Lead Project: 713-40-0107
Parish: RAPIDES
Routes:
Description: COTTON ISLAND ROAD AND UPPER DONAHUE FERRY BRIDGES
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, concrete
slab span bridges and related work
 
RankLicenseBidderAmount
108815 W. E. MCDONALD & SON, LLC. $668,652.92
209090 GUINN BROTHERS, LLC. $721,646.60
300060 F. MILLER & SONS, LLC $763,226.67
425747 KOSTMAYER CONSTRUCTION, LLC $847,898.40
512312 GILCHRIST CONSTRUCTION CO. LLC $891,345.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
GUINN BROTHERS, LLC.
- 3 -
F. MILLER & SONS, LLC
- 4 -
KOSTMAYER CONSTRUCTION, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 15,000.00 15,000.00 14,000.00 14,000.00 29,300.00 29,300.00 17,000.00 17,000.00
202-02-A-01 removal of bridge(sta.10+220,7.00 x 39.06m timber &
concrete bridge)
1      ea 12,000.00 12,000.00 12,000.00 12,000.00 26,000.00 26,000.00 13,000.00 13,000.00
202-02-A-02 removal of bridge(sta.20+210,7.53 x 17.40m timber &
concrete bridge)
1      ea 5,000.00 5,000.00 6,000.00 6,000.00 11,500.00 11,500.00 6,500.00 6,500.00
202-02-G removal of surfacing & stabilized base 581.0    sq m 5.00 2,905.00 4.00 2,324.00 5.75 3,340.75 5.00 2,905.00
203-06 excavation & embankment lump      lump 45,000.00 45,000.00 45,000.00 45,000.00 92,000.00 92,000.00 54,000.00 54,000.00
204-02 temporary hay or straw bales 75      ea 5.00 375.00 10.00 750.00 15.00 1,125.00 10.00 750.00
204-03 temporary slope drains 89      ln m 25.00 2,225.00 10.00 890.00 28.00 2,492.00 30.00 2,670.00
204-05-A temporary sediment check dams (hay) 8      ea 250.00 2,000.00 100.00 800.00 110.00 880.00 100.00 800.00
204-06 temporary silt fencing 890      ln m 7.00 6,230.00 4.00 3,560.00 5.00 4,450.00 6.00 5,340.00
302-01-A class ii base course (stone) 163.6    cu m 98.00 16,032.80 85.00 13,906.00 55.00 8,998.00 80.00 13,088.00
401-02 aggregate surface course (adjusted vehicular
measurement)
4      cu m 250.00 1,000.00 100.00 400.00 55.00 220.00 100.00 400.00
403-01 aggregate roadway surfacing (vehicular measurement) 115.0    cu m 45.00 5,175.00 85.00 9,775.00 55.00 6,325.00 80.00 9,200.00
502-01 superpave asphaltic concrete 150.4    Mg 155.00 23,312.00 100.00 15,040.00 150.00 22,560.00 170.00 25,568.00
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 144.00 8,778.24 150.00 9,144.00 144.00 8,778.24 175.00 10,668.00
704-09 guard rail anchor sections (turndown) 30.48   ln m 86.00 2,621.28 95.00 2,895.60 86.00 2,621.28 155.00 4,724.40
704-11-A guard rail end treatment (flared) 4      ea 1,750.00 7,000.00 2,000.00 8,000.00 1,800.00 7,200.00 2,400.00 9,600.00
705-01 barbed wire fence 63      ln m 32.00 2,016.00 25.00 1,575.00 18.00 1,134.00 30.00 1,890.00
711-01-D riprap (25 kg, 460mm thick) 1,357      sq m 38.00 51,566.00 45.00 61,065.00 41.00 55,637.00 55.00 74,635.00
711-04 geotextile fabric 1,357      sq m 2.80 3,799.60 5.00 6,785.00 2.20 2,985.40 4.00 5,428.00
713-01 temporary signs & barricades lump      lump 27,000.00 27,000.00 12,000.00 12,000.00 46,000.00 46,000.00 15,100.00 15,100.00
727-01 mobilization lump      lump 15,000.00 15,000.00 45,000.00 45,000.00 70,000.00 70,000.00 65,000.00 65,000.00
729-16-C object marker assembly (type 3) 12      ea 70.00 840.00 80.00 960.00 70.00 840.00 80.00 960.00
740-01 construction layout lump      lump 6,500.00 6,500.00 15,000.00 15,000.00 26,400.00 26,400.00 14,000.00 14,000.00
804-01-B precast concrete piles (350 mm) 390.0    ln m 110.00 42,900.00 110.00 42,900.00 96.00 37,440.00 148.00 57,720.00
804-01-C precast concrete piles (400 mm) 675.0    ln m 125.00 84,375.00 165.00 111,375.00 104.00 70,200.00 234.00 157,950.00
804-12 loading permanent piles 2      ea 1.00 2.00 1.00 2.00 100.00 200.00 1.00 2.00
805-10-A bridge superstructure & substructure (7.3 m clr. rdwy;
90 degree crossing) (cip bents)
9      span 19,000.00 171,000.00 19,500.00 175,500.00 12,600.00 113,400.00 19,000.00 171,000.00
805-10-B bridge superstructure & substructure (8.5 m clr. rdwy;
90 degree crossing) (curved)(cip)
4      span 20,000.00 80,000.00 20,000.00 80,000.00 20,500.00 82,000.00 20,000.00 80,000.00
S-101 concrete approach slabs (8.5m clr. rdwy; 90 degree
crossing; curved)
1      ea 7,500.00 7,500.00 6,500.00 6,500.00 8,400.00 8,400.00 7,000.00 7,000.00
S-102 concrete approach slabs (8.5 m clr. rdwy; 90 degree
crossing)
1      ea 7,500.00 7,500.00 6,500.00 6,500.00 8,400.00 8,400.00 7,000.00 7,000.00
S-103 concrete approach slabs (7.3m clr. rdwy; 90 degree
crossing)
2      ea 7,000.00 14,000.00 6,000.00 12,000.00 6,200.00 12,400.00 7,000.00 14,000.00
                       
