| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARBER BROS. CONTRACTING CO., L.L.C |
- 3 - BARRIERE CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,188   |
LNFT |
5.16 |
6,130.08 |
5.50 |
6,534.00 |
5.00 |
5,940.00 |
|
|
| 202-02-I |
removal of surfacing and base
|
2,440   |
SQYD |
7.88 |
19,227.20 |
3.00 |
7,320.00 |
4.00 |
9,760.00 |
|
|
| 202-02-J |
removal of asphalt drives
|
960   |
SQYD |
16.83 |
16,156.80 |
10.00 |
9,600.00 |
6.00 |
5,760.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,905   |
CUYD |
11.00 |
20,955.00 |
15.00 |
28,575.00 |
13.00 |
24,765.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
200.0 |
CUYD |
86.81 |
17,362.00 |
36.00 |
7,200.00 |
35.00 |
7,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
21,672.3 |
TON |
43.89 |
951,197.24 |
48.00 |
1,040,270.40 |
46.00 |
996,925.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
2,527.8 |
TON |
63.91 |
161,551.69 |
60.00 |
151,668.00 |
46.00 |
116,278.80 |
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
90,411   |
SQYD |
2.03 |
183,534.33 |
2.25 |
203,424.75 |
2.00 |
180,822.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
87,614   |
SQYD |
0.54 |
47,311.56 |
1.00 |
87,614.00 |
0.80 |
70,091.20 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,850   |
CUYD |
0.10 |
- 185.00 |
FREE |
FREE |
1.00 |
- 1,850.00 |
|
|
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
50   |
LNFT |
72.28 |
3,614.00 |
130.00 |
6,500.00 |
100.00 |
5,000.00 |
|
|
| 701-02-G/H |
cross drain pipe arch (42" equiv. rcpa or 48" equiv.
cmpa) |
100   |
LNFT |
154.89 |
15,489.00 |
150.00 |
15,000.00 |
130.00 |
13,000.00 |
|
|
| 701-02-N/P |
cross drain pipe arch (84" equiv. rcpa or 96" equiv.
cmpa) |
64   |
LNFT |
387.23 |
24,782.72 |
500.00 |
32,000.00 |
450.00 |
28,800.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
4   |
LNFT |
134.24 |
536.96 |
125.00 |
500.00 |
150.00 |
600.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
134.24 |
2,147.84 |
150.00 |
2,400.00 |
180.00 |
2,880.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
8   |
LNFT |
154.89 |
1,239.12 |
200.00 |
1,600.00 |
200.00 |
1,600.00 |
|
|
| 701-15 |
concrete collar
|
5   |
EACH |
675.00 |
3,375.00 |
660.00 |
3,300.00 |
800.00 |
4,000.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
512.5 |
LNFT |
29.53 |
15,134.12 |
45.00 |
23,062.50 |
42.00 |
21,525.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
538.0 |
LNFT |
45.95 |
24,721.10 |
60.50 |
32,549.00 |
35.00 |
18,830.00 |
|
|
| 704-03 |
blocked out guard rail
|
162.5 |
LNFT |
17.55 |
2,851.87 |
20.00 |
3,250.00 |
16.00 |
2,600.00 |
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
16   |
EACH |
2,275.00 |
36,400.00 |
2,450.00 |
39,200.00 |
2,600.00 |
41,600.00 |
|
|
| 711-03-C |
riprap (30 lb)
|
75.0 |
TON |
51.63 |
3,872.25 |
75.00 |
5,625.00 |
90.00 |
6,750.00 |
|
|
| 711-04 |
geotextile fabric
|
54   |
SQYD |
2.07 |
111.78 |
3.00 |
162.00 |
8.00 |
432.00 |
|
|
| 712-03 |
stone revetment
|
150   |
SQYD |
51.63 |
7,744.50 |
45.00 |
6,750.00 |
50.00 |
7,500.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,800.00 |
12,800.00 |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
33   |
LNFT |
1.24 |
40.92 |
2.00 |
66.00 |
2.00 |
66.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
21.420 |
MILE |
310.00 |
6,640.20 |
300.00 |
6,426.00 |
130.00 |
2,784.60 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
16.140 |
MILE |
275.00 |
4,438.50 |
300.00 |
4,842.00 |
40.00 |
645.60 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
63.090 |
MILE |
490.00 |
30,914.10 |
300.00 |
18,927.00 |
60.00 |
3,785.40 |
|
|
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
785   |
EACH |
1.55 |
1,216.75 |
2.00 |
1,570.00 |
2.00 |
1,570.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
0.72 |
ACRE |
827.00 |
595.44 |
1,000.00 |
720.00 |
900.00 |
648.00 |
|
|
| 717-01 |
seeding
|
270   |
LB |
7.13 |
1,925.10 |
10.00 |
2,700.00 |
10.00 |
2,700.00 |
|
|
| 718-01 |
fertilizer
|
9,000   |
LB |
0.21 |
1,890.00 |
0.25 |
2,250.00 |
0.50 |
4,500.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
400   |
SQYD |
56.13 |
22,452.00 |
60.00 |
24,000.00 |
50.00 |
20,000.00 |
|
|
| 724-02 |
pavement widening
|
18,794.5 |
SQYD |
23.40 |
439,791.30 |
26.00 |
488,657.00 |
30.00 |
563,835.00 |
|
|
| 726-01 |
bedding material
|
60.0 |
CUYD |
36.14 |
2,168.40 |
75.00 |
4,500.00 |
50.00 |
3,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
89,890.00 |
89,890.00 |
98,000.00 |
98,000.00 |
210,000.00 |
210,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
41   |
EACH |
77.45 |
3,175.45 |
80.00 |
3,280.00 |
80.00 |
3,280.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
942   |
EACH |
5.37 |
5,058.54 |
6.00 |
5,652.00 |
5.20 |
4,898.40 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
11   |
LNFT |
3.04 |
33.44 |
4.00 |
44.00 |
7.00 |
77.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.030 |
MILE |
2,005.00 |
42,165.15 |
2,200.00 |
46,266.00 |
1,950.00 |
41,008.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.380 |
MILE |
745.00 |
4,008.10 |
800.00 |
4,304.00 |
750.00 |
4,035.00 |
|
|
| 735-01 |
mailboxes
|
23   |
EACH |
12.00 |
276.00 |
6.00 |
138.00 |
5.00 |
115.00 |
|
|
| 735-02 |
mailbox supports (single)
|
23   |
EACH |
175.40 |
4,034.20 |
145.00 |
3,335.00 |
120.00 |
2,760.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
17,000.00 |
17,000.00 |
20,000.00 |
20,000.00 |
16,000.00 |
16,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
31.36 |
CUYD |
722.84 |
22,668.26 |
1,000.00 |
31,360.00 |
1,000.00 |
31,360.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
44.0 |
LNFT |
361.42 |
15,902.48 |
375.00 |
16,500.00 |
850.00 |
37,400.00 |
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
26.0 |
LNFT |
387.23 |
10,067.98 |
475.00 |
12,350.00 |
950.00 |
24,700.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
2,294   |
LB |
1.03 |
2,362.82 |
2.50 |
5,735.00 |
2.20 |
5,046.80 |
|
|
| S-001 |
u-channel post installation
|
55   |
each |
41.30 |
2,271.50 |
75.00 |
4,125.00 |
50.00 |
2,750.00 |
|
|
| S-002 |
cleaning existing ditches
|
1,000   |
LNFT |
2.58 |
2,580.00 |
6.00 |
6,000.00 |
4.50 |
4,500.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,311,627.79 |
|
2,575,851.65 |
|
2,592,075.10 |
|
|
|