Letting of 10/27/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-26-0030
Parish: JEFFERSON
Routes:
Description: LAPALCO BLVD. WIDENING IMPROVEMENTS (US 90 TO SEGNETTE BLVD)
Type Const: grading, cold planing asphaltic concrete, drain struct., class ii bc, superpave
acp., precast prestressed concrete girder span bridge and related work.
 
RankLicenseBidderAmount
135678 BEVERLY CONSTRUCTION CO. LLC $7,818,170.72
206276 BARRIERE CONSTRUCTION CO., LLC. $8,232,032.20
302179 BOH BROS. CONSTRUCTION CO., LLC. $8,530,170.92
406487 HUEY STOCKSTILL, INC. $8,692,801.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
BEVERLY CONSTRUCTION CO. LLC
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.
- 4 -
HUEY STOCKSTILL, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 108,000.00 108,000.00 120,000.00 120,000.00 35,000.00 35,000.00 200,000.00 200,000.00
202-01 removal of structures & obstructions lump      LUMP 16,500.00 16,500.00 18,000.00 18,000.00 8,000.00 8,000.00 20,000.00 20,000.00
202-02-C removal of portland cement concrete pavement 24      SQYD 21.00 504.00 20.00 480.00 20.00 480.00 12.00 288.00
202-02-F removal of concrete combination curb & gutter 1,623.1    LNFT 10.00 16,231.00 5.00 8,115.50 4.00 6,492.40 5.00 8,115.50
202-02-G removal of surfacing & stabilized base 1,300.8    SQYD 4.60 5,983.68 3.00 3,902.40 6.00 7,804.80 6.00 7,804.80
202-02-H removal of guard rail 324      LNFT 5.50 1,782.00 3.00 972.00 5.00 1,620.00 3.00 972.00
202-02-I removal of approach slabs 134      SQYD 17.00 2,278.00 35.00 4,690.00 40.00 5,360.00 33.00 4,422.00
202-02-01 removal of fence 6,052      LNFT 1.82 11,014.64 1.00 6,052.00 2.50 15,130.00 3.00 18,156.00
202-02-02 removal of existing signal equip. & relocated items lump      LUMP 7,146.06 7,146.06 2,000.00 2,000.00 6,500.00 6,500.00 7,000.00 7,000.00
203-01 general excavation 53,827      CUYD 5.85 314,887.95 6.00 322,962.00 8.00 430,616.00 6.00 322,962.00
203-02 drainage excavation 2,780      CUYD 7.12 19,793.60 15.00 41,700.00 11.00 30,580.00 16.00 44,480.00
203-04 embankment 10,829      CUYD 9.20 99,626.80 8.00 86,632.00 12.00 129,948.00 5.00 54,145.00
203-05 nonplastic embankment 78,774      CUYD 9.09 716,055.66 12.00 945,288.00 12.00 945,288.00 13.00 1,024,062.00
203-09 geotextile fabric 672      SQYD 1.15 772.80 2.00 1,344.00 1.00 672.00 1.00 672.00
204-02 temporary hay or straw bales 100      EACH 11.00 1,100.00 8.00 800.00 8.00 800.00 9.00 900.00
204-06 temporary silt fencing 45,800      LNFT 2.35 107,630.00 1.00 45,800.00 1.30 59,540.00 2.00 91,600.00
302-02-D class ii base course (12" thick) 80,973.1    SQYD 14.75 1,194,353.22 15.00 1,214,596.50 16.00 1,295,569.60 15.00 1,214,596.50
401-01 aggregate surface course (net section) (4" thick) 23.2    CUYD 53.00 1,229.60 75.00 1,740.00 45.00 1,044.00 37.00 858.40
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 35.00 17,500.00 45.00 22,500.00 30.00 15,000.00 34.00 17,000.00
502-01 superpave asphaltic concrete 33,122.8    TON 62.00 2,053,613.60 56.00 1,854,876.80 54.50 1,805,192.60 56.00 1,854,876.80
509-01 cold planing asphaltic pavement 33,451      SQYD 1.48 49,507.48 1.40 46,831.40 0.75 25,088.25 1.30 43,486.30
701-01-I cross drain pipe (24" rcp) 72      LNFT 63.00 4,536.00 60.00 4,320.00 140.00 10,080.00 75.00 5,400.00
701-01-K cross drain pipe (30" rcp) 320      LNFT 59.00 18,880.00 100.00 32,000.00 150.00 48,000.00 92.00 29,440.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 64      LNFT 98.00 6,272.00 80.00 5,120.00 145.00 9,280.00 82.00 5,248.00
