Letting of 10/27/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-17-0132
Parish: E BATON ROUGE
Routes:
Description: BARRINGER FOREMAN ROAD AT AIRLINE HIGHWAY (US 61)
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, traffic signalization and related work.
 
RankLicenseBidderAmount
125587 GUTCON, INC. $241,382.57
205693 INDUSTRIAL ENTERPRISES, INC. $376,980.29
 
Item Number Item Description Quantity Unit of Measure - 1 -
GUTCON, INC.
- 2 -
INDUSTRIAL ENTERPRISES, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 3,000.00 3,000.00 10,810.00 10,810.00        
202-01 removal of structures & obstructions lump      LUMP 2,000.00 2,000.00 10,778.95 10,778.95        
202-02-D removal of concrete walks & drives 80      SQYD 15.00 1,200.00 11.50 920.00        
202-02-I removal of existing signal equipment and related items lump      LUMP 2,960.10 2,960.10 3,094.65 3,094.65        
203-06 excavation & embankment lump      LUMP 14,000.00 14,000.00 62,453.66 62,453.66        
204-02 temporary hay or straw bales 28      EACH 7.75 217.00 8.05 225.40        
204-05-A temporary sediment check dams (hay) 1      EACH 150.00 150.00 172.50 172.50        
204-06 temporary silt fencing 1,132      LNFT 1.00 1,132.00 1.61 1,822.52        
302-02-E class ii base course (8" thick) 598.1    SQYD 20.00 11,962.00 24.50 14,653.45        
304-01 lime 3.30   TON 140.00 462.00 276.00 910.80        
304-04-D lime treatment (type d) (12" thick) 233      SQYD 2.00 466.00 14.81 3,450.73        
401-02 aggregate surface course (adjusted vehicular
measurement)
102      CUYD 40.00 4,080.00 92.00 9,384.00        
402-01 traffic maintenance aggregate (vehicular measurement) 10.0    CUYD 50.00 500.00 34.50 345.00        
502-01 superpave asphaltic concrete 394.9    TON 110.00 43,439.00 70.00 27,643.00        
509-01 cold planing asphaltic pavement 440      SQYD 15.00 6,600.00 11.50 5,060.00        
701-03-G storm drain pipe (18" rcp/pcp) 288      LNFT 40.00 11,520.00 63.76 18,362.88        
701-05-G side drain pipe (18") 86      LNFT 40.00 3,440.00 59.55 5,121.30        
701-10-K reinforced concrete pipe (extension)(30") 48      LNFT 80.00 3,840.00 114.09 5,476.32        
702-02-B manholes (r-cb-11) 3      EACH 2,000.00 6,000.00 3,132.51 9,397.53        
702-03-A catch basins (cb-01) 1      EACH 2,800.00 2,800.00 3,080.56 3,080.56        
706-02-C concrete drive (6" thick) 36.0    SQYD 45.00 1,620.00 46.00 1,656.00        
713-01 temporary signs & barricades lump      LUMP 3,000.00 3,000.00 39,349.39 39,349.39        
713-05-A temporary pavement markings (solid line)(4" width) 0.250  MILE 6,600.00 1,650.00 6,900.00 1,725.00        
716-01-A mulch (vegetative) 0.55   ACRE 600.00 330.00 1,380.00 759.00        
717-01 seeding 33      LB 10.00 330.00 20.70 683.10        
718-01 fertilizer 542      LB 1.00 542.00 0.58 314.36        
720-01-A erosion control system, slope protection (type a) 426      SQYD 2.00 852.00 2.07 881.82        
720-01-D erosion control system, flexible channel liner (type d) 192      SQYD 2.00 384.00 4.60 883.20        
726-01 bedding material 7.0    CUYD 20.00 140.00 57.50 402.50        
727-01 mobilization lump      LUMP 3,000.00 3,000.00 23,157.15 23,157.15        
729-01 sign (type a) 47.5    SQFT 27.50 1,306.25 28.75 1,365.62        
731-02 reflectorized raised pavement markers 29      EACH 6.50 188.50 6.79 196.91        
732-01-C plastic pavement striping (8" width) 220      LNFT 1.00 220.00 1.04 228.80        
732-01-E plastic pavement striping (24" width) 32      LNFT 3.50 112.00 3.68 117.76        
732-02-A plastic pavement striping (solid line) (4" width) 0.401  MILE 2,178.00 873.37 2,277.00 913.07        
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 192.00 384.00 201.25 402.50        
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 248.00 496.00 258.75 517.50        
732-04-C plastic pavement legends & symbols (only) 2      EACH 214.00 428.00 224.25 448.50        
736-01 trenching and backfilling 1,160      LNFT 4.00 4,640.00 4.20 4,872.00        
736-04-A signal support (30' strain pole) 4      EACH 5,873.00 23,492.00 6,139.85 24,559.40        
736-05-B signal heads (l.e.d., 3 section, 12" lenses) 7      EACH 836.00 5,852.00 874.00 6,118.00        
736-05-C signal heads (l.e.d., 5 section, 12" lenses) 3      EACH 1,237.50 3,712.50 1,293.75 3,881.25        
736-06 signal service, power pedestal 1      EACH 1,629.00 1,629.00 1,703.15 1,703.15        
736-08 signal controller 1      EACH 17,792.00 17,792.00 18,601.25 18,601.25        
736-09 loop detector 205      LNFT 9.90 2,029.50 10.35 2,121.75        
736-10-A underground junction box (type e) 10      EACH 396.00 3,960.00 414.00 4,140.00        
736-10-B underground junction box (type h) 1      EACH 860.00 860.00 899.30 899.30        
736-11-A conduit (1/2" diam pec) 20      LNFT 4.20 84.00 4.37 87.40        
736-11-B conduit (1" diam pec) 1,090      LNFT 3.60 3,924.00 3.74 4,076.60        
736-11-C conduit (2" diam pec) 30      LNFT 4.20 126.00 4.43 132.90        
736-11-D conduit (3" diam pec) 20      LNFT 8.25 165.00 8.63 172.60        
736-12-A conductor, 2c (loop lead-in/#14 awg) 1,450      LNFT 1.37 1,986.50 1.44 2,088.00        
736-12-B conductor, 6c (signal/#14 awg) 185      LNFT 1.90 351.50 2.01 371.85        
736-12-C conductor, 10c (signal/#14 awg) 880      LNFT 2.30 2,024.00 2.42 2,129.60        
736-12-D conductor, 3c (power) 650      LNFT 4.30 2,795.00 4.49 2,918.50        
805-01-A class a concrete (pipe headwalls) 5.83   CUYD 1,000.00 5,830.00 916.35 5,342.32        
806-01 deformed reinforcing steel 343      LB 1.00 343.00 1.73 593.39        
S-001 unidirectional optical detector single channel 4      EACH 753.50 3,014.00 787.75 3,151.00        
S-002 optical cable 605      LNFT 1.75 1,058.75 1.84 1,113.20        
S-003 phase selector 1      EACH 3,696.00 3,696.00 3,864.00 3,864.00        
S-004 video detector device and connection 4      EACH 3,404.50 13,618.00 3,559.25 14,237.00        
S-005 video detection system (barringer @ airline) 1      EACH 1,975.60 1,975.60 2,065.40 2,065.40        
S-006 remove and replace driveway gate 1      EACH 800.00 800.00 575.00 575.00        
                       
 CONTRACTOR TOTAL       241,382.57   376,980.29        