| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
52,000.00 |
52,000.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
50   |
CUYD |
100.00 |
5,000.00 |
25.00 |
1,250.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,371   |
CUYD |
17.00 |
23,307.00 |
45.00 |
61,695.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,994.4 |
TON |
59.50 |
773,166.80 |
58.56 |
760,952.06 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
267.9 |
TON |
140.00 |
37,506.00 |
105.93 |
28,378.64 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
75,238   |
SQYD |
1.85 |
139,190.30 |
2.75 |
206,904.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
73,712   |
SQYD |
1.85 |
136,367.20 |
1.00 |
73,712.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,028   |
CUYD |
0.01 |
- 20.28 |
0.10 |
- 202.80 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
8   |
LNFT |
175.00 |
1,400.00 |
172.00 |
1,376.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
600.00 |
600.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
95,000.00 |
95,000.00 |
37,500.00 |
37,500.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
72   |
LNFT |
2.00 |
144.00 |
1.00 |
72.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
15.528 |
MILE |
165.00 |
2,562.12 |
300.00 |
4,658.40 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
14.820 |
MILE |
175.00 |
2,593.50 |
300.00 |
4,446.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
35.226 |
MILE |
265.00 |
9,334.89 |
500.00 |
17,613.00 |
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
683   |
EACH |
1.15 |
785.45 |
2.00 |
1,366.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
454   |
SQYD |
99.50 |
45,173.00 |
81.00 |
36,774.00 |
|
|
|
|
| 724-02 |
pavement widening
|
2,751.0 |
SQYD |
22.00 |
60,522.00 |
38.50 |
105,913.50 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,140.0 |
TON |
75.00 |
85,500.00 |
175.00 |
199,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
17.3 |
CUYD |
65.00 |
1,124.50 |
75.00 |
1,297.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
54,500.00 |
54,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
683   |
EACH |
7.75 |
5,293.25 |
7.50 |
5,122.50 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
24   |
LNFT |
35.00 |
840.00 |
3.25 |
78.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.742 |
MILE |
2,975.00 |
34,932.45 |
2,500.00 |
29,355.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.940 |
MILE |
1,200.00 |
5,928.00 |
900.00 |
4,446.00 |
|
|
|
|
| 735-01 |
mailboxes
|
4   |
EACH |
1.00 |
4.00 |
27.50 |
110.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
175.00 |
350.00 |
250.00 |
500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
215.00 |
215.00 |
500.00 |
500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (2'x 2')
|
16.0 |
LNFT |
360.00 |
5,760.00 |
775.00 |
12,400.00 |
|
|
|
|
| 805-12-Z |
reinforced concrete box culverts (4'x 2')
|
16.0 |
LNFT |
430.00 |
6,880.00 |
856.00 |
13,696.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
850   |
LNFT |
10.00 |
8,500.00 |
24.00 |
20,400.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,667,959.18 |
|
1,782,313.30 |
|
|
|
|
|