 |
4.50 |
5,220.00 |
3.00 |
3,480.00 |
| S-014 |
emergency preemption optical device
|
4   |
EACH |
2,175.00 |
8,700.00 |
2,000.00 |
8,000.00 |
1,900.00 |
7,600.00 |
2,200.00 |
8,800.00 |
| S-015 |
emergency preemption cable
|
1,000   |
LNFT |
1.20 |
1,200.00 |
1.00 |
1,000.00 |
1.00 |
1,000.00 |
1.20 |
1,200.00 |
| S-016 |
sign brackets (mast arm)
|
14   |
EACH |
210.00 |
2,940.00 |
130.00 |
1,820.00 |
125.00 |
1,750.00 |
200.00 |
2,800.00 |
| S-017 |
untreated timber foundations for bedding material
|
67.00 |
MFBM |
700.00 |
46,900.00 |
600.00 |
40,200.00 |
500.00 |
33,500.00 |
800.00 |
53,600.00 |
| S-101 |
saw cutting (1" depth)
|
330   |
LNFT |
1.10 |
363.00 |
1.50 |
495.00 |
10.00 |
3,300.00 |
2.00 |
660.00 |
| S-102 |
removal of concrete decking and barrier rail
|
lump |
LUMP |
16,000.00 |
16,000.00 |
17,000.00 |
17,000.00 |
10,000.00 |
10,000.00 |
16,000.00 |
16,000.00 |
| S-103 |
extend existing strip seal joints
|
54   |
LNFT |
135.00 |
7,290.00 |
140.00 |
7,560.00 |
130.00 |
7,020.00 |
136.00 |
7,344.00 |
| S-104 |
clean and seal existing joints
|
lump |
LUMP |
2,150.00 |
2,150.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,818,170.72 |
|
8,232,032.20 |
|
8,530,170.92 |
|
8,692,801.90 |
|