| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GUINN BROTHERS, LLC. |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - F. MILLER & SONS, LLC |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
11,500.00 |
11,500.00 |
35,000.00 |
35,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 112+18.09: 19.6'w x 39'l
precast concrete deck w/ t imber piles & caps) |
1   |
EACH |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
7,000.00 |
7,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 107+53.26: 19.3'w x 57'l
precast concrete deck w/ t imber piles & caps) |
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
9,600.00 |
9,600.00 |
7,000.00 |
7,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,991.1 |
SQYD |
3.00 |
5,973.30 |
5.00 |
9,955.50 |
6.00 |
11,946.60 |
5.00 |
9,955.50 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
60,000.00 |
60,000.00 |
| 204-02 |
temporary hay or straw bales
|
34   |
EACH |
10.00 |
340.00 |
10.00 |
340.00 |
9.00 |
306.00 |
18.00 |
612.00 |
| 204-03 |
temporary slope drains
|
120   |
LNFT |
10.00 |
1,200.00 |
20.00 |
2,400.00 |
17.00 |
2,040.00 |
18.00 |
2,160.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
24   |
EACH |
100.00 |
2,400.00 |
250.00 |
6,000.00 |
102.00 |
2,448.00 |
125.00 |
3,000.00 |
| 204-06 |
temporary silt fencing
|
2,830   |
LNFT |
1.75 |
4,952.50 |
2.00 |
5,660.00 |
1.65 |
4,669.50 |
1.25 |
3,537.50 |
| 302-01 |
class ii base course
|
878.6 |
CUYD |
80.00 |
70,288.00 |
85.00 |
74,681.00 |
75.00 |
65,895.00 |
65.00 |
57,109.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
193   |
CUYD |
85.00 |
16,405.00 |
35.00 |
6,755.00 |
50.00 |
9,650.00 |
60.00 |
11,580.00 |
| 502-01 |
superpave asphaltic concrete
|
790.0 |
TON |
130.00 |
102,700.00 |
135.00 |
106,650.00 |
140.00 |
110,600.00 |
150.00 |
118,500.00 |
| 701-05-G |
side drain pipe (18")
|
72   |
LNFT |
45.00 |
3,240.00 |
35.00 |
2,520.00 |
30.00 |
2,160.00 |
40.00 |
2,880.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
45.00 |
4,500.00 |
45.00 |
4,500.00 |
52.00 |
5,200.00 |
50.00 |
5,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
25.00 |
2,500.00 |
25.00 |
2,500.00 |
28.00 |
2,800.00 |
28.00 |
2,800.00 |
| 705-01 |
barbed wire fence
|
935   |
LNFT |
5.00 |
4,675.00 |
6.00 |
5,610.00 |
7.00 |
6,545.00 |
7.00 |
6,545.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
400   |
SQYD |
45.00 |
18,000.00 |
43.00 |
17,200.00 |
45.00 |
18,000.00 |
45.00 |
18,000.00 |
| 711-04 |
geotextile fabric
|
400   |
SQYD |
5.00 |
2,000.00 |
2.50 |
1,000.00 |
3.50 |
1,400.00 |
3.25 |
1,300.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
19,000.00 |
19,000.00 |
14,750.00 |
14,750.00 |
16,000.00 |
16,000.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
50   |
SQYD |
10.00 |
500.00 |
5.00 |
250.00 |
1.30 |
65.00 |
12.00 |
600.00 |
| 726-01 |
bedding material
|
120.0 |
CUYD |
80.00 |
9,600.00 |
60.00 |
7,200.00 |
45.00 |
5,400.00 |
50.00 |
6,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
28,000.00 |
28,000.00 |
15,000.00 |
15,000.00 |
77,000.00 |
77,000.00 |
70,000.00 |
70,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
60.00 |
240.00 |
60.00 |
240.00 |
68.00 |
272.00 |
70.00 |
280.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
68.00 |
544.00 |
68.00 |
544.00 |
77.00 |
616.00 |
80.00 |
640.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
8,000.00 |
8,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,305   |
LNFT |
35.00 |
45,675.00 |
38.00 |
49,590.00 |
35.00 |
45,675.00 |
30.00 |
39,150.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
26.64 |
CUYD |
900.00 |
23,976.00 |
1,100.00 |
29,304.00 |
600.00 |
15,984.00 |
700.00 |
18,648.00 |
| 805-10-A |
bridge superstructure & substructure (90 deg.: 24'
clr. rdwy)(precast only) |
4   |
SPAN |
17,000.00 |
68,000.00 |
21,000.00 |
84,000.00 |
15,200.00 |
60,800.00 |
22,500.00 |
90,000.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
228.0 |
LNFT |
380.00 |
86,640.00 |
450.00 |
102,600.00 |
350.00 |
79,800.00 |
400.00 |
91,200.00 |
| 806-01 |
deformed reinforcing steel
|
2,528   |
LB |
1.40 |
3,539.20 |
3.00 |
7,584.00 |
0.66 |
1,668.48 |
1.50 |
3,792.00 |
| S-101 |
concrete approach slabs (90 deg. xing; 24' clr. rdwy)
(w/out asphalt) |
2   |
EACH |
6,000.00 |
12,000.00 |
7,500.00 |
15,000.00 |
4,250.00 |
8,500.00 |
8,000.00 |
16,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
599,889.00 |
|
663,584.50 |
|
667,790.58 |
|
712,389.00 |
|