| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BEST-YET BUILDERS, LLC |
- 3 - BENTON & BROWN, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
137   |
SQYD |
75.00 |
10,275.00 |
10.00 |
1,370.00 |
9.00 |
1,233.00 |
|
|
| 202-02-H |
removal of guard rail
|
293   |
LNFT |
3.50 |
1,025.50 |
4.00 |
1,172.00 |
3.00 |
879.00 |
|
|
| 202-02-I |
removal of box culvert headwalls
|
4   |
EACH |
800.00 |
3,200.00 |
1,000.00 |
4,000.00 |
1,500.00 |
6,000.00 |
|
|
| 202-02-J |
removal of pipe headwalls
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
500.00 |
500.00 |
|
|
| 203-03 |
muck excavation
|
300   |
CUYD |
1.00 |
300.00 |
5.00 |
1,500.00 |
10.00 |
3,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
9,000   |
CUYD |
1.50 |
13,500.00 |
9.00 |
81,000.00 |
8.00 |
72,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
50   |
EACH |
10.00 |
500.00 |
5.00 |
250.00 |
3.00 |
150.00 |
|
|
| 204-06 |
temporary silt fencing
|
100   |
LNFT |
10.00 |
1,000.00 |
3.50 |
350.00 |
3.00 |
300.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
28,070.2 |
TON |
50.00 |
1,403,510.00 |
50.00 |
1,403,510.00 |
46.00 |
1,291,229.20 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
723.4 |
TON |
45.00 |
32,553.00 |
70.00 |
50,638.00 |
46.00 |
33,276.40 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,863   |
SQYD |
6.50 |
12,109.50 |
2.00 |
3,726.00 |
5.00 |
9,315.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 122   |
CUYD |
1.00 |
- 122.00 |
0.01 |
- 1.22 |
1.00 |
- 122.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
59   |
LNFT |
120.00 |
7,080.00 |
150.00 |
8,850.00 |
80.00 |
4,720.00 |
|
|
| 701-05-F |
side drain pipe (15")
|
28   |
LNFT |
100.00 |
2,800.00 |
150.00 |
4,200.00 |
60.00 |
1,680.00 |
|
|
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
12   |
LNFT |
115.00 |
1,380.00 |
160.00 |
1,920.00 |
100.00 |
1,200.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
24   |
LNFT |
135.00 |
3,240.00 |
170.00 |
4,080.00 |
115.00 |
2,760.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
74   |
LNFT |
157.00 |
11,618.00 |
180.00 |
13,320.00 |
125.00 |
9,250.00 |
|
|
| 701-15 |
concrete collar
|
16   |
EACH |
650.00 |
10,400.00 |
50.00 |
800.00 |
600.00 |
9,600.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
2,600.00 |
2,600.00 |
|
|
| 702-04-A |
adjusting manholes
|
2   |
EACH |
500.00 |
1,000.00 |
650.00 |
1,300.00 |
600.00 |
1,200.00 |
|
|
| 702-07-C |
cross drain safety end (type 3)
|
2   |
EACH |
5,000.00 |
10,000.00 |
1,200.00 |
2,400.00 |
3,500.00 |
7,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
268.8 |
LNFT |
19.00 |
5,107.20 |
23.00 |
6,182.40 |
25.00 |
6,720.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,800.00 |
3,600.00 |
1,900.00 |
3,800.00 |
2,000.00 |
4,000.00 |
|
|
| 711-02-D |
riprap (55 lb)
|
90   |
CUYD |
140.00 |
12,600.00 |
150.00 |
13,500.00 |
65.00 |
5,850.00 |
|
|
| 711-04 |
geotextile fabric
|
90   |
SQYD |
1.00 |
90.00 |
3.50 |
315.00 |
1.00 |
90.00 |
|
|
| 712-02 |
sacked concrete revetment
|
575   |
SQYD |
60.00 |
34,500.00 |
50.00 |
28,750.00 |
45.00 |
25,875.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
41,500.00 |
41,500.00 |
25,000.00 |
25,000.00 |
120,000.00 |
120,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.700 |
MILE |
300.00 |
4,110.00 |
500.00 |
6,850.00 |
350.00 |
4,795.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.440 |
MILE |
1.00 |
7.44 |
290.00 |
2,157.60 |
10.00 |
74.40 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
30.565 |
MILE |
1.00 |
30.56 |
500.00 |
15,282.50 |
10.00 |
305.65 |
|
|
| 716-01-B |
mulch (fiber)
|
8.30 |
ACRE |
550.00 |
4,565.00 |
1,742.00 |
14,458.60 |
700.00 |
5,810.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
55.00 |
27,500.00 |
40.00 |
20,000.00 |
50.00 |
25,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
41,500.00 |
41,500.00 |
75,000.00 |
75,000.00 |
130,000.00 |
130,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
10   |
EACH |
75.00 |
750.00 |
75.00 |
750.00 |
86.00 |
860.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
905   |
EACH |
5.00 |
4,525.00 |
5.50 |
4,977.50 |
5.00 |
4,525.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
36   |
LNFT |
2.40 |
86.40 |
3.00 |
108.00 |
3.00 |
108.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
22.086 |
MILE |
1,900.00 |
41,963.40 |
1,980.00 |
43,730.28 |
2,200.00 |
48,589.20 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.730 |
MILE |
750.00 |
2,797.50 |
760.00 |
2,834.80 |
800.00 |
2,984.00 |
|
|
| 735-01 |
mailboxes
|
50   |
EACH |
1.00 |
50.00 |
10.00 |
500.00 |
55.00 |
2,750.00 |
|
|
| 735-02 |
mailbox supports (single)
|
24   |
EACH |
125.00 |
3,000.00 |
100.00 |
2,400.00 |
140.00 |
3,360.00 |
|
|
| 735-03 |
mailbox supports (double)
|
13   |
EACH |
175.00 |
2,275.00 |
200.00 |
2,600.00 |
200.00 |
2,600.00 |
|
|
| 739-01 |
hydro-seeding
|
8.30 |
ACRE |
1,250.00 |
10,375.00 |
1,742.00 |
14,458.60 |
1,400.00 |
11,620.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
43.94 |
CUYD |
1,000.00 |
43,940.00 |
900.00 |
39,546.00 |
900.00 |
39,546.00 |
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
28.0 |
LNFT |
1,000.00 |
28,000.00 |
300.00 |
8,400.00 |
450.00 |
12,600.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
2,949   |
LB |
2.00 |
5,898.00 |
2.00 |
5,898.00 |
2.00 |
5,898.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,872,639.50 |
|
1,943,884.06 |
|
1,946,730.85 |
|
|
|