 CONTRACTOR TOTAL       668,652.92   721,646.60   763,226.67   847,898.40
 
Item Number Item Description Quantity Unit of Measure - 5 -
GILCHRIST CONSTRUCTION CO. LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 80,000.00 80,000.00            
202-02-A-01 removal of bridge(sta.10+220,7.00 x 39.06m timber &
concrete bridge)
1      ea 10,000.00 10,000.00            
202-02-A-02 removal of bridge(sta.20+210,7.53 x 17.40m timber &
concrete bridge)
1      ea 4,500.00 4,500.00            
202-02-G removal of surfacing & stabilized base 581.0    sq m 6.00 3,486.00            
203-06 excavation & embankment lump      lump 80,000.00 80,000.00            
204-02 temporary hay or straw bales 75      ea 20.00 1,500.00            
204-03 temporary slope drains 89      ln m 40.00 3,560.00            
204-05-A temporary sediment check dams (hay) 8      ea 300.00 2,400.00            
204-06 temporary silt fencing 890      ln m 7.00 6,230.00            
302-01-A class ii base course (stone) 163.6    cu m 85.00 13,906.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
4      cu m 120.00 480.00            
403-01 aggregate roadway surfacing (vehicular measurement) 115.0    cu m 50.00 5,750.00            
502-01 superpave asphaltic concrete 150.4    Mg 120.00 18,048.00            
704-08-B guard rail transitions (double thrie beam) 60.96   ln m 165.00 10,058.40            
704-09 guard rail anchor sections (turndown) 30.48   ln m 100.00 3,048.00            
704-11-A guard rail end treatment (flared) 4      ea 2,000.00 8,000.00            
705-01 barbed wire fence 63      ln m 20.00 1,260.00            
711-01-D riprap (25 kg, 460mm thick) 1,357      sq m 40.00 54,280.00            
711-04 geotextile fabric 1,357      sq m 3.50 4,749.50            
713-01 temporary signs & barricades lump      lump 15,000.00 15,000.00            
727-01 mobilization lump      lump 80,000.00 80,000.00            
729-16-C object marker assembly (type 3) 12      ea 80.00 960.00            
740-01 construction layout lump      lump 24,000.00 24,000.00            
804-01-B precast concrete piles (350 mm) 390.0    ln m 112.00 43,680.00            
804-01-C precast concrete piles (400 mm) 675.0    ln m 150.00 101,250.00            
804-12 loading permanent piles 2      ea 100.00 200.00            
805-10-A bridge superstructure & substructure (7.3 m clr. rdwy;
90 degree crossing) (cip bents)
9      span 21,000.00 189,000.00            
805-10-B bridge superstructure & substructure (8.5 m clr. rdwy;
90 degree crossing) (curved)(cip)
4      span 24,000.00 96,000.00            
S-101 concrete approach slabs (8.5m clr. rdwy; 90 degree
crossing; curved)
1      ea 7,500.00 7,500.00            
S-102 concrete approach slabs (8.5 m clr. rdwy; 90 degree
crossing)
1      ea 7,500.00 7,500.00            
S-103 concrete approach slabs (7.3m clr. rdwy; 90 degree
crossing)
2      ea 7,500.00 15,000.00            
                       
 CONTRACTOR TOTAL       891,345.90            