| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GRADY CRAWFORD CONST. CO., INC. |
- 2 - KOSTMAYER CONSTRUCTION, LLC |
- 3 - STRANCO, INC. |
- 4 - RAD-TON INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
77,800.00 |
77,800.00 |
34,000.00 |
34,000.00 |
101,000.00 |
101,000.00 |
279,800.00 |
279,800.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
16,000.00 |
16,000.00 |
25,000.00 |
25,000.00 |
| 202-02-01 |
removal of wood frame residence (sta. 165+75 lt., 30'
x 50') |
1   |
EACH |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
7,000.00 |
7,000.00 |
| 202-02-02 |
removal of metal sign (sta. 183+25 lt., 6' x 10')
|
1   |
EACH |
100.00 |
100.00 |
600.00 |
600.00 |
300.00 |
300.00 |
1,000.00 |
1,000.00 |
| 202-02-03 |
removal of metal sign (sta. 183+80 lt., 2' x 1')
|
1   |
EACH |
75.00 |
75.00 |
600.00 |
600.00 |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
| 202-02-04 |
removal of sign (sta. 183+81 lt., 6' x 5')
|
1   |
EACH |
150.00 |
150.00 |
600.00 |
600.00 |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
| 202-02-05 |
removal of metal sign (sta. 184+50 lt., 4' x 5')
|
1   |
EACH |
100.00 |
100.00 |
600.00 |
600.00 |
250.00 |
250.00 |
3,000.00 |
3,000.00 |
| 202-02-06 |
removal of commercial building (sta. 188+95 lt., 40' x
150') |
1   |
EACH |
5,500.00 |
5,500.00 |
12,000.00 |
12,000.00 |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
| 202-02-07 |
removal of wood frame residence (sta. 203+25 lt., 50'
x 30') |
1   |
EACH |
5,500.00 |
5,500.00 |
6,000.00 |
6,000.00 |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
| 202-02-08 |
removal of wood frame residence (sta. 206+00 lt., 25'
x 66') |
1   |
EACH |
5,500.00 |
5,500.00 |
6,000.00 |
6,000.00 |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
| 202-02-09 |
removal of concrete block building (sta. 207+50 lt.,
231' x 78') |
1   |
EACH |
8,800.00 |
8,800.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
| 202-02-10 |
removal of metal sign (sta. 209+00 lt., 6' x 8')
|
1   |
EACH |
100.00 |
100.00 |
600.00 |
600.00 |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
| 202-02-11 |
removal of concrete block sign (sta. 216+00 rt., 6' x
5') |
1   |
EACH |
150.00 |
150.00 |
1,200.00 |
1,200.00 |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
| 202-02-12 |
removal of metal sign (sta. 217+95 rt., 5' x 4')
|
1   |
EACH |
150.00 |
150.00 |
600.00 |
600.00 |
300.00 |
300.00 |
1,000.00 |
1,000.00 |
| 202-02-13 |
removal of concrete block building (sta. 218+86 rt.,
40' x 150') |
1   |
EACH |
6,000.00 |
6,000.00 |
8,500.00 |
8,500.00 |
1,000.00 |
1,000.00 |
15,000.00 |
15,000.00 |
| 202-02-14 |
removal of wood frame residence (sta. 220+92 rt., 26'
x 37') |
1   |
EACH |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
| 202-02-15 |
removal of concrete block sign (sta. 222+90 rt., 4' x
5') |
1   |
EACH |
125.00 |
125.00 |
600.00 |
600.00 |
300.00 |
300.00 |
2,000.00 |
2,000.00 |
| 202-02-16 |
removal of brick veneer residence (sta. 257+62 rt.,
65' x 48') |
1   |
EACH |
6,000.00 |
6,000.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
| 202-02-17 |
removal of brick veneer residence (sta. 260+00 rt.,
60' x 40') |
1   |
EACH |
7,000.00 |
7,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
7,000.00 |
7,000.00 |
| 202-02-18 |
removal of wood frame sign (sta. 45+10 lt., 2' x 4')
|
1   |
EACH |
75.00 |
75.00 |
600.00 |
600.00 |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
| 202-02-19 |
removal of concrete block sign (sta. 45+95 rt., 5' x
4') |
1   |
EACH |
120.00 |
120.00 |
600.00 |
600.00 |
200.00 |
200.00 |
1,000.00 |
1,000.00 |
| 202-02-20 |
removal of garage (sta. 52+20 rt., 30' x 40')
|
1   |
EACH |
1,170.00 |
1,170.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 204-02 |
temporary hay or straw bales
|
21   |
EACH |
10.00 |
210.00 |
10.00 |
210.00 |
20.00 |
420.00 |
15.00 |
315.00 |
| 204-06 |
temporary silt fencing
|
33,200   |
LNFT |
1.00 |
33,200.00 |
1.80 |
59,760.00 |
1.40 |
46,480.00 |
1.50 |
49,800.00 |
| 705-01 |
barbed wire fence
|
6,149   |
LNFT |
4.20 |
25,825.80 |
6.00 |
36,894.00 |
6.00 |
36,894.00 |
6.50 |
39,968.50 |
| 705-02 |
combination mesh & barbed wire fence
|
1,453   |
LNFT |
6.60 |
9,589.80 |
7.00 |
10,171.00 |
6.50 |
9,444.50 |
7.00 |
10,171.00 |
| 705-04 |
single swinging driveway gates
|
9   |
EACH |
240.00 |
2,160.00 |
505.00 |
4,545.00 |
800.50 |
7,204.50 |
1,100.00 |
9,900.00 |
| 705-05 |
double swinging driveway gates
|
7   |
DBGT |
480.00 |
3,360.00 |
960.00 |
6,720.00 |
1,200.00 |
8,400.00 |
1,350.00 |
9,450.00 |
| 705-09 |
rebuilt fence
|
790   |
LNFT |
4.36 |
3,444.40 |
13.00 |
10,270.00 |
12.00 |
9,480.00 |
13.75 |
10,862.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,400.00 |
2,400.00 |
5,000.00 |
5,000.00 |
12,000.00 |
12,000.00 |
| 717-01 |
seeding
|
1,700   |
LB |
6.61 |
11,237.00 |
8.00 |
13,600.00 |
8.00 |
13,600.00 |
12.00 |
20,400.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
24,000.00 |
24,000.00 |
8,000.00 |
8,000.00 |
22,500.00 |
22,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
21,200.00 |
21,200.00 |
12,000.00 |
12,000.00 |
19,000.00 |
19,000.00 |
23,000.00 |
23,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
258,642.00 |
|
321,670.00 |
|
354,273.00 |
|
638,667.00 |
|