Letting of 9/29/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 817-08-0026
Parish: E BATON ROUGE
Routes: LA 946
Description: JONES BAYOU - HOOPER ROAD (CLEARING AND GRUBBING)
Type Const: clearing and grubbing, and related work.
 
RankLicenseBidderAmount
107764 GRADY CRAWFORD CONST. CO., INC. $258,642.00
225747 KOSTMAYER CONSTRUCTION, LLC $321,670.00
316724 STRANCO, INC. $354,273.00
426457 RAD-TON INC. $638,667.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
GRADY CRAWFORD CONST. CO., INC.
- 2 -
KOSTMAYER CONSTRUCTION, LLC
- 3 -
STRANCO, INC.
- 4 -
RAD-TON INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 77,800.00 77,800.00 34,000.00 34,000.00 101,000.00 101,000.00 279,800.00 279,800.00
202-01 removal of structures & obstructions lump      LUMP 5,000.00 5,000.00 15,000.00 15,000.00 16,000.00 16,000.00 25,000.00 25,000.00
202-02-01 removal of wood frame residence (sta. 165+75 lt., 30'
x 50')
1      EACH 4,500.00 4,500.00 6,000.00 6,000.00 8,000.00 8,000.00 7,000.00 7,000.00
202-02-02 removal of metal sign (sta. 183+25 lt., 6' x 10') 1      EACH 100.00 100.00 600.00 600.00 300.00 300.00 1,000.00 1,000.00
202-02-03 removal of metal sign (sta. 183+80 lt., 2' x 1') 1      EACH 75.00 75.00 600.00 600.00 200.00 200.00 1,000.00 1,000.00
202-02-04 removal of sign (sta. 183+81 lt., 6' x 5') 1      EACH 150.00 150.00 600.00 600.00 200.00 200.00 1,000.00 1,000.00
202-02-05 removal of metal sign (sta. 184+50 lt., 4' x 5') 1      EACH 100.00 100.00 600.00 600.00 250.00 250.00 3,000.00 3,000.00
202-02-06 removal of commercial building (sta. 188+95 lt., 40' x
150')
1      EACH 5,500.00 5,500.00 12,000.00 12,000.00 8,000.00 8,000.00 20,000.00 20,000.00
202-02-07 removal of wood frame residence (sta. 203+25 lt., 50'
x 30')
1      EACH 5,500.00 5,500.00 6,000.00 6,000.00 2,500.00 2,500.00 8,000.00 8,000.00
202-02-08 removal of wood frame residence (sta. 206+00 lt., 25'
x 66')
1      EACH 5,500.00 5,500.00 6,000.00 6,000.00 2,500.00 2,500.00 8,000.00 8,000.00
202-02-09 removal of concrete block building (sta. 207+50 lt.,
231' x 78')
1      EACH 8,800.00 8,800.00 12,000.00 12,000.00 15,000.00 15,000.00 30,000.00 30,000.00
202-02-10 removal of metal sign (sta. 209+00 lt., 6' x 8') 1      EACH 100.00 100.00 600.00 600.00 200.00 200.00 1,000.00 1,000.00
202-02-11 removal of concrete block sign (sta. 216+00 rt., 6' x
5')
1      EACH 150.00 150.00 1,200.00 1,200.00 200.00 200.00 1,000.00 1,000.00
202-02-12 removal of metal sign (sta. 217+95 rt., 5' x 4') 1      EACH 150.00 150.00 600.00 600.00 300.00 300.00 1,000.00 1,000.00
202-02-13 removal of concrete block building (sta. 218+86 rt.,
40' x 150')
1      EACH 6,000.00 6,000.00 8,500.00 8,500.00 1,000.00 1,000.00 15,000.00 15,000.00
202-02-14 removal of wood frame residence (sta. 220+92 rt., 26'
x 37')
1      EACH 4,500.00 4,500.00 6,000.00 6,000.00 5,000.00 5,000.00 5,500.00 5,500.00
202-02-15 removal of concrete block sign (sta. 222+90 rt., 4' x
5')
1      EACH 125.00 125.00 600.00 600.00 300.00 300.00 2,000.00 2,000.00
202-02-16 removal of brick veneer residence (sta. 257+62 rt.,
65' x 48')
1      EACH 6,000.00 6,000.00 12,000.00 12,000.00 15,000.00 15,000.00 10,000.00 10,000.00
202-02-17 removal of brick veneer residence (sta. 260+00 rt.,
60' x 40')
1      EACH 7,000.00 7,000.00 12,000.00 12,000.00 12,000.00 12,000.00 7,000.00 7,000.00
202-02-18 removal of wood frame sign (sta. 45+10 lt., 2' x 4') 1      EACH 75.00 75.00 600.00 600.00 200.00 200.00 1,000.00 1,000.00
202-02-19 removal of concrete block sign (sta. 45+95 rt., 5' x
4')
1      EACH 120.00 120.00 600.00 600.00 200.00 200.00 1,000.00 1,000.00
202-02-20 removal of garage (sta. 52+20 rt., 30' x 40') 1      EACH 1,170.00 1,170.00 5,000.00 5,000.00 2,000.00 2,000.00 2,000.00 2,000.00
204-02 temporary hay or straw bales 21      EACH 10.00 210.00 10.00 210.00 20.00 420.00 15.00 315.00
204-06 temporary silt fencing 33,200      LNFT 1.00 33,200.00 1.80 59,760.00 1.40 46,480.00 1.50 49,800.00
705-01 barbed wire fence 6,149      LNFT 4.20 25,825.80 6.00 36,894.00 6.00 36,894.00 6.50 39,968.50
705-02 combination mesh & barbed wire fence 1,453      LNFT 6.60 9,589.80 7.00 10,171.00 6.50 9,444.50 7.00 10,171.00
705-04 single swinging driveway gates 9      EACH 240.00 2,160.00 505.00 4,545.00 800.50 7,204.50 1,100.00 9,900.00
705-05 double swinging driveway gates 7      DBGT 480.00 3,360.00 960.00 6,720.00 1,200.00 8,400.00 1,350.00 9,450.00
705-09 rebuilt fence 790      LNFT 4.36 3,444.40 13.00 10,270.00 12.00 9,480.00 13.75 10,862.50
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 2,400.00 2,400.00 5,000.00 5,000.00 12,000.00 12,000.00
717-01 seeding 1,700      LB 6.61 11,237.00 8.00 13,600.00 8.00 13,600.00 12.00 20,400.00
727-01 mobilization lump      LUMP 5,000.00 5,000.00 24,000.00 24,000.00 8,000.00 8,000.00 22,500.00 22,500.00
740-01 construction layout lump      LUMP 21,200.00 21,200.00 12,000.00 12,000.00 19,000.00 19,000.00 23,000.00 23,000.00
                       
 CONTRACTOR TOTAL       258,642.00   321,670.00   354,273.00   638,667.00