| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C,W & W CONTRACTORS, INC. |
- 2 - F. J. BURNELL, INC. |
- 3 - GUINN BROTHERS, LLC. |
BLOUNT BROS. CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
28,000.00 |
28,000.00 |
30,000.00 |
30,000.00 |
30,500.00 |
30,500.00 |
60,000.00 |
60,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 0+150.0 17.983 l x 5.852 w,
3-span steel girder bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 0+166.0 29.261 l x 7.102 w,
4-span steel girder wood deck) |
1   |
ea |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
37,500.00 |
37,500.00 |
| 202-02-A-03 |
removal of bridge (sta. 0+150.0 7.925 l x 8.047 w,
single span steel girder) |
1   |
ea |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
6,000.00 |
6,000.00 |
32,500.00 |
32,500.00 |
| 202-02-A-04 |
removal of bridge (sta. 0+150.0 7.927 l x
8.049 w,single span steel girder) |
1   |
ea |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
32,500.00 |
32,500.00 |
| 202-02-A-05 |
removal of bridge (sta. 0+150.0 17.418 l x
6.424 w,3-span steel girder) |
1   |
ea |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
35,000.00 |
35,000.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
131,000.00 |
131,000.00 |
| 204-02 |
temporary hay or straw bales
|
108   |
ea |
10.00 |
1,080.00 |
10.00 |
1,080.00 |
10.00 |
1,080.00 |
10.00 |
1,080.00 |
| 204-03 |
temporary slope drains
|
20   |
ln m |
35.00 |
700.00 |
60.00 |
1,200.00 |
10.00 |
200.00 |
82.50 |
1,650.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
32   |
ea |
125.00 |
4,000.00 |
80.00 |
2,560.00 |
100.00 |
3,200.00 |
72.00 |
2,304.00 |
| 204-06 |
temporary silt fencing
|
2,580   |
ln m |
1.00 |
2,580.00 |
5.25 |
13,545.00 |
1.75 |
4,515.00 |
9.85 |
25,413.00 |
| 302-01 |
class ii base course
|
382.4 |
cu m |
90.00 |
34,416.00 |
60.00 |
22,944.00 |
85.00 |
32,504.00 |
78.50 |
30,018.40 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
43   |
cu m |
70.00 |
3,010.00 |
70.00 |
3,010.00 |
85.00 |
3,655.00 |
130.00 |
5,590.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
19.6 |
cu m |
85.00 |
1,666.00 |
80.00 |
1,568.00 |
85.00 |
1,666.00 |
130.00 |
2,548.00 |
| 502-01 |
superpave asphaltic concrete
|
368.8 |
Mg |
125.00 |
46,100.00 |
165.00 |
60,852.00 |
150.00 |
55,320.00 |
200.00 |
73,760.00 |
| 701-01-P/Q |
cross drain pipe (1350 mm rcp or 1500 mm cmp)
|
78.0 |
ln m |
500.00 |
39,000.00 |
425.00 |
33,150.00 |
615.00 |
47,970.00 |
525.00 |
40,950.00 |
| 701-01-Q |
cross drain pipe (1500 mm rcp)
|
88.0 |
ln m |
700.00 |
61,600.00 |
465.00 |
40,920.00 |
760.00 |
66,880.00 |
820.00 |
72,160.00 |
| 704-01-A |
guard rail (single thrie beam)(950 mm post spacing)
|
89.46 |
ln m |
185.00 |
16,550.10 |
162.00 |
14,492.52 |
152.00 |
13,597.92 |
230.00 |
20,575.80 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
22.86 |
ln m |
165.00 |
3,771.90 |
145.00 |
3,314.70 |
140.00 |
3,200.40 |
312.00 |
7,132.32 |
| 704-09 |
guard rail anchor sections (turndown)
|
53.34 |
ln m |
85.00 |
4,533.90 |
77.00 |
4,107.18 |
75.00 |
4,000.50 |
400.00 |
21,336.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,250.00 |
9,000.00 |
2,000.00 |
8,000.00 |
2,000.00 |
8,000.00 |
2,500.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
295   |
ln m |
20.00 |
5,900.00 |
16.50 |
4,867.50 |
15.00 |
4,425.00 |
26.25 |
7,743.75 |
| 705-02 |
combination mesh & barbed wire fence
|
5   |
ln m |
50.00 |
250.00 |
100.00 |
500.00 |
200.00 |
1,000.00 |
48.00 |
240.00 |
| 706-02-A |
concrete drive (100 mm thick)
|
60.0 |
sq m |
50.00 |
3,000.00 |
53.00 |
3,180.00 |
50.00 |
3,000.00 |
