| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - ATWOOD FENCE COMPANY INC. |
- 2 - UNITED RENTALS HWY TECHNOLOGIES INC |
- 3 - ALPHA SERVICE AND PRODUCTS, INC. |
- 4 - JACK B. HARPER CONTRACTOR, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
6,000.00 |
6,000.00 |
12,000.00 |
12,000.00 |
| 202-02-H |
removal of guard rail
|
9,319   |
LNFT |
5.50 |
51,254.50 |
4.00 |
37,276.00 |
3.00 |
27,957.00 |
3.00 |
27,957.00 |
| 202-02-I |
removal of concrete cast-in-place revetment
|
784   |
SQYD |
10.00 |
7,840.00 |
11.00 |
8,624.00 |
12.50 |
9,800.00 |
30.00 |
23,520.00 |
| 203-08 |
borrow (vehicular measurement)
|
3,250   |
CUYD |
18.00 |
58,500.00 |
20.00 |
65,000.00 |
21.50 |
69,875.00 |
16.00 |
52,000.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
3,508.7 |
TON |
85.00 |
298,239.50 |
90.00 |
315,783.00 |
105.00 |
368,413.50 |
175.00 |
614,022.50 |
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
8   |
LNFT |
150.00 |
1,200.00 |
175.00 |
1,400.00 |
185.00 |
1,480.00 |
50.00 |
400.00 |
| 702-04-A |
adjusting manholes
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,100.00 |
1,100.00 |
1,250.00 |
1,250.00 |
850.00 |
850.00 |
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,200.00 |
2,200.00 |
2,200.00 |
2,200.00 |
2,500.00 |
2,500.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
950.0 |
LNFT |
35.00 |
33,250.00 |
32.00 |
30,400.00 |
25.50 |
24,225.00 |
31.00 |
29,450.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
1,431.4 |
LNFT |
40.00 |
57,256.00 |
45.00 |
64,413.00 |
40.50 |
57,971.70 |
45.00 |
64,413.00 |
| 704-03 |
blocked out guard rail
|
5,575.3 |
LNFT |
16.50 |
91,992.45 |
16.00 |
89,204.80 |
16.00 |
89,204.80 |
15.00 |
83,629.50 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
150.0 |
LNFT |
65.00 |
9,750.00 |
65.00 |
9,750.00 |
79.00 |
11,850.00 |
80.00 |
12,000.00 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
325.0 |
LNFT |
35.00 |
11,375.00 |
29.00 |
9,425.00 |
33.00 |
10,725.00 |
45.00 |
14,625.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
425.0 |
LNFT |
40.00 |
17,000.00 |
40.00 |
17,000.00 |
40.00 |
17,000.00 |
50.00 |
21,250.00 |
| 704-11-A |
guard rail end treatment (flared)
|
37   |
EACH |
1,950.00 |
72,150.00 |
1,650.00 |
61,050.00 |
1,750.00 |
64,750.00 |
1,800.00 |
66,600.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,500.00 |
10,000.00 |
1,900.00 |
7,600.00 |
2,200.00 |
8,800.00 |
2,500.00 |
10,000.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,067   |
SQYD |
40.00 |
42,680.00 |
44.00 |
46,948.00 |
50.00 |
53,350.00 |
45.00 |
48,015.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
45,000.00 |
45,000.00 |
35,000.00 |
35,000.00 |
125,000.00 |
125,000.00 |
15,000.00 |
15,000.00 |
| 716-01-A |
mulch (vegetative)
|
1.29 |
ACRE |
1,000.00 |
1,290.00 |
1,100.00 |
1,419.00 |
2,500.00 |
3,225.00 |
1,000.00 |
1,290.00 |
| 717-01 |
seeding
|
58   |
LB |
10.00 |
580.00 |
11.25 |
652.50 |
25.00 |
1,450.00 |
25.00 |
1,450.00 |
| 718-01 |
fertilizer
|
1,290   |
LB |
0.60 |
774.00 |
0.70 |
903.00 |
1.30 |
1,677.00 |
1.00 |
1,290.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
70,000.00 |
70,000.00 |
100,000.00 |
100,000.00 |
25,000.00 |
25,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
67   |
EACH |
65.00 |
4,355.00 |
65.00 |
4,355.00 |
68.00 |
4,556.00 |
100.00 |
6,700.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
20,000.00 |
20,000.00 |
7,500.00 |
7,500.00 |
| S-001 |
pier protection system
|
4   |
EACH |
32,500.00 |
130,000.00 |
35,000.00 |
140,000.00 |
38,000.00 |
152,000.00 |
30,000.00 |
120,000.00 |
| S-002 |
dynamic message signs
|
2   |
EACH |
6,000.00 |
12,000.00 |
8,000.00 |
16,000.00 |
15,000.00 |
30,000.00 |
15,000.00 |
30,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,039,486.45 |
|
1,071,003.30 |
|
1,262,760.00 |
|
1,291,462.00 |
|