| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T.L. CONSTRUCTION INC |
- 2 - C,W & W CONTRACTORS, INC. |
- 3 - W. E. MCDONALD & SON, LLC. |
- 4 - KOSTMAYER CONSTRUCTION, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
4,500.00 |
4,500.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
| 202-02-A-01 |
removal of bridge (sta.1+155.000; 5.970m wide x 6.563m
long timber structure) |
1   |
ea |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
6,000.00 |
6,000.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
14,000.00 |
14,000.00 |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
8,800.00 |
8,800.00 |
| 204-02 |
temporary hay or straw bales
|
6   |
ea |
15.00 |
90.00 |
20.00 |
120.00 |
10.00 |
60.00 |
11.00 |
66.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
ea |
260.00 |
520.00 |
150.00 |
300.00 |
1.00 |
2.00 |
120.00 |
240.00 |
| 204-06 |
temporary silt fencing
|
74   |
ln m |
15.00 |
1,110.00 |
5.00 |
370.00 |
10.00 |
740.00 |
5.00 |
370.00 |
| 302-01-A |
class ii base course (stone)
|
33.1 |
cu m |
205.00 |
6,785.50 |
100.00 |
3,310.00 |
150.00 |
4,965.00 |
80.00 |
2,648.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5   |
cu m |
265.00 |
1,325.00 |
100.00 |
500.00 |
250.00 |
1,250.00 |
90.00 |
450.00 |
| 502-01 |
superpave asphaltic concrete
|
37.3 |
Mg |
330.00 |
12,309.00 |
200.00 |
7,460.00 |
170.00 |
6,341.00 |
180.00 |
6,714.00 |
| 701-05-I |
side drain pipe (600 mm)
|
21.0 |
ln m |
190.00 |
3,990.00 |
300.00 |
6,300.00 |
150.00 |
3,150.00 |
130.00 |
2,730.00 |
| 712-04 |
flexible revetment
|
27   |
sq m |
65.00 |
1,755.00 |
100.00 |
2,700.00 |
75.00 |
2,025.00 |
60.00 |
1,620.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
7,424.00 |
7,424.00 |
| 726-01 |
bedding material
|
58.9 |
cu m |
50.00 |
2,945.00 |
80.00 |
4,712.00 |
80.00 |
4,712.00 |
60.00 |
3,534.00 |
| 727-01 |
mobilization
|
lump |
lump |
3,000.00 |
3,000.00 |
15,000.00 |
15,000.00 |
4,000.00 |
4,000.00 |
30,000.00 |
30,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
85.00 |
340.00 |
100.00 |
400.00 |
100.00 |
400.00 |
90.00 |
360.00 |
| 740-01 |
construction layout
|
lump |
lump |
2,500.00 |
2,500.00 |
3,500.00 |
3,500.00 |
2,500.00 |
2,500.00 |
8,000.00 |
8,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
47.26 |
cu m |
500.00 |
23,630.00 |
900.00 |
42,534.00 |
1,175.00 |
55,530.50 |
1,050.00 |
49,623.00 |
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
36.00 |
ln m |
1,600.00 |
57,600.00 |
1,900.00 |
68,400.00 |
2,000.00 |
72,000.00 |
1,700.00 |
61,200.00 |
| 806-01 |
deformed reinforcing steel
|
3,124   |
kg |
2.00 |
6,248.00 |
2.50 |
7,810.00 |
3.00 |
9,372.00 |
2.70 |
8,434.80 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
152,647.50 |
|
188,416.00 |
|
194,547.50 |
|
210,213.80 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
BEN ALLEN, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
NO BID |
NO BID |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta.1+155.000; 5.970m wide x 6.563m
long timber structure) |
1   |
ea |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
6   |
ea |
FREE |
FREE |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
ea |
FREE |
FREE |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
74   |
ln m |
FREE |
FREE |
|
|
|
|
|
|
| 302-01-A |
class ii base course (stone)
|
33.1 |
cu m |
90.00 |
2,979.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
5   |
cu m |
90.00 |
450.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
37.3 |
Mg |
150.00 |
5,595.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
21.0 |
ln m |
100.00 |
2,100.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
27   |
sq m |
55.00 |
1,485.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
58.9 |
cu m |
90.00 |
5,301.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
75.00 |
300.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
47.26 |
cu m |
647.00 |
30,577.22 |
|
|
|
|
|
|
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
36.00 |
ln m |
2,300.00 |
82,800.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
3,124   |
kg |
3.00 |
9,372.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
IRREGULAR |
|
|
|
|
|
|
|