Letting of 9/29/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-26-0047
Parish: JEFFERSON
Routes:
Description: VETERANS BLVD. (DAVID DR. TO CLEARVIEW PKWY.)
Type Const: roadway lighting and related work.
 
RankLicenseBidderAmount
127043 JACK B. HARPER CONTRACTOR, INC. $864,502.00
201185 FRISCHHERTZ ELECTRIC CO., INC. $900,777.00
301692 TOOMER ELECTRICAL CO., INC. $1,056,515.10
435541 MASTEC NORTH AMERICA INC $1,129,957.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
JACK B. HARPER CONTRACTOR, INC.
- 2 -
FRISCHHERTZ ELECTRIC CO., INC.
- 3 -
TOOMER ELECTRICAL CO., INC.
- 4 -
MASTEC NORTH AMERICA INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,745.00 1,745.00 1,500.00 1,500.00 19,500.00 19,500.00 1,600.00 1,600.00
202-02-C removal of portland cement concrete pavement 2,850      SQYD 17.25 49,162.50 8.00 22,800.00 7.35 20,947.50 8.00 22,800.00
202-02-G removal of surfacing & stabilized base 790.0    SQYD 3.45 2,725.50 11.00 8,690.00 10.50 8,295.00 12.00 9,480.00
706-01-B concrete walk (5" thick) 150.0    SQYD 66.70 10,005.00 49.00 7,350.00 48.00 7,200.00 68.00 10,200.00
706-02 concrete drive (8" thick) 2,515.0    SQYD 48.30 121,474.50 55.00 138,325.00 54.00 135,810.00 50.00 125,750.00
706-03-B incidental concrete paving (5" thick) 975.0    SQYD 55.20 53,820.00 39.00 38,025.00 38.00 37,050.00 56.00 54,600.00
707-03 combination concrete curb & gutter 490.0    LNFT 23.00 11,270.00 27.00 13,230.00 26.00 12,740.00 23.00 11,270.00
713-01 temporary signs & barricades lump      LUMP 7,500.00 7,500.00 6,720.00 6,720.00 18,000.00 18,000.00 40,000.00 40,000.00
717-01 seeding 30      LB 7.00 210.00 37.00 1,110.00 25.00 750.00 41.00 1,230.00
718-01 fertilizer 1,000      LB 0.60 600.00 4.00 4,000.00 1.00 1,000.00 4.00 4,000.00
722-01 project site laboratory 1      EACH 4,000.00 4,000.00 4,758.00 4,758.00 5,000.00 5,000.00 22,000.00 22,000.00
727-01 mobilization lump      LUMP 20,000.00 20,000.00 15,482.00 15,482.00 60,000.00 60,000.00 50,000.00 50,000.00
730-01 trenching and backfilling 15,200      LNFT 2.00 30,400.00 2.00 30,400.00 4.86 73,872.00 4.70 71,440.00
730-02-A conduit with conductors (2-#6) 9,915      LNFT 3.50 34,702.50 5.00 49,575.00 4.60 45,609.00 5.00 49,575.00
730-02-B conduit with conductors (4-#6) 2,840      LNFT 5.50 15,620.00 7.00 19,880.00 5.94 16,869.60 6.30 17,892.00
730-02-C conduit with conductors (8-#6) 3,200      LNFT 8.60 27,520.00 9.00 28,800.00 10.00 32,000.00 9.50 30,400.00
730-04 jacked or bored casing (4" pvc sleeve 80)(including
installation of pits)
1,320      LNFT 20.40 26,928.00 22.00 29,040.00 14.00 18,480.00 30.00 39,600.00
730-05-A light pole (40'mh,10' single mast arm) 96      EACH 2,382.00 228,672.00 2,415.00 231,840.00 3,095.00 297,120.00 3,000.00 288,000.00
730-05-B light pole (40'mh,10' double mast arm) 8      EACH 2,825.00 22,600.00 3,076.00 24,608.00 3,585.00 28,680.00 3,700.00 29,600.00
730-07 luminaire(400w hps semi-cutoff cobra head) 112      EACH 233.00 26,096.00 258.00 28,896.00 256.00 28,672.00 260.00 29,120.00
730-08 electrical service point(lighting control center) 2      EACH 8,875.00 17,750.00 8,901.00 17,802.00 9,850.00 19,700.00 9,200.00 18,400.00
730-16 underground junction box 136      EACH 1,030.00 140,080.00 1,260.00 171,360.00 1,120.00 152,320.00 1,400.00 190,400.00
736-09 loop detector 300      LNFT 9.00 2,700.00 11.00 3,300.00 10.00 3,000.00 8.00 2,400.00
740-01 construction layout lump      LUMP 1,771.00 1,771.00 1,606.00 1,606.00 6,400.00 6,400.00 5,300.00 5,300.00
S-001 exploratory excavation 10      EACH 715.00 7,150.00 168.00 1,680.00 750.00 7,500.00 490.00 4,900.00
                       
 CONTRACTOR TOTAL       864,502.00   900,777.00   1,056,515.10   1,129,957.00