| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GULF SOUTH PILING & CONST., INC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - SHAVERS-WHITTLE CONSTRUCTION INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
75,000.00 |
75,000.00 |
8,000.00 |
8,000.00 |
75,000.00 |
75,000.00 |
80,000.00 |
80,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
435   |
SQYD |
10.50 |
4,567.50 |
8.00 |
3,480.00 |
7.00 |
3,045.00 |
15.00 |
6,525.00 |
| 202-02-E |
removal of concrete curbs
|
385.0 |
LNFT |
21.00 |
8,085.00 |
3.00 |
1,155.00 |
5.00 |
1,925.00 |
6.50 |
2,502.50 |
| 202-02-F |
removal of concrete combination curb & gutter
|
3,280.0 |
LNFT |
3.15 |
10,332.00 |
3.00 |
9,840.00 |
6.00 |
19,680.00 |
11.50 |
37,720.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,401.3 |
SQYD |
8.40 |
11,770.92 |
6.00 |
8,407.80 |
13.00 |
18,216.90 |
16.00 |
22,420.80 |
| 202-02-I-A |
removal of curtain wall(ramp ld)
|
1   |
EACH |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
| 202-02-I-B |
removal of curtain wall(ramp lca)
|
1   |
EACH |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
45,000.00 |
45,000.00 |
| 202-02-J |
removal of p. c. c. incidental pavement
|
2,926   |
SQYD |
10.50 |
30,723.00 |
6.00 |
17,556.00 |
10.00 |
29,260.00 |
11.50 |
33,649.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
75,000.00 |
75,000.00 |
60,000.00 |
60,000.00 |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
| 302-02-E |
class ii base course (11 3/4" thick)
|
977.0 |
SQYD |
24.15 |
23,594.55 |
22.00 |
21,494.00 |
30.00 |
29,310.00 |
38.00 |
37,126.00 |
| 302-02-F |
class ii base course (8" thick)
|
3,590.0 |
SQYD |
13.65 |
49,003.50 |
14.00 |
50,260.00 |
20.00 |
71,800.00 |
20.00 |
71,800.00 |
| 305-01 |
subgrade layer (6" thick)
|
82   |
SQYD |
10.50 |
861.00 |
16.00 |
1,312.00 |
12.00 |
984.00 |
30.00 |
2,460.00 |
| 502-01 |
superpave asphaltic concrete
|
4,649.8 |
TON |
95.00 |
441,731.00 |
65.00 |
302,237.00 |
93.00 |
432,431.40 |
100.00 |
464,980.00 |
| 509-01 |
cold planing asphaltic pavement
|
16,322   |
SQYD |
2.10 |
34,276.20 |
3.00 |
48,966.00 |
2.00 |
32,644.00 |
2.50 |
40,805.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 680   |
CUYD |
10.00 |
- 6,800.00 |
5.00 |
- 3,400.00 |
10.00 |
- 6,800.00 |
10.00 |
- 6,800.00 |
| 601-01-I |
portland cement concrete pavement (9" thick)
|
282.0 |
SQYD |
85.00 |
23,970.00 |
70.00 |
19,740.00 |
50.00 |
14,100.00 |
120.00 |
33,840.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
385   |
LNFT |
94.50 |
36,382.50 |
80.00 |
30,800.00 |
100.00 |
38,500.00 |
85.00 |
32,725.00 |
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
3,675.00 |
7,350.00 |
6,000.00 |
12,000.00 |
3,000.00 |
6,000.00 |
4,800.00 |
9,600.00 |
| 702-03-C |
catch basins (cb-06)
|
1   |
EACH |
3,675.00 |
3,675.00 |
6,500.00 |
6,500.00 |
3,200.00 |
3,200.00 |
3,200.00 |
3,200.00 |
| 702-03-G |
catch basins (cb-09)
|
6   |
EACH |
3,675.00 |
22,050.00 |
6,500.00 |
39,000.00 |
3,300.00 |
19,800.00 |
3,000.00 |
18,000.00 |
| 702-03-I |
catch basins (special inlet 22)
|
4   |
EACH |
3,675.00 |
14,700.00 |
6,500.00 |
26,000.00 |
4,000.00 |
16,000.00 |
3,400.00 |
13,600.00 |
| 702-04-A |
adjusting manholes
|
13   |
EACH |
525.00 |
6,825.00 |
500.00 |
6,500.00 |
800.00 |
10,400.00 |
950.00 |
12,350.00 |
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
525.00 |
1,050.00 |
600.00 |
1,200.00 |
800.00 |
1,600.00 |
