| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JACK B. HARPER CONTRACTOR, INC. |
- 2 - FRISCHHERTZ ELECTRIC CO., INC. |
- 3 - TOOMER ELECTRICAL CO., INC. |
- 4 - MASTEC NORTH AMERICA INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,745.00 |
1,745.00 |
1,500.00 |
1,500.00 |
19,500.00 |
19,500.00 |
1,600.00 |
1,600.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
2,850   |
SQYD |
17.25 |
49,162.50 |
8.00 |
22,800.00 |
7.35 |
20,947.50 |
8.00 |
22,800.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
790.0 |
SQYD |
3.45 |
2,725.50 |
11.00 |
8,690.00 |
10.50 |
8,295.00 |
12.00 |
9,480.00 |
| 706-01-B |
concrete walk (5" thick)
|
150.0 |
SQYD |
66.70 |
10,005.00 |
49.00 |
7,350.00 |
48.00 |
7,200.00 |
68.00 |
10,200.00 |
| 706-02 |
concrete drive (8" thick)
|
2,515.0 |
SQYD |
48.30 |
121,474.50 |
55.00 |
138,325.00 |
54.00 |
135,810.00 |
50.00 |
125,750.00 |
| 706-03-B |
incidental concrete paving (5" thick)
|
975.0 |
SQYD |
55.20 |
53,820.00 |
39.00 |
38,025.00 |
38.00 |
37,050.00 |
56.00 |
54,600.00 |
| 707-03 |
combination concrete curb & gutter
|
490.0 |
LNFT |
23.00 |
11,270.00 |
27.00 |
13,230.00 |
26.00 |
12,740.00 |
23.00 |
11,270.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
6,720.00 |
6,720.00 |
18,000.00 |
18,000.00 |
40,000.00 |
40,000.00 |
| 717-01 |
seeding
|
30   |
LB |
7.00 |
210.00 |
37.00 |
1,110.00 |
25.00 |
750.00 |
41.00 |
1,230.00 |
| 718-01 |
fertilizer
|
1,000   |
LB |
0.60 |
600.00 |
4.00 |
4,000.00 |
1.00 |
1,000.00 |
4.00 |
4,000.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
4,000.00 |
4,000.00 |
4,758.00 |
4,758.00 |
5,000.00 |
5,000.00 |
22,000.00 |
22,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,482.00 |
15,482.00 |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
| 730-01 |
trenching and backfilling
|
15,200   |
LNFT |
2.00 |
30,400.00 |
2.00 |
30,400.00 |
4.86 |
73,872.00 |
4.70 |
71,440.00 |
| 730-02-A |
conduit with conductors (2-#6)
|
9,915   |
LNFT |
3.50 |
34,702.50 |
5.00 |
49,575.00 |
4.60 |
45,609.00 |
5.00 |
49,575.00 |
| 730-02-B |
conduit with conductors (4-#6)
|
2,840   |
LNFT |
5.50 |
15,620.00 |
7.00 |
19,880.00 |
5.94 |
16,869.60 |
6.30 |
17,892.00 |
| 730-02-C |
conduit with conductors (8-#6)
|
3,200   |
LNFT |
8.60 |
27,520.00 |
9.00 |
28,800.00 |
10.00 |
32,000.00 |
9.50 |
30,400.00 |
| 730-04 |
jacked or bored casing (4" pvc sleeve 80)(including
installation of pits) |
1,320   |
LNFT |
20.40 |
26,928.00 |
22.00 |
29,040.00 |
14.00 |
18,480.00 |
30.00 |
39,600.00 |
| 730-05-A |
light pole (40'mh,10' single mast arm)
|
96   |
EACH |
2,382.00 |
228,672.00 |
2,415.00 |
231,840.00 |
3,095.00 |
297,120.00 |
3,000.00 |
288,000.00 |
| 730-05-B |
light pole (40'mh,10' double mast arm)
|
8   |
EACH |
2,825.00 |
22,600.00 |
3,076.00 |
24,608.00 |
3,585.00 |
28,680.00 |
3,700.00 |
29,600.00 |
| 730-07 |
luminaire(400w hps semi-cutoff cobra head)
|
112   |
EACH |
233.00 |
26,096.00 |
258.00 |
28,896.00 |
256.00 |
28,672.00 |
260.00 |
29,120.00 |
| 730-08 |
electrical service point(lighting control center)
|
2   |
EACH |
8,875.00 |
17,750.00 |
8,901.00 |
17,802.00 |
9,850.00 |
19,700.00 |
9,200.00 |
18,400.00 |
| 730-16 |
underground junction box
|
136   |
EACH |
1,030.00 |
140,080.00 |
1,260.00 |
171,360.00 |
1,120.00 |
152,320.00 |
1,400.00 |
190,400.00 |
| 736-09 |
loop detector
|
300   |
LNFT |
9.00 |
2,700.00 |
11.00 |
3,300.00 |
10.00 |
3,000.00 |
8.00 |
2,400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
1,771.00 |
1,771.00 |
1,606.00 |
1,606.00 |
6,400.00 |
6,400.00 |
5,300.00 |
5,300.00 |
| S-001 |
exploratory excavation
|
10   |
EACH |
715.00 |
7,150.00 |
168.00 |
1,680.00 |
750.00 |
7,500.00 |
490.00 |
4,900.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
864,502.00 |
|
900,777.00 |
|
1,056,515.10 |
|
1,129,957.00 |
|