| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - LINCOLN CONCRETE, INC. |
- 3 - LOUISIANA BRIDGE, INC. |
- 4 - D'ARBONNE CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
2,500.00 |
2,500.00 |
7,000.00 |
7,000.00 |
5,000.00 |
5,000.00 |
18,500.00 |
18,500.00 |
| 202-02-A-01 |
removal of bridge (sta. 105+00, 23 ft x 57.2 ft timber
bridge with metal railings and timber piles) |
1   |
EACH |
5,000.00 |
5,000.00 |
12,500.00 |
12,500.00 |
4,000.00 |
4,000.00 |
3,000.00 |
3,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
87   |
SQYD |
5.00 |
435.00 |
5.00 |
435.00 |
15.00 |
1,305.00 |
11.00 |
957.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
12,000.00 |
12,000.00 |
26,146.00 |
26,146.00 |
| 204-02 |
temporary hay or straw bales
|
9   |
EACH |
FREE |
FREE |
10.00 |
90.00 |
11.50 |
103.50 |
100.00 |
900.00 |
| 204-03 |
temporary slope drains
|
100   |
LNFT |
FREE |
FREE |
10.00 |
1,000.00 |
28.50 |
2,850.00 |
20.00 |
2,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
FREE |
FREE |
80.00 |
320.00 |
74.00 |
296.00 |
65.00 |
260.00 |
| 204-06 |
temporary silt fencing
|
1,010   |
LNFT |
FREE |
FREE |
1.00 |
1,010.00 |
1.50 |
1,515.00 |
1.50 |
1,515.00 |
| 302-01 |
class ii base course
|
338.5 |
CUYD |
60.00 |
20,310.00 |
58.00 |
19,633.00 |
85.00 |
28,772.50 |
83.72 |
28,339.22 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
34   |
CUYD |
60.00 |
2,040.00 |
40.00 |
1,360.00 |
100.00 |
3,400.00 |
64.40 |
2,189.60 |
| 502-01 |
superpave asphaltic concrete
|
277.6 |
TON |
110.00 |
30,536.00 |
120.00 |
33,312.00 |
162.50 |
45,110.00 |
97.50 |
27,066.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
30   |
LNFT |
36.00 |
1,080.00 |
60.00 |
1,800.00 |
88.00 |
2,640.00 |
76.00 |
2,280.00 |
| 704-03 |
blocked out guard rail
|
37.5 |
LNFT |
20.00 |
750.00 |
25.00 |
937.50 |
19.50 |
731.25 |
33.66 |
1,262.25 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
45.00 |
3,375.00 |
65.00 |
4,875.00 |
57.00 |
4,275.00 |
44.47 |
3,335.25 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
2,200.00 |
8,800.00 |
2,156.50 |
8,626.00 |
2,145.00 |
8,580.00 |
| 706-02-C |
concrete drive (6" thick)
|
90.3 |
SQYD |
35.00 |
3,160.50 |
35.00 |
3,160.50 |
44.50 |
4,018.35 |
30.00 |
2,709.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
364   |
SQYD |
44.00 |
16,016.00 |
50.00 |
18,200.00 |
56.75 |
20,657.00 |
39.00 |
14,196.00 |
| 711-04 |
geotextile fabric
|
364   |
SQYD |
2.00 |
728.00 |
1.50 |
546.00 |
3.00 |
1,092.00 |
3.22 |
1,172.08 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,250.00 |
3,250.00 |
16,000.00 |
16,000.00 |
5,000.00 |
5,000.00 |
9,445.00 |
9,445.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
24,000.00 |
24,000.00 |
26,000.00 |
26,000.00 |
10,000.00 |
10,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
65.00 |
260.00 |
95.00 |
380.00 |
79.50 |
318.00 |
110.00 |
440.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
3,500.00 |
3,500.00 |
10,000.00 |
10,000.00 |
| 804-01-B |
precast concrete piles (14")
|
528   |
LNFT |
46.00 |
24,288.00 |
42.00 |
22,176.00 |
42.75 |
22,572.00 |
85.00 |
44,880.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
FREE |
FREE |
FREE |
FREE |
1.00 |
1.00 |
1.00 |
1.00 |
| 805-10-A |
bridge superstructure & substructure (90 degree
crossing, 28' roadway, c.i.p.) |
3   |
SPAN |
22,000.00 |
66,000.00 |
23,000.00 |
69,000.00 |
19,500.00 |
58,500.00 |
18,000.00 |
54,000.00 |
| S-001 |
vibration monitoring
|
lump |
LUMP |
5,000.00 |
5,000.00 |
2,500.00 |
2,500.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
| S-101 |
concrete approach slabs (90 degree crossing, 28'
roadway) (w/out asphalt) |
2   |
EACH |
7,000.00 |
14,000.00 |
4,700.00 |
9,400.00 |
7,950.00 |
15,900.00 |
5,543.00 |
11,086.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
234,228.50 |
|
268,435.00 |
|
282,182.60 |
|
289,259.40 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - C,W & W CONTRACTORS, INC. |
- 6 - GUINN BROTHERS, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 105+00, 23 ft x 57.2 ft timber
bridge with metal railings and timber piles) |
1   |
EACH |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
87   |
SQYD |
10.00 |
870.00 |
20.00 |
1,740.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
9   |
EACH |
20.00 |
180.00 |
1.00 |
9.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
100   |
LNFT |
1.00 |
100.00 |
1.00 |
100.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
150.00 |
600.00 |
1.00 |
4.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,010   |
LNFT |
0.90 |
909.00 |
1.50 |
1,515.00 |
|
|
|
|
| 302-01 |
class ii base course
|
338.5 |
CUYD |
60.00 |
20,310.00 |
85.00 |
28,772.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
34   |
CUYD |
60.00 |
2,040.00 |
100.00 |
3,400.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
277.6 |
TON |
150.00 |
41,640.00 |
140.00 |
38,864.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion)
|
30   |
LNFT |
50.00 |
1,500.00 |
75.00 |
2,250.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
37.5 |
LNFT |
30.00 |
1,125.00 |
25.00 |
937.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
50.00 |
3,750.00 |
65.00 |
4,875.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,800.00 |
7,200.00 |
2,400.00 |
9,600.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
90.3 |
SQYD |
75.00 |
6,772.50 |
50.00 |
4,515.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
364   |
SQYD |
50.00 |
18,200.00 |
50.00 |
18,200.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
364   |
SQYD |
3.00 |
1,092.00 |
5.00 |
1,820.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
90.00 |
360.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
528   |
LNFT |
60.00 |
31,680.00 |
42.00 |
22,176.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
1.00 |
1.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (90 degree
crossing, 28' roadway, c.i.p.) |
3   |
SPAN |
25,000.00 |
75,000.00 |
20,000.00 |
60,000.00 |
|
|
|
|
| S-001 |
vibration monitoring
|
lump |
LUMP |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs (90 degree crossing, 28'
roadway) (w/out asphalt) |
2   |
EACH |
6,000.00 |
12,000.00 |
6,500.00 |
13,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
292,388.50 |
|
296,639.00 |
|
|
|
|
|