1,300.00 |
2,600.00 |
| 705-06-D |
chain link fence (7' height)
|
21   |
LNFT |
100.00 |
2,100.00 |
100.00 |
2,100.00 |
100.00 |
2,100.00 |
26.00 |
546.00 |
| 705-07-D |
7 foot single gate for chain link fence (7 foot height)
|
1   |
EACH |
800.00 |
800.00 |
850.00 |
850.00 |
800.00 |
800.00 |
600.00 |
600.00 |
| 706-01-A |
concrete walk (4" thick)
|
94.8 |
SQYD |
52.50 |
4,977.00 |
55.00 |
5,214.00 |
35.00 |
3,318.00 |
56.00 |
5,308.80 |
| 706-02-D |
concrete drive (9 " thick)
|
82.0 |
SQYD |
68.25 |
5,596.50 |
75.00 |
6,150.00 |
48.00 |
3,936.00 |
125.00 |
10,250.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
1,514.1 |
SQYD |
15.75 |
23,847.07 |
45.00 |
68,134.50 |
32.00 |
48,451.20 |
50.00 |
75,705.00 |
| 707-01-A |
concrete curb
|
332.0 |
LNFT |
7.35 |
2,440.20 |
12.00 |
3,984.00 |
8.00 |
2,656.00 |
17.50 |
5,810.00 |
| 707-01-B |
concrete curb (planting beds)
|
112.3 |
LNFT |
7.35 |
825.40 |
30.00 |
3,369.00 |
25.00 |
2,807.50 |
15.00 |
1,684.50 |
| 707-03 |
combination concrete curb & gutter
|
3,268.5 |
LNFT |
21.00 |
68,638.50 |
21.00 |
68,638.50 |
20.00 |
65,370.00 |
24.50 |
80,078.25 |
| 708-01 |
right-of-way monument
|
3   |
EACH |
135.00 |
405.00 |
100.00 |
300.00 |
500.00 |
1,500.00 |
150.00 |
450.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
150,000.00 |
150,000.00 |
110,000.00 |
110,000.00 |
200,000.00 |
200,000.00 |
75,000.00 |
75,000.00 |
| 713-03-A |
temporary pavement markings (4" width)
|
26,694   |
LNFT |
0.23 |
6,139.62 |
0.25 |
6,673.50 |
0.25 |
6,673.50 |
0.25 |
6,673.50 |
| 713-03-C |
temporary pavement markings (8" width)
|
2,950   |
LNFT |
0.46 |
1,357.00 |
0.50 |
1,475.00 |
0.50 |
1,475.00 |
0.50 |
1,475.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
1,095   |
LNFT |
1.39 |
1,522.05 |
1.40 |
1,533.00 |
1.50 |
1,642.50 |
1.50 |
1,642.50 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.833 |
MILE |
380.00 |
1,076.54 |
400.00 |
1,133.20 |
3,000.00 |
8,499.00 |
1,200.00 |
3,399.60 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.833 |
MILE |
380.00 |
1,076.54 |
400.00 |
1,133.20 |
360.00 |
1,019.88 |
450.00 |
1,274.85 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
153   |
EACH |
175.00 |
26,775.00 |
325.00 |
49,725.00 |
100.00 |
15,300.00 |
165.00 |
25,245.00 |
| 714-01-A |
slab sodding(bermuda)
|
1,350   |
SQYD |
4.20 |
5,670.00 |
4.00 |
5,400.00 |
4.00 |
5,400.00 |
4.50 |
6,075.00 |
| 715-01 |
topsoil(6" depth)
|
25   |
CUYD |
52.50 |
1,312.50 |
48.00 |
1,200.00 |
20.00 |
500.00 |
50.00 |
1,250.00 |
| 717-01-A |
seeding(bermuda)
|
130   |
LB |
12.60 |
1,638.00 |
13.00 |
1,690.00 |
12.00 |
1,560.00 |
50.00 |
6,500.00 |
| 719-01-A |
plants (lirope, 4" pot (12" spacing, 1.1/sf))
|
1,120   |
EACH |
1.90 |
2,128.00 |
2.00 |
2,240.00 |
2.00 |
2,240.00 |
2.25 |
2,520.00 |
| 719-01-B |
plants (asian jasmine, 1 gallon (24" spacing, 3.3/sf))
|
1,226   |
EACH |
3.15 |
3,861.90 |
3.00 |
3,678.00 |
3.00 |
3,678.00 |
4.50 |
5,517.00 |
| 719-01-C |
plants (aztec grass, 1 gallon (24" spacing, 3.3/sf))
|
69   |
EACH |
4.20 |
289.80 |
4.00 |
276.00 |
4.00 |
276.00 |
5.00 |
345.00 |
| 719-01-D |
plants (dwarf indian hawthorn, 3 gallon)
|
96   |
EACH |
15.75 |
1,512.00 |
16.00 |
1,536.00 |
15.00 |
1,440.00 |
21.50 |
2,064.00 |
| 719-02 |
top dressing mulch (3" depth)
|
665   |
SQYD |
3.15 |
2,094.75 |
3.00 |
1,995.00 |
3.00 |
1,995.00 |
5.00 |
3,325.00 |
| 719-03 |
bed preparation (10" depth, min.)
