Letting of 10/27/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-09-0001
Parish: CADDO
Routes:
Description: OFF-SYSTEM BRIDGES IN CADDO PARISH
Type Const: removal of bridges, drainage strs., reinforced conc. box culverts, class ii base
course, superpave asph. pavement, temp. detour road/bridge, cast-in-place bridge
 
RankLicenseBidderAmount
118546 C,W & W CONTRACTORS, INC. $1,059,537.90
228218 F. J. BURNELL, INC. $1,113,753.85
309090 GUINN BROTHERS, LLC. $1,169,694.62
12135 BLOUNT BROS. CONSTRUCTION, INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
C,W & W CONTRACTORS, INC.
- 2 -
F. J. BURNELL, INC.
- 3 -
GUINN BROTHERS, LLC.

BLOUNT BROS. CONSTRUCTION, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 28,000.00 28,000.00 30,000.00 30,000.00 30,500.00 30,500.00 60,000.00 60,000.00
202-02-A-01 removal of bridge (sta. 0+150.0 17.983 l x 5.852 w,
3-span steel girder bridge)
1      ea 10,000.00 10,000.00 4,000.00 4,000.00 30,000.00 30,000.00 35,000.00 35,000.00
202-02-A-02 removal of bridge (sta. 0+166.0 29.261 l x 7.102 w,
4-span steel girder wood deck)
1      ea 10,000.00 10,000.00 5,000.00 5,000.00 8,000.00 8,000.00 37,500.00 37,500.00
202-02-A-03 removal of bridge (sta. 0+150.0 7.925 l x 8.047 w,
single span steel girder)
1      ea 6,000.00 6,000.00 3,000.00 3,000.00 6,000.00 6,000.00 32,500.00 32,500.00
202-02-A-04 removal of bridge (sta. 0+150.0 7.927 l x
8.049 w,single span steel girder)
1      ea 6,000.00 6,000.00 4,000.00 4,000.00 6,000.00 6,000.00 32,500.00 32,500.00
202-02-A-05 removal of bridge (sta. 0+150.0 17.418 l x
6.424 w,3-span steel girder)
1      ea 10,000.00 10,000.00 4,000.00 4,000.00 10,000.00 10,000.00 35,000.00 35,000.00
203-06 excavation & embankment lump      lump 35,000.00 35,000.00 20,000.00 20,000.00 40,000.00 40,000.00 131,000.00 131,000.00
204-02 temporary hay or straw bales 108      ea 10.00 1,080.00 10.00 1,080.00 10.00 1,080.00 10.00 1,080.00
204-03 temporary slope drains 20      ln m 35.00 700.00 60.00 1,200.00 10.00 200.00 82.50 1,650.00
204-05-A temporary sediment check dams (hay) 32      ea 125.00 4,000.00 80.00 2,560.00 100.00 3,200.00 72.00 2,304.00
204-06 temporary silt fencing 2,580      ln m 1.00 2,580.00 5.25 13,545.00 1.75 4,515.00 9.85 25,413.00
302-01 class ii base course 382.4    cu m 90.00 34,416.00 60.00 22,944.00 85.00 32,504.00 78.50 30,018.40
401-02 aggregate surface course (adjusted vehicular
measurement)
43      cu m 70.00 3,010.00 70.00 3,010.00 85.00 3,655.00 130.00 5,590.00
403-01 aggregate roadway surfacing (vehicular measurement) 19.6    cu m 85.00 1,666.00 80.00 1,568.00 85.00 1,666.00 130.00 2,548.00
502-01 superpave asphaltic concrete 368.8    Mg 125.00 46,100.00 165.00 60,852.00 150.00 55,320.00 200.00 73,760.00
701-01-P/Q cross drain pipe (1350 mm rcp or 1500 mm cmp) 78.0    ln m 500.00 39,000.00 425.00 33,150.00 615.00 47,970.00 525.00 40,950.00
701-01-Q cross drain pipe (1500 mm rcp) 88.0    ln m 700.00 61,600.00 465.00 40,920.00 760.00 66,880.00 820.00 72,160.00
704-01-A guard rail (single thrie beam)(950 mm post spacing) 89.46   ln m 185.00 16,550.10 162.00 14,492.52 152.00 13,597.92 230.00 20,575.80
704-08-B guard rail transitions (double thrie beam) 22.86   ln m 165.00 3,771.90 145.00 3,314.70 140.00 3,200.40 312.00 7,132.32
704-09 guard rail anchor sections (turndown) 53.34   ln m 85.00 4,533.90 77.00 4,107.18 75.00 4,000.50 400.00 21,336.00
704-11-A guard rail end treatment (flared) 4      ea 2,250.00 9,000.00 2,000.00 8,000.00 2,000.00 8,000.00 2,500.00 10,000.00
