| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - F. MILLER & SONS, LLC |
- 4 - KOSTMAYER CONSTRUCTION, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
15,000.00 |
15,000.00 |
14,000.00 |
14,000.00 |
29,300.00 |
29,300.00 |
17,000.00 |
17,000.00 |
| 202-02-A-01 |
removal of bridge(sta.10+220,7.00 x 39.06m timber &
concrete bridge) |
1   |
ea |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
26,000.00 |
26,000.00 |
13,000.00 |
13,000.00 |
| 202-02-A-02 |
removal of bridge(sta.20+210,7.53 x 17.40m timber &
concrete bridge) |
1   |
ea |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
11,500.00 |
11,500.00 |
6,500.00 |
6,500.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
581.0 |
sq m |
5.00 |
2,905.00 |
4.00 |
2,324.00 |
5.75 |
3,340.75 |
5.00 |
2,905.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
45,000.00 |
45,000.00 |
45,000.00 |
45,000.00 |
92,000.00 |
92,000.00 |
54,000.00 |
54,000.00 |
| 204-02 |
temporary hay or straw bales
|
75   |
ea |
5.00 |
375.00 |
10.00 |
750.00 |
15.00 |
1,125.00 |
10.00 |
750.00 |
| 204-03 |
temporary slope drains
|
89   |
ln m |
25.00 |
2,225.00 |
10.00 |
890.00 |
28.00 |
2,492.00 |
30.00 |
2,670.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
ea |
250.00 |
2,000.00 |
100.00 |
800.00 |
110.00 |
880.00 |
100.00 |
800.00 |
| 204-06 |
temporary silt fencing
|
890   |
ln m |
7.00 |
6,230.00 |
4.00 |
3,560.00 |
5.00 |
4,450.00 |
6.00 |
5,340.00 |
| 302-01-A |
class ii base course (stone)
|
163.6 |
cu m |
98.00 |
16,032.80 |
85.00 |
13,906.00 |
55.00 |
8,998.00 |
80.00 |
13,088.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
4   |
cu m |
250.00 |
1,000.00 |
100.00 |
400.00 |
55.00 |
220.00 |
100.00 |
400.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
115.0 |
cu m |
45.00 |
5,175.00 |
85.00 |
9,775.00 |
55.00 |
6,325.00 |
80.00 |
9,200.00 |
| 502-01 |
superpave asphaltic concrete
|
150.4 |
Mg |
155.00 |
23,312.00 |
100.00 |
15,040.00 |
150.00 |
22,560.00 |
170.00 |
25,568.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
144.00 |
8,778.24 |
150.00 |
9,144.00 |
144.00 |
8,778.24 |
175.00 |
10,668.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
86.00 |
2,621.28 |
95.00 |
2,895.60 |
86.00 |
2,621.28 |
155.00 |
4,724.40 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
1,750.00 |
7,000.00 |
2,000.00 |
8,000.00 |
1,800.00 |
7,200.00 |
2,400.00 |
9,600.00 |
| 705-01 |
barbed wire fence
|
63   |
ln m |
32.00 |
2,016.00 |
25.00 |
1,575.00 |
18.00 |
1,134.00 |
30.00 |
1,890.00 |
| 711-01-D |
riprap (25 kg, 460mm thick)
|
1,357   |
sq m |
38.00 |
51,566.00 |
45.00 |
61,065.00 |
41.00 |
55,637.00 |
55.00 |
74,635.00 |
| 711-04 |
geotextile fabric
|
1,357   |
sq m |
2.80 |
3,799.60 |
5.00 |
6,785.00 |
2.20 |
2,985.40 |
4.00 |
5,428.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
27,000.00 |
27,000.00 |
12,000.00 |
12,000.00 |
46,000.00 |
46,000.00 |
15,100.00 |
15,100.00 |
| 727-01 |
mobilization
|
lump |
lump |
15,000.00 |
15,000.00 |
45,000.00 |
45,000.00 |
70,000.00 |
70,000.00 |
65,000.00 |
65,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
ea |
70.00 |
840.00 |
80.00 |
960.00 |
70.00 |
840.00 |
80.00 |
960.00 |
| 740-01 |
construction layout
|
lump |
lump |
6,500.00 |
6,500.00 |
15,000.00 |
15,000.00 |
26,400.00 |
26,400.00 |
14,000.00 |
14,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
390.0 |
ln m |
110.00 |
42,900.00 |
110.00 |
42,900.00 |
96.00 |
37,440.00 |
148.00 |
57,720.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
675.0 |
ln m |
125.00 |
84,375.00 |
165.00 |
111,375.00 |
104.00 |
70,200.00 |
234.00 |
157,950.00 |
| 804-12 |
loading permanent piles
|
2   |
ea |
1.00 |
2.00 |
1.00 |
2.00 |
100.00 |
200.00 |
1.00 |
