Lead Project: 737-95-0025
Parish: OUACHITA, RICHLAND, MADISON
Routes: I-20
Description: DISTRICT 05 GUARD RAIL REPLACEMENT
Type Const: superpave asphaltic concrete pavement, guard rail replacement, and related work.
 
RankLicenseBidderAmount
138764 ATWOOD FENCE COMPANY INC. $1,039,486.45
223811 UNITED RENTALS HWY TECHNOLOGIES INC $1,071,003.30
334068 ALPHA SERVICE AND PRODUCTS, INC. $1,262,760.00
427043 JACK B. HARPER CONTRACTOR, INC. $1,291,462.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
ATWOOD FENCE COMPANY INC.
- 2 -
UNITED RENTALS HWY TECHNOLOGIES INC
- 3 -
ALPHA SERVICE AND PRODUCTS, INC.
- 4 -
JACK B. HARPER CONTRACTOR, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 5,500.00 5,500.00 6,000.00 6,000.00 12,000.00 12,000.00
202-02-H removal of guard rail 9,319      LNFT 5.50 51,254.50 4.00 37,276.00 3.00 27,957.00 3.00 27,957.00
202-02-I removal of concrete cast-in-place revetment 784      SQYD 10.00 7,840.00 11.00 8,624.00 12.50 9,800.00 30.00 23,520.00
203-08 borrow (vehicular measurement) 3,250      CUYD 18.00 58,500.00 20.00 65,000.00 21.50 69,875.00 16.00 52,000.00
502-01-A superpave asphaltic concrete, paved drives and
turnouts
3,508.7    TON 85.00 298,239.50 90.00 315,783.00 105.00 368,413.50 175.00 614,022.50
701-10-G reinforced concrete pipe (extension)(18") 8      LNFT 150.00 1,200.00 175.00 1,400.00 185.00 1,480.00 50.00 400.00
702-04-A adjusting manholes 1      EACH 1,000.00 1,000.00 1,100.00 1,100.00 1,250.00 1,250.00 850.00 850.00
702-04-B adjusting catch basins 1      EACH 2,000.00 2,000.00 2,200.00 2,200.00 2,200.00 2,200.00 2,500.00 2,500.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 950.0    LNFT 35.00 33,250.00 32.00 30,400.00 25.50 24,225.00 31.00 29,450.00
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 1,431.4    LNFT 40.00 57,256.00 45.00 64,413.00 40.50 57,971.70 45.00 64,413.00
704-03 blocked out guard rail 5,575.3    LNFT 16.50 91,992.45 16.00 89,204.80 16.00 89,204.80 15.00 83,629.50
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
150.0    LNFT 65.00 9,750.00 65.00 9,750.00 79.00 11,850.00 80.00 12,000.00
704-07-A guard rail bridge attachments (single thrie beam) 325.0    LNFT 35.00 11,375.00 29.00 9,425.00 33.00 10,725.00 45.00 14,625.00
704-08-B guard rail transitions (double thrie beam) 425.0    LNFT 40.00 17,000.00 40.00 17,000.00 40.00 17,000.00 50.00 21,250.00
704-11-A guard rail end treatment (flared) 37      EACH 1,950.00 72,150.00 1,650.00 61,050.00 1,750.00 64,750.00 1,800.00 66,600.00
704-11-B guard rail end treatment (tangent) 4      EACH 2,500.00 10,000.00 1,900.00 7,600.00 2,200.00 8,800.00 2,500.00 10,000.00
712-01-A concrete cast-in-place revetment (4" thick) 1,067      SQYD 40.00 42,680.00 44.00 46,948.00 50.00 53,350.00 45.00 48,015.00
713-01 temporary signs & barricades lump      LUMP 45,000.00 45,000.00 35,000.00 35,000.00 125,000.00 125,000.00 15,000.00 15,000.00
716-01-A mulch (vegetative) 1.29   ACRE 1,000.00 1,290.00 1,100.00 1,419.00 2,500.00 3,225.00 1,000.00 1,290.00
717-01 seeding 58      LB 10.00 580.00 11.25 652.50 25.00 1,450.00 25.00 1,450.00
718-01 fertilizer 1,290      LB 0.60 774.00 0.70 903.00 1.30 1,677.00 1.00 1,290.00
727-01 mobilization lump      LUMP 50,000.00 50,000.00 70,000.00 70,000.00 100,000.00 100,000.00 25,000.00 25,000.00
729-16-C object marker assembly (type 3) 67      EACH 65.00 4,355.00 65.00 4,355.00 68.00 4,556.00 100.00 6,700.00
740-01 construction layout lump      LUMP 25,000.00 25,000.00 30,000.00 30,000.00 20,000.00 20,000.00 7,500.00 7,500.00
S-001 pier protection system 4      EACH 32,500.00 130,000.00 35,000.00 140,000.00 38,000.00 152,000.00 30,000.00 120,000.00
S-002 dynamic message signs 2      EACH 6,000.00 12,000.00 8,000.00 16,000.00 15,000.00 30,000.00 15,000.00 30,000.00
                       
 CONTRACTOR TOTAL       1,039,486.45   1,071,003.30   1,262,760.00   1,291,462.00