| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - F. MILLER & SONS, LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - GUINN BROTHERS, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
40,000.00 |
40,000.00 |
34,000.00 |
34,000.00 |
25,000.00 |
25,000.00 |
22,000.00 |
22,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 105+00, 18.8' wide x 66.62'
long timber bridge with wingwalls) |
1   |
EACH |
8,000.00 |
8,000.00 |
7,800.00 |
7,800.00 |
3,500.00 |
3,500.00 |
6,500.00 |
6,500.00 |
| 202-02-A-02 |
removal of bridge (sta. 105+00, 15.3' wide x 76.4'
long timber bridge with wingwalls) |
1   |
EACH |
8,000.00 |
8,000.00 |
5,250.00 |
5,250.00 |
7,000.00 |
7,000.00 |
7,000.00 |
7,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
90.8 |
SQYD |
20.00 |
1,816.00 |
6.00 |
544.80 |
16.00 |
1,452.80 |
10.00 |
908.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
| 204-02 |
temporary hay or straw bales
|
230   |
EACH |
5.00 |
1,150.00 |
7.00 |
1,610.00 |
20.00 |
4,600.00 |
10.00 |
2,300.00 |
| 204-03 |
temporary slope drains
|
155   |
LNFT |
20.00 |
3,100.00 |
13.00 |
2,015.00 |
5.00 |
775.00 |
10.00 |
1,550.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
250.00 |
2,000.00 |
81.00 |
648.00 |
150.00 |
1,200.00 |
100.00 |
800.00 |
| 204-06 |
temporary silt fencing
|
675   |
LNFT |
2.50 |
1,687.50 |
2.00 |
1,350.00 |
2.00 |
1,350.00 |
2.00 |
1,350.00 |
| 302-01 |
class ii base course
|
227.9 |
CUYD |
75.00 |
17,092.50 |
43.00 |
9,799.70 |
75.00 |
17,092.50 |
85.00 |
19,371.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
21   |
CUYD |
75.00 |
1,575.00 |
64.00 |
1,344.00 |
65.00 |
1,365.00 |
100.00 |
2,100.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
47.7 |
CUYD |
75.00 |
3,577.50 |
64.00 |
3,052.80 |
60.00 |
2,862.00 |
90.00 |
4,293.00 |
| 502-01 |
superpave asphaltic concrete
|
185.4 |
TON |
180.00 |
33,372.00 |
210.00 |
38,934.00 |
125.00 |
23,175.00 |
140.00 |
25,956.00 |
| 701-01-W/Y |
cross drain pipe (96" rcp/pcp or 108" cmp)
|
256   |
LNFT |
400.00 |
102,400.00 |
276.00 |
70,656.00 |
360.00 |
92,160.00 |
345.00 |
88,320.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
45.00 |
3,375.00 |
45.00 |
3,375.00 |
50.00 |
3,750.00 |
50.00 |
3,750.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
75.0 |
LNFT |
25.00 |
1,875.00 |
25.00 |
1,875.00 |
27.00 |
2,025.00 |
30.00 |
2,250.00 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
1,950.00 |
1,950.00 |
4,000.00 |
4,000.00 |
2,100.00 |
2,100.00 |
2,500.00 |
2,500.00 |
| 705-01 |
barbed wire fence
|
310   |
LNFT |
6.00 |
1,860.00 |
8.00 |
2,480.00 |
9.00 |
2,790.00 |
5.00 |
1,550.00 |
| 705-05 |
double swinging driveway gates
|
1   |
DBGT |
600.00 |
600.00 |
2,400.00 |
2,400.00 |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
1,373   |
SQYD |
36.00 |
49,428.00 |
43.00 |
59,039.00 |
45.00 |
61,785.00 |
50.00 |
68,650.00 |
| 711-04 |
geotextile fabric
|
1,373   |
SQYD |
2.50 |
3,432.50 |
2.50 |
3,432.50 |
3.00 |
4,119.00 |
5.00 |
6,865.00 |
| 712-02 |
sacked concrete revetment
|
107   |
SQYD |
100.00 |
10,700.00 |
66.00 |
7,062.00 |
75.00 |
8,025.00 |
100.00 |
10,700.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
19,500.00 |
19,500.00 |
19,400.00 |
19,400.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 726-01 |
bedding material
|
416.9 |
CUYD |
60.00 |
25,014.00 |
74.00 |
30,850.60 |
65.00 |
27,098.50 |
85.00 |
35,436.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
52.00 |
208.00 |
50.00 |
200.00 |
60.00 |
240.00 |
70.00 |
280.00 |