705-01 barbed wire fence 295      ln m 20.00 5,900.00 16.50 4,867.50 15.00 4,425.00 26.25 7,743.75
705-02 combination mesh & barbed wire fence 5      ln m 50.00 250.00 100.00 500.00 200.00 1,000.00 48.00 240.00
706-02-A concrete drive (100 mm thick) 60.0    sq m 50.00 3,000.00 53.00 3,180.00 50.00 3,000.00 48.00 2,880.00
711-01-D riprap (25 kg, 460 mm thick) 293      sq m 60.00 17,580.00 36.00 10,548.00 50.00 14,650.00 48.00 14,064.00
711-04 geotextile fabric 293      sq m 3.00 879.00 2.75 805.75 5.00 1,465.00 1.80 527.40
713-01 temporary signs & barricades lump      lump 25,000.00 25,000.00 18,000.00 18,000.00 36,000.00 36,000.00 60,000.00 60,000.00
713-03-A temporary pavement markings (100mm width) 31      ln m 13.00 403.00 10.00 310.00 15.00 465.00 13.00 403.00
713-05-A-01 temporary pavement markings (solid line)(100 mm width)
(type 1 removable)
0.062  km 24,000.00 1,488.00 20,000.00 1,240.00 30,000.00 1,860.00 13,625.00 844.75
720-01-A erosion control system, slope protection (type a) 20      sq m 2.00 40.00 5.00 100.00 20.00 400.00 9.60 192.00
725-01 temporary detour roads 194.4    ln m 600.00 116,640.00 1,050.00 204,120.00 582.00 113,140.80 426.00 82,814.40
725-03-A temporary detour bridging(4-6m x 7.3m) (90 degree
crossing)
24.00   ln m 3,500.00 84,000.00 5,500.00 132,000.00 3,500.00 84,000.00 4,150.00 99,600.00
726-01 bedding material 237.3    cu m 70.00 16,611.00 46.00 10,915.80 80.00 18,984.00 80.00 18,984.00
727-01 mobilization lump      lump 45,000.00 45,000.00 70,000.00 70,000.00 100,000.00 100,000.00 100,000.00 100,000.00
729-16-B object marker assembly (type 2) 12      ea 65.00 780.00 55.00 660.00 65.00 780.00 100.00 1,200.00
729-16-C object marker assembly (type 3) 15      ea 80.00 1,200.00 72.00 1,080.00 75.00 1,125.00 125.00 1,875.00
737-03-A painted traffic striping (solid line)(100 mm width) 353      ln m 25.00 8,825.00 6.00 2,118.00 28.00 9,884.00 11.50 4,059.50
740-01 construction layout lump      lump 15,000.00 15,000.00 7,000.00 7,000.00 25,000.00 25,000.00 60,000.00 60,000.00
804-01-B precast concrete piles (350 mm) 261.0    ln m 165.00 43,065.00 155.00 40,455.00 110.00 28,710.00 213.00 55,593.00
804-12 loading permanent piles 1      ea 500.00 500.00 250.00 250.00 1.00 1.00 20,000.00 20,000.00
805-01-B class a concrete (box culvert headwalls) 42.40   cu m 1,200.00 50,880.00 720.00 30,528.00 1,000.00 42,400.00 975.00 41,340.00
805-10-A bridge superstructure & substructure (7.3m clr rdwy;
60 degree crossing, (cip))
5      span 20,000.00 100,000.00 26,000.00 130,000.00 20,000.00 100,000.00 30,000.00 150,000.00
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 78.00   ln m 1,200.00 93,600.00 1,000.00 78,000.00 1,200.00 93,600.00 1,312.00 102,336.00
805-12-M-01 reinforced concrete box culverts (1800 mm x 1800 mm)
(precast only, astm c-1443)
54.90   ln m 1,400.00 76,860.00 1,350.00 74,115.00 1,700.00 93,330.00 1,640.00 90,036.00
806-01 deformed reinforcing steel 2,343      kg 3.00 7,029.00 1.80 4,217.40 2.00 4,686.00 3.30 7,731.90
S-101 concrete approach slabs (7.3m clr rdwy, 60 degree
crossing, c.i.p.)
1      ea 6,000.00 6,000.00 4,000.00 4,000.00 7,000.00 7,000.00 4,100.00 4,100.00
S-102 concrete approach slabs (7.3m clr rdwy, 60 degree
crossing,tapered barrier rail)
1      ea 6,000.00 6,000.00 4,000.00 4,000.00 7,500.00 7,500.00 5,710.00 5,710.00
                       
 CONTRACTOR TOTAL       1,059,537.90   1,113,753.85   1,169,694.62   IRREGULAR