|
665   |
SQYD |
10.50 |
6,982.50 |
10.00 |
6,650.00 |
10.00 |
6,650.00 |
5.00 |
3,325.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
35,000.00 |
35,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
106   |
SQYD |
94.50 |
10,017.00 |
70.00 |
7,420.00 |
90.00 |
9,540.00 |
110.00 |
11,660.00 |
| 726-01 |
bedding material
|
149.8 |
CUYD |
26.25 |
3,932.25 |
40.00 |
5,992.00 |
40.00 |
5,992.00 |
65.00 |
9,737.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
420,000.00 |
420,000.00 |
445,000.00 |
445,000.00 |
475,000.00 |
475,000.00 |
370,000.00 |
370,000.00 |
| 729-01 |
sign (type a)
|
293.0 |
SQFT |
23.00 |
6,739.00 |
23.00 |
6,739.00 |
22.00 |
6,446.00 |
25.00 |
7,325.00 |
| 729-04 |
sign (type d)
|
154.0 |
SQFT |
26.00 |
4,004.00 |
27.00 |
4,158.00 |
25.00 |
3,850.00 |
30.00 |
4,620.00 |
| 729-05 |
sign (type e)
|
5.5 |
SQFT |
26.00 |
143.00 |
27.00 |
148.50 |
25.00 |
137.50 |
30.00 |
165.00 |
| 729-08-A |
mounting (2 1/2" post)
|
42   |
EACH |
865.00 |
36,330.00 |
890.00 |
37,380.00 |
825.00 |
34,650.00 |
1,000.00 |
42,000.00 |
| 729-08-B |
mounting (3 1/2" post)
|
1   |
EACH |
890.00 |
890.00 |
900.00 |
900.00 |
850.00 |
850.00 |
1,450.00 |
1,450.00 |
| 729-08-E |
mounting (s3 x 5.7)
|
6   |
EACH |
1,000.00 |
6,000.00 |
1,000.00 |
6,000.00 |
950.00 |
5,700.00 |
1,800.00 |
10,800.00 |
| 730-15 |
relocate light poles (40' w/6' arm, p&k)
|
3   |
EACH |
1,875.00 |
5,625.00 |
1,900.00 |
5,700.00 |
2,500.00 |
7,500.00 |
2,100.00 |
6,300.00 |
| 731-02 |
reflectorized raised pavement markers
|
318   |
EACH |
5.65 |
1,796.70 |
5.00 |
1,590.00 |
6.00 |
1,908.00 |
6.50 |
2,067.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
15,908   |
LNFT |
0.46 |
7,317.68 |
0.45 |
7,158.60 |
0.50 |
7,954.00 |
0.50 |
7,954.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
1,476   |
LNFT |
0.92 |
1,357.92 |
1.00 |
1,476.00 |
1.00 |
1,476.00 |
1.00 |
1,476.00 |
| 732-01-D |
plastic pavement striping (12" width)
|
475   |
LNFT |
1.85 |
878.75 |
2.00 |
950.00 |
2.00 |
950.00 |
2.00 |
950.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,095   |
LNFT |
2.65 |
2,901.75 |
2.50 |
2,737.50 |
2.50 |
2,737.50 |
3.00 |
3,285.00 |
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
1.000 |
MILE |
800.00 |
800.00 |
800.00 |
800.00 |
760.00 |
760.00 |
950.00 |
950.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
25   |
EACH |
140.00 |
3,500.00 |
150.00 |
3,750.00 |
150.00 |
3,750.00 |
170.00 |
4,250.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
10   |
EACH |
205.00 |
2,050.00 |
200.00 |
2,000.00 |
200.00 |
2,000.00 |
240.00 |
2,400.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
21   |
EACH |
130.00 |
2,730.00 |
130.00 |
2,730.00 |
125.00 |
