| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUTCON, INC. |
- 2 - INDUSTRIAL ENTERPRISES, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
3,000.00 |
3,000.00 |
10,810.00 |
10,810.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
10,778.95 |
10,778.95 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
80   |
SQYD |
15.00 |
1,200.00 |
11.50 |
920.00 |
|
|
|
|
| 202-02-I |
removal of existing signal equipment and related items
|
lump |
LUMP |
2,960.10 |
2,960.10 |
3,094.65 |
3,094.65 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
14,000.00 |
14,000.00 |
62,453.66 |
62,453.66 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
28   |
EACH |
7.75 |
217.00 |
8.05 |
225.40 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
1   |
EACH |
150.00 |
150.00 |
172.50 |
172.50 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,132   |
LNFT |
1.00 |
1,132.00 |
1.61 |
1,822.52 |
|
|
|
|
| 302-02-E |
class ii base course (8" thick)
|
598.1 |
SQYD |
20.00 |
11,962.00 |
24.50 |
14,653.45 |
|
|
|
|
| 304-01 |
lime
|
3.30 |
TON |
140.00 |
462.00 |
276.00 |
910.80 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
233   |
SQYD |
2.00 |
466.00 |
14.81 |
3,450.73 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
102   |
CUYD |
40.00 |
4,080.00 |
92.00 |
9,384.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
10.0 |
CUYD |
50.00 |
500.00 |
34.50 |
345.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
394.9 |
TON |
110.00 |
43,439.00 |
70.00 |
27,643.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
440   |
SQYD |
15.00 |
6,600.00 |
11.50 |
5,060.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
288   |
LNFT |
40.00 |
11,520.00 |
63.76 |
18,362.88 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
86   |
LNFT |
40.00 |
3,440.00 |
59.55 |
5,121.30 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
48   |
LNFT |
80.00 |
3,840.00 |
114.09 |
5,476.32 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
3   |
EACH |
2,000.00 |
6,000.00 |
3,132.51 |
9,397.53 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,800.00 |
2,800.00 |
3,080.56 |
3,080.56 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
36.0 |
SQYD |
45.00 |
1,620.00 |
46.00 |
1,656.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,000.00 |
3,000.00 |
39,349.39 |
39,349.39 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.250 |
MILE |
6,600.00 |
1,650.00 |
6,900.00 |
1,725.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.55 |
ACRE |
600.00 |
330.00 |
1,380.00 |
759.00 |
|
|
|
|
| 717-01 |
seeding
|
33   |
LB |
10.00 |
330.00 |
20.70 |
683.10 |
|
|
|
|
| 718-01 |
fertilizer
|
542   |
LB |
1.00 |
542.00 |
0.58 |
314.36 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
426   |
SQYD |
2.00 |
852.00 |
2.07 |
881.82 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
192   |
SQYD |
2.00 |
384.00 |
4.60 |
883.20 |
|
|
|
|
| 726-01 |
bedding material
|
7.0 |
CUYD |
20.00 |
140.00 |
57.50 |
402.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
3,000.00 |
3,000.00 |
23,157.15 |
23,157.15 |
|
|
|
|
| 729-01 |
sign (type a)
|
47.5 |
SQFT |
27.50 |
1,306.25 |
28.75 |
1,365.62 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
29   |
EACH |
6.50 |
188.50 |
6.79 |
