| Lead Project: 737-92-0040 |
| Parish: JEFFERSON, LAFOURCHE, ORLEANS, ST CHARLES |
| Routes: LA 3127, LA 3139, LA 3152, LA 3154 |
| Description: DISTRICT 02 GUARD RAIL REPLACEMENT |
Type Const:
grading, superpave asphaltic concrete overlay, guard rail replacement, and related
work. |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - TRAFFIC SOLUTIONS INC |
- 2 - UNITED RENTALS HWY TECHNOLOGIES INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
6,105   |
LNFT |
12.50 |
76,312.50 |
4.50 |
27,472.50 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,000   |
CUYD |
47.25 |
47,250.00 |
46.00 |
46,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,155.6 |
TON |
115.75 |
249,510.70 |
115.00 |
247,894.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
700.0 |
LNFT |
27.00 |
18,900.00 |
32.00 |
22,400.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
3,806.3 |
LNFT |
16.50 |
62,803.95 |
17.75 |
67,561.82 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.5 |
LNFT |
65.00 |
812.50 |
65.00 |
812.50 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
300.0 |
LNFT |
41.00 |
12,300.00 |
31.00 |
9,300.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
993.8 |
LNFT |
36.00 |
35,776.80 |
38.00 |
37,764.40 |
|
|
|
|
| 704-10 |
guard rail anchor block
|
14   |
EACH |
1,250.00 |
17,500.00 |
1,150.00 |
16,100.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
42   |
EACH |
1,700.00 |
71,400.00 |
1,800.00 |
75,600.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
3   |
EACH |
2,900.00 |
8,700.00 |
2,200.00 |
6,600.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
28,000.00 |
28,000.00 |
65,000.00 |
65,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
44   |
EACH |
65.00 |
2,860.00 |
65.00 |
2,860.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-001 |
variable message sign unit
|
2   |
EACH |
6,000.00 |
12,000.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
675,126.45 |
|
681,365.22 |
|
|
|
|
|