2,625.00 |
150.00 |
3,150.00 |
| 732-05 |
removal of existing markings
|
1.810 |
MILE |
2,625.00 |
4,751.25 |
2,700.00 |
4,887.00 |
2,500.00 |
4,525.00 |
3,000.00 |
5,430.00 |
| 733-01-A |
concrete roadway barrier (32" single face)
|
276.0 |
LNFT |
75.00 |
20,700.00 |
155.00 |
42,780.00 |
80.00 |
22,080.00 |
125.00 |
34,500.00 |
| 733-01-B |
concrete roadway barrier (42" single face)
|
291.0 |
LNFT |
110.00 |
32,010.00 |
180.00 |
52,380.00 |
130.00 |
37,830.00 |
130.00 |
37,830.00 |
| 733-01-C |
concrete roadway barrier (42" double face)
|
115.0 |
LNFT |
170.00 |
19,550.00 |
215.00 |
24,725.00 |
135.00 |
15,525.00 |
180.00 |
20,700.00 |
| 733-01-D |
concrete roadway barrier (45" single face)
|
316.0 |
LNFT |
110.00 |
34,760.00 |
170.00 |
53,720.00 |
140.00 |
44,240.00 |
170.00 |
53,720.00 |
| 733-01-E |
concrete roadway barrier (54" single face)
|
151.0 |
LNFT |
160.00 |
24,160.00 |
230.00 |
34,730.00 |
250.00 |
37,750.00 |
245.00 |
36,995.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
75,000.00 |
75,000.00 |
80,000.00 |
80,000.00 |
125,000.00 |
125,000.00 |
100,000.00 |
100,000.00 |
| 802-02 |
structural excavation for intermediate bents
|
79.3 |
CUYD |
30.00 |
2,379.00 |
155.00 |
12,291.50 |
250.00 |
19,825.00 |
250.00 |
19,825.00 |
| 804-01-C |
precast concrete piles (16")
|
1,875   |
LNFT |
60.00 |
112,500.00 |
34.00 |
63,750.00 |
75.00 |
140,625.00 |
72.50 |
135,937.50 |
| 804-02-A |
treated timber piles (noncoastal treatment)
|
6,084   |
LNFT |
14.00 |
85,176.00 |
9.00 |
54,756.00 |
15.00 |
91,260.00 |
16.50 |
100,386.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
500.00 |
1,000.00 |
5,000.00 |
10,000.00 |
2,000.00 |
4,000.00 |
1,500.00 |
3,000.00 |
| 805-01-C |
class a concrete (retaining walls)
|
38.34 |
CUYD |
1,200.00 |
46,008.00 |
1,500.00 |
57,510.00 |
2,000.00 |
76,680.00 |
1,350.00 |
51,759.00 |
| 805-01-D |
class a concrete (footings)
|
128.59 |
CUYD |
450.00 |
57,865.50 |
800.00 |
102,872.00 |
300.00 |
38,577.00 |
800.00 |
102,872.00 |
| 805-01-E |
class a concrete (piers)
|
21.71 |
CUYD |
750.00 |
16,282.50 |
1,200.00 |
26,052.00 |
500.00 |
10,855.00 |
1,500.00 |
32,565.00 |
| 805-01-F |
class a concrete (bents)
|
32.95 |
CUYD |
1,100.00 |
36,245.00 |
1,500.00 |
49,425.00 |
550.00 |
18,122.50 |
1,450.00 |
47,777.50 |
| 805-01-I |
class a concrete (curtain wall)
|
106.37 |
CUYD |
1,100.00 |
117,007.00 |
1,400.00 |
148,918.00 |
1,800.00 |
191,466.00 |
1,400.00 |
148,918.00 |
| 805-03 |
class aa concrete
|
144.87 |
CUYD |
750.00 |
108,652.50 |
1,100.00 |
159,357.00 |
900.00 |
130,383.00 |
1,200.00 |
173,844.00 |
| 805-08-A |
precast-prestressed concrete girders (type i)
|
210.8 |
LNFT |
70.00 |
14,756.00 |
100.00 |
21,080.00 |
