| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
5.00 |
500.00 |
10.00 |
1,000.00 |
|
|
|
|
| 302-02-A |
class ii base course (6" thick)
|
6,690.1 |
SQYD |
10.00 |
66,901.00 |
7.60 |
50,844.76 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,743.7 |
TON |
54.00 |
364,159.80 |
45.00 |
303,466.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
100.0 |
TON |
54.00 |
5,400.00 |
90.00 |
9,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
32,018   |
SQYD |
1.50 |
48,027.00 |
1.00 |
32,018.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 890   |
CUYD |
10.00 |
- 8,900.00 |
FREE |
FREE |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
64   |
LNFT |
60.00 |
3,840.00 |
90.00 |
5,760.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
11   |
LNFT |
60.00 |
660.00 |
120.00 |
1,320.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
670   |
LNFT |
60.00 |
40,200.00 |
90.00 |
60,300.00 |
|
|
|
|
| 701-14 |
cleaning existing pipes
|
285   |
LNFT |
10.00 |
2,850.00 |
20.00 |
5,700.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
9   |
EACH |
3,500.00 |
31,500.00 |
3,000.00 |
27,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,874   |
LNFT |
0.10 |
187.40 |
0.10 |
187.40 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,200   |
LNFT |
0.20 |
240.00 |
0.30 |
360.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.049 |
MILE |
300.00 |
614.70 |
300.00 |
614.70 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
4.098 |
MILE |
10.00 |
40.98 |
10.00 |
40.98 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
8.197 |
MILE |
10.00 |
81.97 |
20.00 |
163.94 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
2   |
EACH |
60.00 |
120.00 |
10.00 |
20.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
250   |
SQYD |
30.00 |
7,500.00 |
50.00 |
12,500.00 |
|
|
|
|
| 724-02 |
pavement widening
|
6,690.1 |
SQYD |
25.00 |
167,252.50 |
30.00 |
200,703.00 |
|
|
|
|
| 726-01 |
bedding material
|
116.0 |
CUYD |
42.00 |
4,872.00 |
70.00 |
8,120.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
85,000.00 |
85,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
815   |
EACH |
5.50 |
4,482.50 |
5.00 |
4,075.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,530   |
LNFT |
1.00 |
1,530.00 |
1.00 |
1,530.00 |
|
|
|
|
| 732-01-C-01 |
plastic pavement striping (dashed)(8" width)
|
728   |
LNFT |
1.00 |
728.00 |
1.00 |
728.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
400   |
LNFT |
3.00 |
1,200.00 |
3.00 |
1,200.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.732 |
MILE |
2,000.00 |
5,464.00 |
2,000.00 |
5,464.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.366 |
MILE |
800.00 |
1,092.80 |
1,000.00 |
1,366.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
140.00 |
280.00 |
130.00 |
260.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
500   |
LNFT |
1.00 |
500.00 |
8.00 |
4,000.00 |
|
|
|
|
| S-002 |
rumble strips (ground-in)
|
1.4 |
MILE |
2,500.00 |
3,500.00 |
4,000.00 |
5,600.00 |
|
|
|
|
| S-003 |
variable message sign unit
|
2   |
EACH |
4,000.00 |
8,000.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
827,824.65 |
|
865,342.28 |
|
|
|
|
|