Letting of 10/27/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 254-06-0015
Parish: ST HELENA
Routes: LA 43
Description: N. JCT. LA. 10 - JCT. LA. 38
Type Const: grading, drainage structures, cold planing asphaltic concrete, superpave asphaltic
concrete pavement, asphaltic surface treatment, pavement widening, and related work.
 
RankLicenseBidderAmount
112487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,311,627.79
200046 BARBER BROS. CONTRACTING CO., L.L.C $2,575,851.65
306276 BARRIERE CONSTRUCTION CO., LLC. $2,592,075.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
BARRIERE CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,188      LNFT 5.16 6,130.08 5.50 6,534.00 5.00 5,940.00    
202-02-I removal of surfacing and base 2,440      SQYD 7.88 19,227.20 3.00 7,320.00 4.00 9,760.00    
202-02-J removal of asphalt drives 960      SQYD 16.83 16,156.80 10.00 9,600.00 6.00 5,760.00    
203-08 borrow (vehicular measurement) 1,905      CUYD 11.00 20,955.00 15.00 28,575.00 13.00 24,765.00    
402-01 traffic maintenance aggregate (vehicular measurement) 200.0    CUYD 86.81 17,362.00 36.00 7,200.00 35.00 7,000.00    
502-01 superpave asphaltic concrete 21,672.3    TON 43.89 951,197.24 48.00 1,040,270.40 46.00 996,925.80    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
2,527.8    TON 63.91 161,551.69 60.00 151,668.00 46.00 116,278.80    
507-01-B asphaltic surface treatment (2 applications) 90,411      SQYD 2.03 183,534.33 2.25 203,424.75 2.00 180,822.00    
509-01 cold planing asphaltic pavement 87,614      SQYD 0.54 47,311.56 1.00 87,614.00 0.80 70,091.20    
509-02 contractor retained reclaimed asphaltic pavement - 1,850      CUYD 0.10 - 185.00 FREE FREE 1.00 - 1,850.00    
701-02-D/E cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa)
50      LNFT 72.28 3,614.00 130.00 6,500.00 100.00 5,000.00    
701-02-G/H cross drain pipe arch (42" equiv. rcpa or 48" equiv.
cmpa)
100      LNFT 154.89 15,489.00 150.00 15,000.00 130.00 13,000.00    
701-02-N/P cross drain pipe arch (84" equiv. rcpa or 96" equiv.
cmpa)
64      LNFT 387.23 24,782.72 500.00 32,000.00 450.00 28,800.00    
701-10-I reinforced concrete pipe (extension)(24") 4      LNFT 134.24 536.96 125.00 500.00 150.00 600.00    
701-10-K reinforced concrete pipe (extension)(30") 16      LNFT 134.24 2,147.84 150.00 2,400.00 180.00 2,880.00    
701-10-M reinforced concrete pipe (extension)(36") 8      LNFT 154.89 1,239.12 200.00 1,600.00 200.00 1,600.00    
701-15 concrete collar 5      EACH 675.00 3,375.00 660.00 3,300.00 800.00 4,000.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 512.5    LNFT 29.53 15,134.12 45.00 23,062.50 42.00 21,525.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 538.0    LNFT 45.95 24,721.10 60.50 32,549.00 35.00 18,830.00    
704-03 blocked out guard rail 162.5    LNFT 17.55 2,851.87 20.00 3,250.00 16.00 2,600.00    
704-11-B guard rail end treatment (tangent) 16      EACH 2,275.00 36,400.00 2,450.00 39,200.00 2,600.00 41,600.00    
711-03-C riprap (30 lb) 75.0    TON 51.63 3,872.25 75.00 5,625.00 90.00 6,750.00    
711-04 geotextile fabric 54      SQYD 2.07 111.78 3.00 162.00 8.00 432.00    
712-03 stone revetment 150      SQYD 51.63 7,744.50 45.00 6,750.00 50.00 7,500.00    
713-01 temporary signs & barricades lump      LUMP 12,800.00 12,800.00 50,000.00 50,000.00 30,000.00 30,000.00    
713-03-E temporary pavement markings (24" width) 33      LNFT 1.24 40.92 2.00 66.00 2.00 66.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
21.420  MILE 310.00 6,640.20 300.00 6,426.00 130.00 2,784.60    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
16.140  MILE 275.00 4,438.50 300.00 4,842.00 40.00 645.60    
713-05-A temporary pavement markings (solid line)(4" width) 63.090  MILE 490.00 30,914.10 300.00 18,927.00 60.00 3,785.40    
713-07-A temporary reflectorized raised pavement markers (tabs) 785      EACH 1.55 1,216.75 2.00 1,570.00 2.00 1,570.00    
716-01-A mulch (vegetative) 0.72   ACRE 827.00 595.44 1,000.00 720.00 900.00 648.00    
717-01 seeding 270      LB 7.13 1,925.10 10.00 2,700.00 10.00 2,700.00    
718-01 fertilizer 9,000      LB 0.21 1,890.00 0.25 2,250.00 0.50 4,500.00    
724-01-B pavement patching (12" minimum thickness) 400      SQYD 56.13 22,452.00 60.00 24,000.00 50.00 20,000.00    
724-02 pavement widening 18,794.5    SQYD 23.40 439,791.30 26.00 488,657.00 30.00 563,835.00    
726-01 bedding material 60.0    CUYD 36.14 2,168.40 75.00 4,500.00 50.00 3,000.00    
727-01 mobilization lump      LUMP 89,890.00 89,890.00 98,000.00 98,000.00 210,000.00 210,000.00    
729-16-C object marker assembly (type 3) 41      EACH 77.45 3,175.45 80.00 3,280.00 80.00 3,280.00    
731-02 reflectorized raised pavement markers 942      EACH 5.37 5,058.54 6.00 5,652.00 5.20 4,898.40    
732-01-E plastic pavement striping (24" width) 11      LNFT 3.04 33.44 4.00 44.00 7.00 77.00    
732-02-A plastic pavement striping (solid line) (4" width) 21.030  MILE 2,005.00 42,165.15 2,200.00 46,266.00 1,950.00 41,008.50    
732-03-A plastic pavement striping (broken line)(4" width) 5.380  MILE 745.00 4,008.10 800.00 4,304.00 750.00 4,035.00    
735-01 mailboxes 23      EACH 12.00 276.00 6.00 138.00 5.00 115.00    
735-02 mailbox supports (single) 23      EACH 175.40 4,034.20 145.00 3,335.00 120.00 2,760.00    
740-01 construction layout lump      LUMP 17,000.00 17,000.00 20,000.00 20,000.00 16,000.00 16,000.00    
805-01-B class a concrete (box culvert headwalls) 31.36   CUYD 722.84 22,668.26 1,000.00 31,360.00 1,000.00 31,360.00    
805-12-E reinforced concrete box culverts (4'x 4') 44.0    LNFT 361.42 15,902.48 375.00 16,500.00 850.00 37,400.00    
805-12-I reinforced concrete box culverts (5'x 5') 26.0    LNFT 387.23 10,067.98 475.00 12,350.00 950.00 24,700.00    
806-01 deformed reinforcing steel 2,294      LB 1.03 2,362.82 2.50 5,735.00 2.20 5,046.80    
S-001 u-channel post installation 55      each 41.30 2,271.50 75.00 4,125.00 50.00 2,750.00    
S-002 cleaning existing ditches 1,000      LNFT 2.58 2,580.00 6.00 6,000.00 4.50 4,500.00    
                       
 CONTRACTOR TOTAL       2,311,627.79   2,575,851.65   2,592,075.10    