120.00 |
25,296.00 |
135.00 |
28,458.00 |
| 805-09 |
expansion joint seal
|
163.92 |
LNFT |
50.00 |
8,196.00 |
50.00 |
8,196.00 |
20.00 |
3,278.40 |
68.00 |
11,146.56 |
| 805-11 |
strip seal joints
|
19.48 |
LNFT |
150.00 |
2,922.00 |
220.00 |
4,285.60 |
150.00 |
2,922.00 |
250.00 |
4,870.00 |
| 806-01 |
deformed reinforcing steel
|
73,898   |
LB |
0.75 |
55,423.50 |
0.94 |
69,464.12 |
0.70 |
51,728.60 |
0.85 |
62,813.30 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
| 810-01 |
concrete railing (32" barrier)
|
474.76 |
LNFT |
45.00 |
21,364.20 |
85.00 |
40,354.60 |
80.00 |
37,980.80 |
130.00 |
61,718.80 |
| 813-01 |
concrete approach slabs
|
65.36 |
SQYD |
220.00 |
14,379.20 |
310.00 |
20,261.60 |
200.00 |
13,072.00 |
185.00 |
12,091.60 |
| S-001 |
removal of existing signal equipment
|
lump |
LUMP |
46,000.00 |
46,000.00 |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
| S-002 |
upgrade of existing controller cabinet
|
20   |
EACH |
20,000.00 |
400,000.00 |
20,700.00 |
414,000.00 |
20,000.00 |
400,000.00 |
24,000.00 |
480,000.00 |
| S-003 |
signal support (standard)(foundation, pedestal pole,
10') |
9   |
EACH |
950.00 |
8,550.00 |
1,000.00 |
9,000.00 |
900.00 |
8,100.00 |
1,000.00 |
9,000.00 |
| S-004 |
signal support (standard)(foundation, pole, 25' arm)
|
5   |
EACH |
6,900.00 |
34,500.00 |
7,000.00 |
35,000.00 |
6,500.00 |
32,500.00 |
8,000.00 |
40,000.00 |
| S-005 |
signal support (standard)(foundation, pole, 25' & 25'
arms) |
3   |
EACH |
9,400.00 |
28,200.00 |
9,500.00 |
28,500.00 |
10,000.00 |
30,000.00 |
10,000.00 |
30,000.00 |
| S-006 |
traffic signal head (3 section, 12" lens)
|
34   |
EACH |
970.00 |
32,980.00 |
1,000.00 |
34,000.00 |
1,000.00 |
34,000.00 |
1,000.00 |
34,000.00 |
| S-007 |
traffic signal head (5 section, 12" lens)
|
6   |
EACH |
1,500.00 |
9,000.00 |
1,500.00 |
9,000.00 |
1,500.00 |
9,000.00 |
1,700.00 |
10,200.00 |
| S-008 |
traffic signal head (2 section, 12" lens)
|
1   |
EACH |
650.00 |
650.00 |
700.00 |
700.00 |
700.00 |
700.00 |
750.00 |
750.00 |
| S-011 |
detector lead-in cable (no. 14/2/os)
|
8,001   |
LNFT |
0.68 |
5,440.68 |
0.70 |
5,600.70 |
0.65 |
5,200.65 |
0.70 |
5,600.70 |
| S-016 |
traffic signal cable (no. 14/7c)
|
10,325   |
LNFT |
1.54 |
15,900.50 |
1.50 |
15,487.50 |
1.50 |
15,487.50 |
1.70 |
17,552.50 |
| S-017 |
loop detector
|
57   |
EACH |
1,190.00 |
67,830.00 |
1,200.00 |
68,400.00 |
1,200.00 |
68,400.00 |
1,300.00 |
74,100.00 |
| S-018 |
conduit (2")
|
16,925   |
LNFT |
13.35 |
225,948.75 |
13.50 |
228,487.50 |
14.00 |
236,950.00 |
15.00 |
253,875.00 |
| S-019 |
conduit (3")
|
980   |
LNFT |
28.25 |
27,685.00 |
29.00 |
28,420.00 |
27.00 |
26,460.00 |
30.00 |
29,400.00 |
| S-020 |