48.00 |
2,880.00 |
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
293   |
sq m |
60.00 |
17,580.00 |
36.00 |
10,548.00 |
50.00 |
14,650.00 |
48.00 |
14,064.00 |
| 711-04 |
geotextile fabric
|
293   |
sq m |
3.00 |
879.00 |
2.75 |
805.75 |
5.00 |
1,465.00 |
1.80 |
527.40 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
36,000.00 |
36,000.00 |
60,000.00 |
60,000.00 |
| 713-03-A |
temporary pavement markings (100mm width)
|
31   |
ln m |
13.00 |
403.00 |
10.00 |
310.00 |
15.00 |
465.00 |
13.00 |
403.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
0.062 |
km |
24,000.00 |
1,488.00 |
20,000.00 |
1,240.00 |
30,000.00 |
1,860.00 |
13,625.00 |
844.75 |
| 720-01-A |
erosion control system, slope protection (type a)
|
20   |
sq m |
2.00 |
40.00 |
5.00 |
100.00 |
20.00 |
400.00 |
9.60 |
192.00 |
| 725-01 |
temporary detour roads
|
194.4 |
ln m |
600.00 |
116,640.00 |
1,050.00 |
204,120.00 |
582.00 |
113,140.80 |
426.00 |
82,814.40 |
| 725-03-A |
temporary detour bridging(4-6m x 7.3m) (90 degree
crossing) |
24.00 |
ln m |
3,500.00 |
84,000.00 |
5,500.00 |
132,000.00 |
3,500.00 |
84,000.00 |
4,150.00 |
99,600.00 |
| 726-01 |
bedding material
|
237.3 |
cu m |
70.00 |
16,611.00 |
46.00 |
10,915.80 |
80.00 |
18,984.00 |
80.00 |
18,984.00 |
| 727-01 |
mobilization
|
lump |
lump |
45,000.00 |
45,000.00 |
70,000.00 |
70,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
100,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
12   |
ea |
65.00 |
780.00 |
55.00 |
660.00 |
65.00 |
780.00 |
100.00 |
1,200.00 |
| 729-16-C |
object marker assembly (type 3)
|
15   |
ea |
80.00 |
1,200.00 |
72.00 |
1,080.00 |
75.00 |
1,125.00 |
125.00 |
1,875.00 |
| 737-03-A |
painted traffic striping (solid line)(100 mm width)
|
353   |
ln m |
25.00 |
8,825.00 |
6.00 |
2,118.00 |
28.00 |
9,884.00 |
11.50 |
4,059.50 |
| 740-01 |
construction layout
|
lump |
lump |
15,000.00 |
15,000.00 |
7,000.00 |
7,000.00 |
25,000.00 |
25,000.00 |
60,000.00 |
60,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
261.0 |
ln m |
165.00 |
43,065.00 |
155.00 |
40,455.00 |
110.00 |
28,710.00 |
213.00 |
55,593.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
500.00 |
500.00 |
250.00 |
250.00 |
1.00 |
1.00 |
20,000.00 |
20,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
42.40 |
cu m |
1,200.00 |
50,880.00 |
720.00 |
30,528.00 |
1,000.00 |
42,400.00 |
975.00 |
41,340.00 |
| 805-10-A |
bridge superstructure & substructure (7.3m clr rdwy;
60 degree crossing, (cip)) |
5   |
span |
20,000.00 |
100,000.00 |
26,000.00 |
130,000.00 |
20,000.00 |
100,000.00 |
30,000.00 |
150,000.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
78.00 |
ln m |
1,200.00 |
93,600.00 |
1,000.00 |
78,000.00 |
1,200.00 |
93,600.00 |
1,312.00 |
102,336.00 |
| 805-12-M-01 |
reinforced concrete box culverts (1800 mm x 1800 mm)
(precast only, astm c-1443) |
54.90 |
ln m |
1,400.00 |
76,860.00 |
1,350.00 |
74,115.00 |
1,700.00 |
93,330.00 |
1,640.00 |
90,036.00 |
| 806-01 |
deformed reinforcing steel
|
2,343   |
kg |
3.00 |
7,029.00 |
1.80 |
4,217.40 |
2.00 |
4,686.00 |
3.30 |
7,731.90 |
| S-101 |
concrete approach slabs (7.3m clr rdwy, 60 degree
crossing, c.i.p.) |
1   |
ea |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
7,000.00 |
7,000.00 |
4,100.00 |
4,100.00 |
| S-102 |
concrete approach slabs (7.3m clr rdwy, 60 degree
crossing,tapered barrier rail) |
1   |
ea |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
7,500.00 |
7,500.00 |
5,710.00 |
5,710.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,059,537.90 |
|
1,113,753.85 |
|
1,169,694.62 |
|
IRREGULAR |
|