| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BEN ALLEN, INC. |
- 2 - W. E. MCDONALD & SON, LLC. |
- 3 - KOSTMAYER CONSTRUCTION, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
2,500.00 |
2,500.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
|
|
| 202-02-A-01 |
removal of bridge (sta.10+00; 30' long x 22' wide;
timber bridge) |
1   |
EACH |
10,000.00 |
10,000.00 |
3,500.00 |
3,500.00 |
6,500.00 |
6,500.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
273.3 |
SQYD |
2.00 |
546.60 |
3.00 |
819.90 |
5.00 |
1,366.50 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
11,000.00 |
11,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
4   |
EACH |
FREE |
FREE |
250.00 |
1,000.00 |
11.00 |
44.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
FREE |
FREE |
250.00 |
1,000.00 |
100.00 |
400.00 |
|
|
| 204-06 |
temporary silt fencing
|
370   |
LNFT |
FREE |
FREE |
8.00 |
2,960.00 |
1.50 |
555.00 |
|
|
| 302-01 |
class ii base course
|
89.9 |
CUYD |
65.00 |
5,843.50 |
115.00 |
10,338.50 |
75.00 |
6,742.50 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
10   |
CUYD |
70.00 |
700.00 |
100.00 |
1,000.00 |
90.00 |
900.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
72.4 |
TON |
150.00 |
10,860.00 |
160.00 |
11,584.00 |
170.00 |
12,308.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
150.0 |
LNFT |
35.00 |
5,250.00 |
50.00 |
7,500.00 |
54.00 |
8,100.00 |
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
27.50 |
2,750.00 |
42.00 |
4,200.00 |
|
|
| 712-02 |
sacked concrete revetment
|
177   |
SQYD |
50.00 |
8,850.00 |
75.00 |
13,275.00 |
75.00 |
13,275.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
8,500.00 |
8,500.00 |
7,800.00 |
7,800.00 |
|
|
| 726-01 |
bedding material
|
57.6 |
CUYD |
70.00 |
4,032.00 |
60.00 |
3,456.00 |
60.00 |
3,456.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
7,000.00 |
7,000.00 |
8,500.00 |
8,500.00 |
26,000.00 |
26,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
65.00 |
520.00 |
70.00 |
560.00 |
80.00 |
640.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
2,500.00 |
2,500.00 |
3,500.00 |
3,500.00 |
4,800.00 |
4,800.00 |
|
|
| 805-12-X |
reinforced concrete box culverts (10' x 10')
|
116.0 |
LNFT |
982.00 |
113,912.00 |
850.00 |
98,600.00 |
900.00 |
104,400.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
193,014.10 |
|
198,843.40 |
|
224,487.00 |
|
|
|