| 729-16-C |
object marker assembly (type 3)
|
7   |
EACH |
75.00 |
525.00 |
70.00 |
490.00 |
80.00 |
560.00 |
90.00 |
630.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
9,300.00 |
9,300.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,760   |
LNFT |
33.00 |
58,080.00 |
32.00 |
56,320.00 |
35.00 |
61,600.00 |
35.00 |
61,600.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
100.00 |
100.00 |
100.00 |
100.00 |
1.00 |
1.00 |
| 805-10-A |
bridge superstructure & substructure (28' clr. rdwy;
45 deg. crossing, cast -in-place) |
7   |
SPAN |
21,500.00 |
150,500.00 |
20,500.00 |
143,500.00 |
23,800.00 |
166,600.00 |
23,500.00 |
164,500.00 |
| S-101 |
concrete approach slabs (28'clr. rdwy; 45 deg.
crossing, cast-in-place; without asphalt) |
2   |
EACH |
7,500.00 |
15,000.00 |
6,700.00 |
13,400.00 |
7,500.00 |
15,000.00 |
8,500.00 |
17,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
633,319.00 |
|
644,228.40 |
|
670,524.80 |
|
694,661.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 105+00, 18.8' wide x 66.62'
long timber bridge with wingwalls) |
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 105+00, 15.3' wide x 76.4'
long timber bridge with wingwalls) |
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
90.8 |
SQYD |
7.00 |
635.60 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
230   |
EACH |
7.50 |
1,725.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
155   |
LNFT |
4.00 |
620.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
85.00 |
680.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
675   |
LNFT |
2.00 |
1,350.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
227.9 |
CUYD |
50.00 |
11,395.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
21   |
CUYD |
65.00 |
1,365.00 |
|
|
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
47.7 |
CUYD |
61.00 |
2,909.70 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
185.4 |
TON |
205.00 |
38,007.00 |
|
|
|
|
|
|
| 701-01-W/Y |
cross drain pipe (96" rcp/pcp or 108" cmp)
|
256   |
LNFT |
305.00 |
78,080.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
47.00 |
3,525.00 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
75.0 |
LNFT |
26.00 |
1,950.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
310   |
LNFT |
8.00 |
2,480.00 |
|
|
|
|
|
|
| 705-05 |
double swinging driveway gates
|
1   |
DBGT |
787.00 |
787.00 |
|
|
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
1,373   |
SQYD |
31.00 |
42,563.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,373   |
SQYD |
1.70 |
2,334.10 |
|
|
|
|
|
|
| 712-02 |
sacked concrete revetment
|
107   |
SQYD |
78.00 |
8,346.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
17,000.00 |
17,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
416.9 |
CUYD |
47.00 |
19,594.30 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
57,000.00 |
57,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
54.00 |
216.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
7   |
EACH |
73.00 |
511.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
48,000.00 |
48,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,760   |
LNFT |
32.00 |
56,320.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (28' clr. rdwy;
45 deg. crossing, cast -in-place) |
7   |
SPAN |
33,200.00 |
232,400.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs (28'clr. rdwy; 45 deg.
crossing, cast-in-place; without asphalt) |
2   |
EACH |
7,000.00 |
14,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
726,293.70 |
|
|
|
|
|
|
|