| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - COMMAND CONSTRUCTION LLC |
- 4 - BEVERLY CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
600   |
CUYD |
15.00 |
9,000.00 |
5.00 |
3,000.00 |
8.00 |
4,800.00 |
17.70 |
10,620.00 |
| 502-01 |
superpave asphaltic concrete
|
191.7 |
TON |
70.00 |
13,419.00 |
90.00 |
17,253.00 |
105.00 |
20,128.50 |
111.65 |
21,403.30 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
4.3 |
TON |
120.00 |
516.00 |
400.00 |
1,720.00 |
500.00 |
2,150.00 |
502.50 |
2,160.75 |
| 509-01 |
cold planing asphaltic pavement
|
1,693   |
SQYD |
2.00 |
3,386.00 |
5.00 |
8,465.00 |
3.00 |
5,079.00 |
5.62 |
9,514.66 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 35   |
CUYD |
8.00 |
- 280.00 |
10.00 |
- 350.00 |
1.00 |
- 35.00 |
10.00 |
- 350.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
20,988   |
LNFT |
1.00 |
20,988.00 |
1.25 |
26,235.00 |
1.20 |
25,185.60 |
1.25 |
26,235.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
16,790   |
LNFT |
1.25 |
20,987.50 |
1.30 |
21,827.00 |
1.20 |
20,148.00 |
1.25 |
20,987.50 |
| 602-03 |
cleaning and sealing random cracks
|
2,000   |
LNFT |
2.00 |
4,000.00 |
2.75 |
5,500.00 |
2.70 |
5,400.00 |
2.70 |
5,400.00 |
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
300.0 |
SQYD |
125.00 |
37,500.00 |
100.00 |
30,000.00 |
115.00 |
34,500.00 |
91.50 |
27,450.00 |
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
1,000.0 |
SQYD |
95.00 |
95,000.00 |
92.00 |
92,000.00 |
95.00 |
95,000.00 |
85.50 |
85,500.00 |
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
1,300.0 |
SQYD |
80.00 |
104,000.00 |
92.00 |
119,600.00 |
85.00 |
110,500.00 |
83.00 |
107,900.00 |
| 702-03-C |
catch basins (cb-06)
|
3   |
EACH |
3,000.00 |
9,000.00 |
2,000.00 |
6,000.00 |
3,500.00 |
10,500.00 |
2,898.00 |
8,694.00 |
| 702-04-A |
adjusting manholes
|
5   |
EACH |
250.00 |
1,250.00 |
500.00 |
2,500.00 |
500.00 |
2,500.00 |
522.00 |
2,610.00 |
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
1,000.00 |
5,000.00 |
2,000.00 |
10,000.00 |
500.00 |
2,500.00 |
522.00 |
2,610.00 |
| 707-01 |
concrete curb
|
1,000.0 |
LNFT |
10.00 |
10,000.00 |
19.00 |
19,000.00 |
15.00 |
15,000.00 |
14.00 |
14,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
18,399.00 |
18,399.00 |
14,000.00 |
14,000.00 |
37,805.00 |
37,805.00 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
200   |
SQYD |
50.00 |
10,000.00 |
31.00 |
6,200.00 |
90.00 |
18,000.00 |
45.00 |
9,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
6,000.00 |
6,000.00 |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
525   |
EACH |
4.42 |
2,320.50 |
5.00 |
2,625.00 |
5.00 |
2,625.00 |
5.62 |
2,950.50 |
| 732-01-C |
plastic pavement striping (8" width)
|
630   |
LNFT |
0.75 |
472.50 |
0.80 |
504.00 |
1.00 |
630.00 |
0.95 |
598.50 |
| 732-01-E |
plastic pavement striping (24" width)
|
72   |
LNFT |
2.50 |
180.00 |
2.50 |
180.00 |
3.00 |
216.00 |
3.18 |
228.96 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.360 |
MILE |
1,674.50 |
10,649.82 |
1,800.00 |
11,448.00 |
1,800.00 |
11,448.00 |
2,127.60 |
13,531.53 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.180 |
MILE |
646.00 |
2,054.28 |
700.00 |
2,226.00 |
700.00 |
2,226.00 |
820.80 |
2,610.14 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
114.75 |
688.50 |
120.00 |
720.00 |
125.00 |
750.00 |
145.80 |
874.80 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
106.25 |
637.50 |
110.00 |
660.00 |
125.00 |
750.00 |
135.00 |
810.00 |
| 732-05 |
removal of existing markings
|
3.180 |
MILE |
3,655.00 |
11,622.90 |
4,000.00 |
12,720.00 |
4,000.00 |
12,720.00 |
4,644.00 |
14,767.92 |
| 740-01 |
construction layout
|
lump |
LUMP |
1,000.00 |
1,000.00 |
4,000.00 |
4,000.00 |
1,000.00 |
1,000.00 |
13,329.00 |
13,329.00 |
| S-001 |
rumble strips (ground-in)
|
0.8 |
MILE |
4,500.00 |
3,600.00 |
5,000.00 |
4,000.00 |
5,000.00 |
4,000.00 |
5,024.56 |
4,019.64 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
416,992.50 |
|
432,432.00 |
|
471,721.10 |
|
490,261.20 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
600   |
CUYD |
16.00 |
9,600.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
191.7 |
TON |
70.00 |
13,419.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
4.3 |
TON |
120.00 |
516.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
1,693   |
SQYD |
2.00 |
3,386.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 35   |
CUYD |
8.00 |
- 280.00 |
|
|
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
20,988   |
LNFT |
3.00 |
62,964.00 |
|
|
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
16,790   |
LNFT |
3.50 |
58,765.00 |
|
|
|
|
|
|
| 602-03 |
cleaning and sealing random cracks
|
2,000   |
LNFT |
3.00 |
6,000.00 |
|
|
|
|
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
300.0 |
SQYD |
150.00 |
45,000.00 |
|
|
|
|
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
1,000.0 |
SQYD |
125.00 |
125,000.00 |
|
|
|
|
|
|
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
1,300.0 |
SQYD |
100.00 |
130,000.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
3   |
EACH |
4,000.00 |
12,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
5   |
EACH |
600.00 |
3,000.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
750.00 |
3,750.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
1,000.0 |
LNFT |
25.00 |
25,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
24,000.00 |
24,000.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
200   |
SQYD |
65.00 |
13,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
525   |
EACH |
5.00 |
2,625.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
630   |
LNFT |
1.25 |
787.50 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
72   |
LNFT |
4.25 |
306.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.360 |
MILE |
2,100.00 |
13,356.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.180 |
MILE |
1,200.00 |
3,816.00 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
200.00 |
1,200.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
300.00 |
1,800.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
3.180 |
MILE |
2,000.00 |
6,360.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
0.8 |
MILE |
2,500.00 |
2,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
607,370.50 |
|
|
|
|
|
|
|