701-02-E cross drain pipe arch (30" equiv. rcpa) 40      LNFT 94.00 3,760.00 100.00 4,000.00 150.00 6,000.00 92.00 3,680.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 352      LNFT 84.50 29,744.00 120.00 42,240.00 150.00 52,800.00 108.00 38,016.00
701-02-P cross drain pipe arch (96" equiv. rcpa) 24      LNFT 618.00 14,832.00 800.00 19,200.00 900.00 21,600.00 800.00 19,200.00
701-03-F storm drain pipe (15" rcp) 52      LNFT 45.00 2,340.00 200.00 10,400.00 80.00 4,160.00 43.00 2,236.00
701-03-I storm drain pipe (24" rcp/pcp) 2,638      LNFT 50.00 131,900.00 60.00 158,280.00 97.00 255,886.00 50.00 131,900.00
701-05-I side drain pipe (24")(cmp) 94      LNFT 62.00 5,828.00 60.00 5,640.00 100.00 9,400.00 41.00 3,854.00
701-05-I-01 side drain pipe (24")(cmp)(erosion) 320      LNFT 53.00 16,960.00 60.00 19,200.00 100.00 32,000.00 41.00 13,120.00
701-05-I-02 side drain pipe (24")(cmp)(rcp) 104      LNFT 62.00 6,448.00 60.00 6,240.00 100.00 10,400.00 41.00 4,264.00
701-06-E side drain pipe arch (30" equiv.) 56      LNFT 73.00 4,088.00 100.00 5,600.00 120.00 6,720.00 71.00 3,976.00
701-12-M corrugated metal pipe (extension)(36") 96      LNFT 115.00 11,040.00 120.00 11,520.00 200.00 19,200.00 66.00 6,336.00
701-14 cleaning existing pipes 850      LNFT 6.60 5,610.00 20.00 17,000.00 15.00 12,750.00 13.00 11,050.00
701-15 concrete collar 2      EACH 1,000.00 2,000.00 500.00 1,000.00 8,000.00 16,000.00 705.00 1,410.00
702-03-A catch basins (cb-01) 8      EACH 3,275.00 26,200.00 3,000.00 24,000.00 3,500.00 28,000.00 2,000.00 16,000.00
702-03-C catch basins (cb-06) 3      EACH 3,380.00 10,140.00 5,000.00 15,000.00 4,300.00 12,900.00 3,000.00 9,000.00
702-04-B adjusting catch basins 3      EACH 900.00 2,700.00 2,200.00 6,600.00 600.00 1,800.00 800.00 2,400.00
702-08-B side drain safety end (type 2) 6      EACH 3,175.00 19,050.00 3,300.00 19,800.00 2,800.00 16,800.00 3,000.00 18,000.00
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 62.5    LNFT 49.00 3,062.50 45.00 2,812.50 48.00 3,000.00 47.00 2,937.50
704-03 blocked out guard rail 262.5    LNFT 20.50 5,381.25 22.00 5,775.00 20.00 5,250.00 21.00 5,512.50
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 77.00 485.10 80.00 504.00 72.00 453.60 81.00 510.30
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 46.00 4,600.00 50.00 5,000.00 44.00 4,400.00 47.00 4,700.00
704-11-A guard rail end treatment (flared) 5      EACH 2,150.00 10,750.00 2,200.00 11,000.00 2,000.00 10,000.00 2,000.00 10,000.00
705-01 barbed wire fence 5,962      LNFT 4.50 26,829.00 4.50 26,829.00 4.00 23,848.00 5.00 29,810.00
706-03-C incidental concrete paving (6" thick) 399.2    SQYD 44.00 17,564.80 40.00 15,968.00 40.00 15,968.00 44.00 17,564.80
707-03 combination concrete curb & gutter 2,603.7    LNFT 18.45 48,038.26 22.00 57,281.40 16.00 41,659.20 32.00 83,318.40
708-01 right-of-way monument 25      EACH 135.00 3,375.00 75.00 1,875.00 165.00 4,125.00 134.00 3,350.00
712-04 flexible revetment 1,090      SQYD 44.00 47,960.00 50.00 54,500.00 45.00 49,050.00 58.00 63,220.00
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 50,000.00 50,000.00 60,000.00 60,000.00 60,000.00 60,000.00
713-04-B-01 temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable)
4.592  MILE 3,885.00 17,839.92 3,500.00 16,072.00 3,800.00 17,449.60 4,000.00 18,368.00
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
14.254  MILE 12,000.00 171,048.00 11,100.00 158,219.40 11,500.00 163,921.00 12,000.00 171,048.00
713-07 temporary reflectorized raised pavement markers 606      EACH 4.95 2,999.70 5.00 3,030.00 5.00 3,030.00 5.00 3,030.00