196.91 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
220   |
LNFT |
1.00 |
220.00 |
1.04 |
228.80 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
32   |
LNFT |
3.50 |
112.00 |
3.68 |
117.76 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.401 |
MILE |
2,178.00 |
873.37 |
2,277.00 |
913.07 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
192.00 |
384.00 |
201.25 |
402.50 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
248.00 |
496.00 |
258.75 |
517.50 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
214.00 |
428.00 |
224.25 |
448.50 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
1,160   |
LNFT |
4.00 |
4,640.00 |
4.20 |
4,872.00 |
|
|
|
|
| 736-04-A |
signal support (30' strain pole)
|
4   |
EACH |
5,873.00 |
23,492.00 |
6,139.85 |
24,559.40 |
|
|
|
|
| 736-05-B |
signal heads (l.e.d., 3 section, 12" lenses)
|
7   |
EACH |
836.00 |
5,852.00 |
874.00 |
6,118.00 |
|
|
|
|
| 736-05-C |
signal heads (l.e.d., 5 section, 12" lenses)
|
3   |
EACH |
1,237.50 |
3,712.50 |
1,293.75 |
3,881.25 |
|
|
|
|
| 736-06 |
signal service, power pedestal
|
1   |
EACH |
1,629.00 |
1,629.00 |
1,703.15 |
1,703.15 |
|
|
|
|
| 736-08 |
signal controller
|
1   |
EACH |
17,792.00 |
17,792.00 |
18,601.25 |
18,601.25 |
|
|
|
|
| 736-09 |
loop detector
|
205   |
LNFT |
9.90 |
2,029.50 |
10.35 |
2,121.75 |
|
|
|
|
| 736-10-A |
underground junction box (type e)
|
10   |
EACH |
396.00 |
3,960.00 |
414.00 |
4,140.00 |
|
|
|
|
| 736-10-B |
underground junction box (type h)
|
1   |
EACH |
860.00 |
860.00 |
899.30 |
899.30 |
|
|
|
|
| 736-11-A |
conduit (1/2" diam pec)
|
20   |
LNFT |
4.20 |
84.00 |
4.37 |
87.40 |
|
|
|
|
| 736-11-B |
conduit (1" diam pec)
|
1,090   |
LNFT |
3.60 |
3,924.00 |
3.74 |
4,076.60 |
|
|
|
|
| 736-11-C |
conduit (2" diam pec)
|
30   |
LNFT |
4.20 |
126.00 |
4.43 |
132.90 |
|
|
|
|
| 736-11-D |
conduit (3" diam pec)
|
20   |
LNFT |
8.25 |
165.00 |
8.63 |
172.60 |
|
|
|
|
| 736-12-A |
conductor, 2c (loop lead-in/#14 awg)
|
1,450   |
LNFT |
1.37 |
1,986.50 |
1.44 |
2,088.00 |
|
|
|
|
| 736-12-B |
conductor, 6c (signal/#14 awg)
|
185   |
LNFT |
1.90 |
351.50 |
2.01 |
371.85 |
|
|
|
|
| 736-12-C |
conductor, 10c (signal/#14 awg)
|
880   |
LNFT |
2.30 |
2,024.00 |
2.42 |
2,129.60 |
|
|
|
|
| 736-12-D |
conductor, 3c (power)
|
650   |
LNFT |
4.30 |
2,795.00 |
4.49 |
2,918.50 |
|
|
|
|
| 805-01-A |
class a concrete (pipe headwalls)
|
5.83 |
CUYD |
1,000.00 |
5,830.00 |
916.35 |
5,342.32 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
343   |
LB |
1.00 |
343.00 |
1.73 |
593.39 |
|
|
|
|
| S-001 |
unidirectional optical detector single channel
|
4   |
EACH |
753.50 |
3,014.00 |
787.75 |
3,151.00 |
|
|
|
|
| S-002 |
optical cable
|
605   |
LNFT |
1.75 |
1,058.75 |
1.84 |
1,113.20 |
|
|
|
|
| S-003 |
phase selector
|
1   |
EACH |
3,696.00 |
3,696.00 |
3,864.00 |
3,864.00 |
|
|
|
|
| S-004 |
video detector device and connection
|
4   |
EACH |
3,404.50 |
13,618.00 |
3,559.25 |
14,237.00 |
|
|
|
|
| S-005 |
video detection system (barringer @ airline)
|
1   |
EACH |
1,975.60 |
1,975.60 |
2,065.40 |
2,065.40 |
|
|
|
|
| S-006 |
remove and replace driveway gate
|
1   |
EACH |
800.00 |
800.00 |
575.00 |
575.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
241,382.57 |
|
376,980.29 |
|
|
|
|
|