conduit (4")
|
2,585   |
LNFT |
30.00 |
77,550.00 |
31.00 |
80,135.00 |
30.00 |
77,550.00 |
35.00 |
90,475.00 |
| S-021 |
loop detector testing
|
43   |
EACH |
160.00 |
6,880.00 |
165.00 |
7,095.00 |
150.00 |
6,450.00 |
175.00 |
7,525.00 |
| S-022 |
pull box (structure mount, nema type 4x)
|
16   |
EACH |
1,900.00 |
30,400.00 |
1,900.00 |
30,400.00 |
2,000.00 |
32,000.00 |
2,000.00 |
32,000.00 |
| S-023 |
electrical junction box (type e)
|
60   |
EACH |
665.00 |
39,900.00 |
675.00 |
40,500.00 |
700.00 |
42,000.00 |
750.00 |
45,000.00 |
| S-024 |
traffic manhole
|
27   |
EACH |
900.00 |
24,300.00 |
900.00 |
24,300.00 |
1,000.00 |
27,000.00 |
1,000.00 |
27,000.00 |
| S-025 |
twisted pair communications cable, 6 pair
|
33,910   |
LNFT |
0.90 |
30,519.00 |
0.90 |
30,519.00 |
1.00 |
33,910.00 |
1.00 |
33,910.00 |
| S-026 |
fiber optic communications cable, 12-fiber
|
33,910   |
LNFT |
0.90 |
30,519.00 |
0.90 |
30,519.00 |
1.00 |
33,910.00 |
1.00 |
33,910.00 |
| S-027 |
mast arm replacement (o'keefe & howard)
|
1   |
EACH |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
3,500.00 |
3,500.00 |
| S-029 |
cut and patch asphalt
|
415   |
LNFT |
60.00 |
24,900.00 |
30.00 |
12,450.00 |
60.00 |
24,900.00 |
70.00 |
29,050.00 |
| S-031 |
cut and patch brick sidewalk
|
715   |
LNFT |
52.50 |
37,537.50 |
22.00 |
15,730.00 |
100.00 |
71,500.00 |
100.00 |
71,500.00 |
| S-032 |
signal support (ornamental)(foundation, pole, 10'arm)
|
3   |
EACH |
10,000.00 |
30,000.00 |
10,000.00 |
30,000.00 |
10,000.00 |
30,000.00 |
11,500.00 |
34,500.00 |
| S-033 |
electric traffic gate
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
11,500.00 |
11,500.00 |
| S-034 |
signal support (ornamental)(foundation, pedestal pole,
10') |
1   |
EACH |
3,100.00 |
3,100.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
3,500.00 |
3,500.00 |
| S-036 |
nema ts type ii traffic signal master controller
|
3   |
EACH |
23,000.00 |
69,000.00 |
24,000.00 |
72,000.00 |
24,000.00 |
72,000.00 |
25,000.00 |
75,000.00 |
| S-037 |
dynamic message signs
|
5   |
EACH |
7,800.00 |
39,000.00 |
8,000.00 |
40,000.00 |
8,000.00 |
40,000.00 |
9,000.00 |
45,000.00 |
| S-038 |
vehicular signal heads, optically programmed
(3 section, 12" lens) |
16   |
EACH |
2,850.00 |
45,600.00 |
3,000.00 |
48,000.00 |
3,000.00 |
48,000.00 |
3,200.00 |
51,200.00 |
| S-039 |
signal support (standard)(foundation, pole, 35' arm)
|
1   |
EACH |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
| S-041 |
gate control cable (no. 16/2c)
|
923   |
LNFT |
0.60 |
553.80 |
0.60 |
553.80 |
0.60 |
553.80 |
0.65 |
599.95 |
| S-042 |
system dial up access (west bank)
|
lump |
LUMP |
3,300.00 |
3,300.00 |
3,400.00 |
3,400.00 |
3,200.00 |