713-09 temporary precast concrete barrier (department
furnished)
32      EACH 47.00 1,504.00 500.00 16,000.00 220.00 7,040.00 500.00 16,000.00
717-01 seeding 2,904      LB 6.65 19,311.60 7.00 20,328.00 6.00 17,424.00 6.00 17,424.00
718-01 fertilizer 96,800      LB 0.25 24,200.00 0.20 19,360.00 0.20 19,360.00 0.20 19,360.00
722-01 project site laboratory 1      EACH 80,000.00 80,000.00 20,000.00 20,000.00 6,000.00 6,000.00 10,000.00 10,000.00
724-01-A pavement patching (6" minimum thickness) 100      SQYD 85.00 8,500.00 60.00 6,000.00 45.00 4,500.00 65.00 6,500.00
724-01-B pavement patching (12"minimum thickness) 100      SQYD 139.00 13,900.00 80.00 8,000.00 100.00 10,000.00 100.00 10,000.00
726-01 bedding material 2,554.4    CUYD 45.35 115,842.04 40.00 102,176.00 38.00 97,067.20 40.00 102,176.00
727-01 mobilization lump      LUMP 227,000.00 227,000.00 581,000.00 581,000.00 608,000.00 608,000.00 850,000.00 850,000.00
729-01-A sign (type a) (r10-10) (left turn signal) 20.0    SQFT 39.00 780.00 20.00 400.00 20.00 400.00 38.00 760.00
729-01-B sign (type a) (r3-sl) (only) 15.0    SQFT 39.00 585.00 25.00 375.00 22.00 330.00 38.00 570.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 75.00 300.00 70.00 280.00 70.00 280.00
730-05 light pole (30',single arm) 1      EACH 2,681.00 2,681.00 5,200.00 5,200.00 5,000.00 5,000.00 2,500.00 2,500.00
730-15 relocate light pole (30', single arm) 1      EACH 2,871.00 2,871.00 6,000.00 6,000.00 5,800.00 5,800.00 2,800.00 2,800.00
731-02 reflectorized raised pavement markers 1,197      EACH 5.60 6,703.20 5.50 6,583.50 5.50 6,583.50 5.00 5,985.00
732-01-C-03 plastic pavement striping (solid line) (8" width) hot
appl. thermoplastic (40 mil)
3,892      LNFT 0.88 3,424.96 0.90 3,502.80 0.80 3,113.60 1.00 3,892.00
732-01-E-03 plastic pavement striping (solid line)(24" width) hot
appl. thermoplastic (40 mil)
246      LNFT 2.66 654.36 2.50 615.00 2.50 615.00 3.00 738.00
732-02-A-03 plastic pavement striping (solid line) (4" width) hot
appl. thermoplastic (40 mil)
8.540  MILE 2,051.00 17,515.54 2,000.00 17,080.00 2,000.00 17,080.00 2,000.00 17,080.00
732-03-A-03 plastic pavement striping (broken line)(4" width) hot
appl. thermoplastic (40 mil)
3.700  MILE 828.00 3,063.60 800.00 2,960.00 800.00 2,960.00 1,000.00 3,700.00
732-04-A-03 plastic pavement legends & symbols (arrow) hot appl.
thermoplastic (40 mil)
33      EACH 138.00 4,554.00 130.00 4,290.00 125.00 4,125.00 134.00 4,422.00
732-04-C-03 plastic pavement legends & symbols (only) hot appl.
thermoplastic (40 mil)
10      EACH 127.00 1,270.00 120.00 1,200.00 120.00 1,200.00 124.00 1,240.00
732-05 removal of existing markings 2.148  MILE 4,600.00 9,880.80 4,800.00 10,310.40 4,500.00 9,666.00 4,200.00 9,021.60
736-01 trenching and backfilling 509      LNFT 2.60 1,323.40 2.80 1,425.20 2.75 1,399.75 3.00 1,527.00
736-03 jacked or bored conduit (3" p.e.c.) 795      LNFT 18.00 14,310.00 17.00 13,515.00 17.00 13,515.00 18.00 14,310.00
736-04-A signal support (mast arm standard w/35 ft. arm) 1      EACH 10,200.00 10,200.00 11,000.00 11,000.00 10,000.00 10,000.00 10,000.00 10,000.00
736-04-B signal support (mast arm standard w/40 ft. arm) 1      EACH 11,500.00 11,500.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00 11,000.00
736-04-C signal support (mast arm standard w/45 ft. arm) 1      EACH 11,500.00 11,500.00 12,000.00 12,000.00 11,500.00 11,500.00 11,000.00 11,000.00
736-04-D signal support (mast arm standard w/35 ft. and 45 ft.