2.00 |
| 805-10-A |
bridge superstructure & substructure (7.3 m clr. rdwy;
90 degree crossing) (cip bents) |
9   |
span |
19,000.00 |
171,000.00 |
19,500.00 |
175,500.00 |
12,600.00 |
113,400.00 |
19,000.00 |
171,000.00 |
| 805-10-B |
bridge superstructure & substructure (8.5 m clr. rdwy;
90 degree crossing) (curved)(cip) |
4   |
span |
20,000.00 |
80,000.00 |
20,000.00 |
80,000.00 |
20,500.00 |
82,000.00 |
20,000.00 |
80,000.00 |
| S-101 |
concrete approach slabs (8.5m clr. rdwy; 90 degree
crossing; curved) |
1   |
ea |
7,500.00 |
7,500.00 |
6,500.00 |
6,500.00 |
8,400.00 |
8,400.00 |
7,000.00 |
7,000.00 |
| S-102 |
concrete approach slabs (8.5 m clr. rdwy; 90 degree
crossing) |
1   |
ea |
7,500.00 |
7,500.00 |
6,500.00 |
6,500.00 |
8,400.00 |
8,400.00 |
7,000.00 |
7,000.00 |
| S-103 |
concrete approach slabs (7.3m clr. rdwy; 90 degree
crossing) |
2   |
ea |
7,000.00 |
14,000.00 |
6,000.00 |
12,000.00 |
6,200.00 |
12,400.00 |
7,000.00 |
14,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
668,652.92 |
|
721,646.60 |
|
763,226.67 |
|
847,898.40 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.10+220,7.00 x 39.06m timber &
concrete bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-A-02 |
removal of bridge(sta.20+210,7.53 x 17.40m timber &
concrete bridge) |
1   |
ea |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
581.0 |
sq m |
6.00 |
3,486.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
75   |
ea |
20.00 |
1,500.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
89   |
ln m |
40.00 |
3,560.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
ea |
300.00 |
2,400.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
890   |
ln m |
7.00 |
6,230.00 |
|
|
|
|
|
|
| 302-01-A |
class ii base course (stone)
|
163.6 |
cu m |
85.00 |
13,906.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
4   |
cu m |
120.00 |
480.00 |
|
|
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
115.0 |
cu m |
50.00 |
5,750.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
150.4 |
Mg |
120.00 |
18,048.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
165.00 |
10,058.40 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
100.00 |
3,048.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,000.00 |
8,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
63   |
ln m |
20.00 |
1,260.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (25 kg, 460mm thick)
|
1,357   |
sq m |
40.00 |
54,280.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,357   |
sq m |
3.50 |
4,749.50 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
ea |
80.00 |
960.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
24,000.00 |
24,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
390.0 |
ln m |
112.00 |
43,680.00 |
|
|
|
|
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
675.0 |
ln m |
150.00 |
101,250.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
100.00 |
200.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (7.3 m clr. rdwy;
90 degree crossing) (cip bents) |
9   |
span |
21,000.00 |
189,000.00 |
|
|
|
|
|
|
| 805-10-B |
bridge superstructure & substructure (8.5 m clr. rdwy;
90 degree crossing) (curved)(cip) |
4   |
span |
24,000.00 |
96,000.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs (8.5m clr. rdwy; 90 degree
crossing; curved) |
1   |
ea |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| S-102 |
concrete approach slabs (8.5 m clr. rdwy; 90 degree
crossing) |
1   |
ea |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| S-103 |
concrete approach slabs (7.3m clr. rdwy; 90 degree
crossing) |
2   |
ea |
7,500.00 |
15,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
891,345.90 |
|
|
|
|
|
|
|