February 06, 2014 Error processing SSI file

Letting of 9/29/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 737-92-0040
Parish: JEFFERSON, LAFOURCHE, ORLEANS, ST CHARLES
Routes: LA 3127, LA 3139, LA 3152, LA 3154
Description: DISTRICT 02 GUARD RAIL REPLACEMENT
Type Const: grading, superpave asphaltic concrete overlay, guard rail replacement, and related
work.
 
RankLicenseBidderAmount
100164 TRAFFIC SOLUTIONS INC $675,126.45
223811 UNITED RENTALS HWY TECHNOLOGIES INC $681,365.22
 
Item Number Item Description Quantity Unit of Measure - 1 -
TRAFFIC SOLUTIONS INC
- 2 -
UNITED RENTALS HWY TECHNOLOGIES INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 6,105      LNFT 12.50 76,312.50 4.50 27,472.50        
203-08 borrow (vehicular measurement) 1,000      CUYD 47.25 47,250.00 46.00 46,000.00        
502-01 superpave asphaltic concrete 2,155.6    TON 115.75 249,510.70 115.00 247,894.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 700.0    LNFT 27.00 18,900.00 32.00 22,400.00        
704-03 blocked out guard rail 3,806.3    LNFT 16.50 62,803.95 17.75 67,561.82        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
12.5    LNFT 65.00 812.50 65.00 812.50        
704-07-A guard rail bridge attachments (single thrie beam) 300.0    LNFT 41.00 12,300.00 31.00 9,300.00        
704-08-B guard rail transitions (double thrie beam) 993.8    LNFT 36.00 35,776.80 38.00 37,764.40        
704-10 guard rail anchor block 14      EACH 1,250.00 17,500.00 1,150.00 16,100.00        
704-11-A guard rail end treatment (flared) 42      EACH 1,700.00 71,400.00 1,800.00 75,600.00        
704-11-B guard rail end treatment (tangent) 3      EACH 2,900.00 8,700.00 2,200.00 6,600.00        
713-01 temporary signs & barricades lump      LUMP 11,000.00 11,000.00 25,000.00 25,000.00        
727-01 mobilization lump      LUMP 28,000.00 28,000.00 65,000.00 65,000.00        
729-16-C object marker assembly (type 3) 44      EACH 65.00 2,860.00 65.00 2,860.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00        
S-001 variable message sign unit 2      EACH 6,000.00 12,000.00 3,000.00 6,000.00        
                       
 CONTRACTOR TOTAL       675,126.45   681,365.22        