arms)
1      EACH 14,750.00 14,750.00 15,000.00 15,000.00 14,500.00 14,500.00 14,000.00 14,000.00
736-04-E signal support (mast arm standard w/40 ft. and 45 ft.
arms)
1      EACH 16,200.00 16,200.00 16,000.00 16,000.00 15,000.00 15,000.00 15,000.00 15,000.00
736-04-F signal support (mast arm standard w/45 ft. and 45 ft.
arms)
1      EACH 16,600.00 16,600.00 16,000.00 16,000.00 15,500.00 15,500.00 16,000.00 16,000.00
736-05-A signal head (3-section r, y, g, 12" lens) 21      EACH 1,075.00 22,575.00 1,400.00 29,400.00 1,300.00 27,300.00 1,000.00 21,000.00
736-05-B signal head (3-section r, y, g, 12" lens) 3      EACH 995.00 2,985.00 2,400.00 7,200.00 2,200.00 6,600.00 900.00 2,700.00
736-06 signal service 2      EACH 1,575.00 3,150.00 1,050.00 2,100.00 1,000.00 2,000.00 1,500.00 3,000.00
736-08 signal controller 2      EACH 21,000.00 42,000.00 14,000.00 28,000.00 13,500.00 27,000.00 20,000.00 40,000.00
736-09 loop detector (sawcut. loop wire, sealant) 240      LNFT 9.50 2,280.00 14.00 3,360.00 14.00 3,360.00 9.00 2,160.00
736-10-A underground junction box - type f 17      EACH 610.00 10,370.00 500.00 8,500.00 450.00 7,650.00 600.00 10,200.00
736-10-B underground junction box - type h 1      EACH 910.00 910.00 1,100.00 1,100.00 1,100.00 1,100.00 900.00 900.00
736-11-A conduit (1" p.e.c.) 340      LNFT 2.15 731.00 3.30 1,122.00 3.20 1,088.00 2.00 680.00
736-11-B conduit (2" p.e.c.) 30      LNFT 3.65 109.50 4.50 135.00 4.50 135.00 4.00 120.00
736-11-C conduit (3" p.e.c.) 190      LNFT 6.10 1,159.00 5.00 950.00 5.00 950.00 6.00 1,140.00
736-12-A conductor, 2c (shielded) 640      LNFT 1.05 672.00 1.20 768.00 1.20 768.00 1.00 640.00
736-12-B conductor, 3c (power #6 awg) 100      LNFT 2.60 260.00 1.10 110.00 1.00 100.00 3.00 300.00
736-12-C conductor, 6c (signal #14 awg) 590      LNFT 1.44 849.60 1.10 649.00 1.00 590.00 1.30 767.00
736-12-D conductor, 10c (signal #14 awg) 2,680      LNFT 1.90 5,092.00 1.50 4,020.00 1.50 4,020.00 2.00 5,360.00
740-01 construction layout lump      LUMP 115,000.00 115,000.00 100,000.00 100,000.00 75,000.00 75,000.00 133,000.00 133,000.00
804-01-B precast concrete piles (14") 2,580      LNFT 29.60 76,368.00 31.00 79,980.00 23.00 59,340.00 30.00 77,400.00
804-01-C precast concrete piles (16") 680      LNFT 58.00 39,440.00 60.00 40,800.00 38.00 25,840.00 60.00 40,800.00
804-01-F precast concrete piles (24") 850      LNFT 74.00 62,900.00 77.00 65,450.00 66.00 56,100.00 76.00 64,600.00
804-12 loading permanent piles 2      EACH 526.00 1,052.00 550.00 1,100.00 5,000.00 10,000.00 540.00 1,080.00
805-01-A class a concrete (pipe headwalls) 40.67   CUYD 910.00 37,009.70 1,400.00 56,938.00 2,400.00 97,608.00 1,000.00 40,670.00
805-01-B class a concrete (box culvert headwalls) 44.36   CUYD 1,000.00 44,360.00 1,700.00 75,412.00 914.00 40,545.04 1,000.00 44,360.00
805-01-F class a concrete (bents) 147.14   CUYD 690.00 101,526.60 700.00 102,998.00 900.00 132,426.00 700.00 102,998.00
805-03 class aa concrete 253.36   CUYD 640.00 162,150.40 650.00 164,684.00 710.00 179,885.60 700.00 177,352.00
805-08-C precast-prestressed concrete girders (type iii) 1,155.0    LNFT 79.00 91,245.00 80.00 92,400.00 75.00 86,625.00 80.00 92,400.00
805-11 strip seal joints 91.50   LNFT 132.00 12,078.00 140.00 12,810.00 115.00 10,522.50 130.00 11,895.00