3,200.00 |
3,600.00 |
3,600.00 |
| S-043 |
system monitoring interface (east bank)(city hall)
|
lump |
LUMP |
3,300.00 |
3,300.00 |
3,300.00 |
3,300.00 |
3,100.00 |
3,100.00 |
3,600.00 |
3,600.00 |
| S-050 |
new lighting controller box & fence enclosure
|
lump |
LUMP |
9,500.00 |
9,500.00 |
9,500.00 |
9,500.00 |
9,000.00 |
9,000.00 |
10,500.00 |
10,500.00 |
| S-051 |
10' chain link fence w/barbed wire
|
130   |
LNFT |
125.00 |
16,250.00 |
125.00 |
16,250.00 |
120.00 |
15,600.00 |
30.00 |
3,900.00 |
| S-053 |
repair of existing concrete curb
|
200   |
LNFT |
16.00 |
3,200.00 |
15.00 |
3,000.00 |
30.00 |
6,000.00 |
6.00 |
1,200.00 |
| S-054 |
removal and relocation of type "a" sign
|
4   |
EACH |
105.00 |
420.00 |
100.00 |
400.00 |
100.00 |
400.00 |
300.00 |
1,200.00 |
| S-055 |
impact attenuators (construction zone)
|
2   |
EACH |
28,000.00 |
56,000.00 |
22,000.00 |
44,000.00 |
25,000.00 |
50,000.00 |
25,000.00 |
50,000.00 |
| S-056 |
convert inlet to manhole
|
2   |
EACH |
2,100.00 |
4,200.00 |
5,000.00 |
10,000.00 |
4,000.00 |
8,000.00 |
3,000.00 |
6,000.00 |
| S-057 |
convert manhole to inlet
|
7   |
EACH |
2,100.00 |
14,700.00 |
5,000.00 |
35,000.00 |
4,000.00 |
28,000.00 |
3,000.00 |
21,000.00 |
| S-060 |
precast concrete detectable warning paver landing
|
48   |
SQFT |
52.50 |
2,520.00 |
16.00 |
768.00 |
40.00 |
1,920.00 |
45.00 |
2,160.00 |
| S-061 |
brick paver walk (ddd standard sidewalks)
|
2,225   |
SQFT |
25.00 |
55,625.00 |
12.00 |
26,700.00 |
30.00 |
66,750.00 |
16.50 |
36,712.50 |
| S-063 |
transplanting trees (crape myrtles)
|
20   |
EACH |
105.00 |
2,100.00 |
100.00 |
2,000.00 |
150.00 |
3,000.00 |
300.00 |
6,000.00 |
| S-064 |
irrigation system modifications
|
lump |
LUMP |
9,300.00 |
9,300.00 |
9,500.00 |
9,500.00 |
10,000.00 |
10,000.00 |
12,500.00 |
12,500.00 |
| S-065 |
relocate trailblazing signs
|
2   |
EACH |
2,350.00 |
4,700.00 |
3,500.00 |
7,000.00 |
3,500.00 |
7,000.00 |
3,500.00 |
7,000.00 |
| S-066 |
relocate safety call box
|
1   |
EACH |
1,400.00 |
1,400.00 |
1,400.00 |
1,400.00 |
5,000.00 |
5,000.00 |
1,500.00 |
1,500.00 |
| S-067 |
relocate trash receptacle
|
1   |
EACH |
320.00 |
320.00 |
150.00 |
150.00 |
500.00 |
500.00 |
150.00 |
150.00 |
| S-101 |
removal of barrier railing
|
528.59 |
LNFT |
25.00 |
13,214.75 |
25.00 |
13,214.75 |
20.00 |
10,571.80 |
52.00 |
27,486.68 |
| S-102 |
removal of concrete
|
157.00 |
CUYD |
135.00 |
21,195.00 |
100.00 |
15,700.00 |
300.00 |
47,100.00 |
325.00 |
51,025.00 |
| S-103 |
mechanical butt splice
|
94   |
EACH |
60.00 |
5,640.00 |
55.00 |
5,170.00 |
100.00 |
9,400.00 |
60.00 |
5,640.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,335,642.72 |
|
4,449,800.97 |
|
4,857,844.93 |
|