805-12-S reinforced concrete box culverts (8'x 8') 192.0    LNFT 650.00 124,800.00 700.00 134,400.00 937.00 179,904.00 510.00 97,920.00
806-01 deformed reinforcing steel 99,638      LB 0.75 74,728.50 0.80 79,710.40 0.86 85,688.68 1.00 99,638.00
807-06 structural metalwork lump      LUMP 16,000.00 16,000.00 17,000.00 17,000.00 4,000.00 4,000.00 16,000.00 16,000.00
810-01 concrete railing (barrier) 734.50   LNFT 49.00 35,990.50 50.00 36,725.00 100.00 73,450.00 47.00 34,521.50
813-01 concrete approach slabs 720.00   SQYD 163.00 117,360.00 160.00 115,200.00 165.00 118,800.00 160.00 115,200.00
S-001 sawcutting asphaltic concrete, (per inch per foot) 11,700.00   IPFT 0.55 6,435.00 0.50 5,850.00 0.50 5,850.00 1.00 11,700.00
S-002 conflict box 1      EACH 14,000.00 14,000.00 10,000.00 10,000.00 6,000.00 6,000.00 6,100.00 6,100.00
S-003 clean out existing inlets 5      EACH 400.00 2,000.00 200.00 1,000.00 400.00 2,000.00 210.00 1,050.00
S-004 exploratory excavation 50      EACH 750.00 37,500.00 600.00 30,000.00 750.00 37,500.00 300.00 15,000.00
S-005 dam removal and replacement (labranche canal) 1      EACH 6,000.00 6,000.00 5,000.00 5,000.00 1,000.00 1,000.00 5,100.00 5,100.00
S-006 initial installation & final removal of dams
(labranche canal)
lump      LUMP 16,000.00 16,000.00 9,000.00 9,000.00 1,000.00 1,000.00 5,100.00 5,100.00
S-007 dam removal and replacement (main canal) 1      EACH 6,400.00 6,400.00 5,000.00 5,000.00 1,000.00 1,000.00 20,000.00 20,000.00
S-008 initial installation & final removal of dams (main
canal)
lump      LUMP 16,000.00 16,000.00 25,000.00 25,000.00 1,000.00 1,000.00 60,000.00 60,000.00
S-009 future utility conduit 1,270      LNFT 160.00 203,200.00 150.00 190,500.00 190.00 241,300.00 150.00 190,500.00
S-010 transplanting 7      ea 1,000.00 7,000.00 1,000.00 7,000.00 900.00 6,300.00 1,000.00 7,000.00
S-011 geogrid 25,928      SQYD 2.10 54,448.80 2.00 51,856.00 2.50 64,820.00 3.00 77,784.00
S-012 video camera 8      EACH 5,775.00 46,200.00 6,000.00 48,000.00 5,500.00 44,000.00 5,400.00 43,200.00
S-013 video cable 1,160      LNFT 3.10 3,596.00 5.00 5,800.00 4.50 5,220.00 3.00 3,480.00
S-014 emergency preemption optical device 4      EACH 2,175.00 8,700.00 2,000.00 8,000.00 1,900.00 7,600.00 2,200.00 8,800.00
S-015 emergency preemption cable 1,000      LNFT 1.20 1,200.00 1.00 1,000.00 1.00 1,000.00 1.20 1,200.00
S-016 sign brackets (mast arm) 14      EACH 210.00 2,940.00 130.00 1,820.00 125.00 1,750.00 200.00 2,800.00
S-017 untreated timber foundations for bedding material 67.00   MFBM 700.00 46,900.00 600.00 40,200.00 500.00 33,500.00 800.00 53,600.00
S-101 saw cutting (1" depth) 330      LNFT 1.10 363.00 1.50 495.00 10.00 3,300.00 2.00 660.00
S-102 removal of concrete decking and barrier rail lump      LUMP 16,000.00 16,000.00 17,000.00 17,000.00 10,000.00 10,000.00 16,000.00 16,000.00
S-103 extend existing strip seal joints 54      LNFT 135.00 7,290.00 140.00 7,560.00 130.00 7,020.00 136.00 7,344.00
S-104 clean and seal existing joints lump      LUMP 2,150.00 2,150.00 6,000.00 6,000.00 10,000.00 10,000.00 6,000.00 6,000.00
                       
 CONTRACTOR TOTAL       7,818,170.72   8,232,032.20   8,530,170.92   8,692,801.90