| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - RICHARD PRICE CONTRACTING CO., LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - BOH BROS. CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
870,000.00 |
870,000.00 |
113,000.00 |
113,000.00 |
350,000.00 |
350,000.00 |
300,000.00 |
300,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
8,000.00 |
8,000.00 |
62,000.00 |
62,000.00 |
4,000.00 |
4,000.00 |
30,000.00 |
30,000.00 |
| 202-02-A-01 |
removal of bridges - str. no. 62328321303141 (sta
136+21.06 ; 242' x 24' prestressed girder bridge) |
1   |
EACH |
50,000.00 |
50,000.00 |
84,000.00 |
84,000.00 |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
15,241.1 |
SQYD |
3.50 |
53,343.85 |
5.00 |
76,205.50 |
3.00 |
45,723.30 |
6.00 |
91,446.60 |
| 202-02-H |
removal of guard rail
|
736   |
LNFT |
3.00 |
2,208.00 |
3.50 |
2,576.00 |
9.00 |
6,624.00 |
3.00 |
2,208.00 |
| 202-02-I |
remove existing sign
|
4   |
EACH |
250.00 |
1,000.00 |
100.00 |
400.00 |
300.00 |
1,200.00 |
340.00 |
1,360.00 |
| 202-02-J |
remove existing sign supports
|
4   |
EACH |
350.00 |
1,400.00 |
250.00 |
1,000.00 |
400.00 |
1,600.00 |
340.00 |
1,360.00 |
| 202-02-01 |
removal of single family residence (sta. 115+58 left
of center line) |
1   |
EACH |
6,000.00 |
6,000.00 |
1,500.00 |
1,500.00 |
4,000.00 |
4,000.00 |
5,000.00 |
5,000.00 |
| 202-02-02 |
removal of wood frame building on slab (sta.
127+30 left of center line) |
1   |
EACH |
5,000.00 |
5,000.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
3,000.00 |
3,000.00 |
| 202-02-03 |
removal of sewerage treatment plant (sta. 42+85 se
ramp rt.) |
1   |
EACH |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
2,300.00 |
2,300.00 |
6,000.00 |
6,000.00 |
| 203-01 |
general excavation
|
122,715   |
CUYD |
4.20 |
515,403.00 |
3.50 |
429,502.50 |
2.60 |
319,059.00 |
8.45 |
1,036,941.75 |
| 203-02 |
drainage excavation
|
5,000   |
CUYD |
6.00 |
30,000.00 |
7.00 |
35,000.00 |
6.00 |
30,000.00 |
9.00 |
45,000.00 |
| 203-03 |
muck excavation
|
5,000   |
CUYD |
7.00 |
35,000.00 |
10.00 |
50,000.00 |
6.00 |
30,000.00 |
9.00 |
45,000.00 |
| 203-04 |
embankment
|
410,741   |
CUYD |
8.50 |
3,491,298.50 |
7.88 |
3,236,639.08 |
11.00 |
4,518,151.00 |
9.50 |
3,902,039.50 |
| 203-05 |
nonplastic embankment
|
5,477   |
CUYD |
47.00 |
257,419.00 |
53.00 |
290,281.00 |
58.00 |
317,666.00 |
53.00 |
290,281.00 |
| 203-09 |
geotextile fabric
|
35,825.0 |
SQYD |
1.10 |
39,407.50 |
1.35 |
48,363.75 |
1.00 |
35,825.00 |
2.10 |
75,232.50 |
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
7.00 |
700.00 |
8.00 |
800.00 |
16.00 |
1,600.00 |
7.00 |
700.00 |
| 204-03 |
temporary slope drains
|
8   |
LNFT |
100.00 |
800.00 |
25.00 |
200.00 |
75.00 |
600.00 |
90.00 |
720.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
100.00 |
800.00 |
150.00 |
1,200.00 |
250.00 |
2,000.00 |
100.00 |
800.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
2   |
EACH |
600.00 |
1,200.00 |
500.00 |
1,000.00 |
800.00 |
1,600.00 |
800.00 |
1,600.00 |
| 204-06 |
temporary silt fencing
|
5,000   |
LNFT |
1.30 |
6,500.00 |
2.00 |
10,000.00 |
2.00 |
10,000.00 |
1.30 |
6,500.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
1,500.00 |
3,000.00 |
2,500.00 |
5,000.00 |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
| 302-02-C |
class ii base course (10" thick)
|
73,761.0 |
SQYD |
15.50 |
1,143,295.50 |
16.50 |
1,217,056.50 |
16.00 |
1,180,176.00 |
15.65 |
1,154,359.65 |
| 304-01 |
lime
|
1,617.51 |
TON |
120.00 |
194,101.20 |
124.00 |
200,571.24 |
100.00 |
161,751.00 |
120.00 |
194,101.20 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
34,233   |
SQYD |
1.80 |
61,619.40 |
1.45 |
49,637.85 |
1.00 |
34,233.00 |
2.60 |
89,005.80 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
60.00 |
6,000.00 |
40.00 |
4,000.00 |
40.00 |
4,000.00 |
33.00 |
3,300.00 |
| 502-01 |
superpave asphaltic concrete
|
6,398.7 |
TON |
75.00 |
479,902.50 |
82.50 |
527,892.75 |
80.00 |
511,896.00 |
79.00 |
505,497.30 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
391.6 |
TON |
130.00 |
50,908.00 |
99.00 |
38,768.40 |
130.00 |
50,908.00 |
95.00 |
37,202.00 |
| 509-01 |
cold planing asphaltic pavement
|
8,143   |
SQYD |
2.60 |
21,171.80 |
2.75 |
22,393.25 |
1.75 |
14,250.25 |
2.00 |
16,286.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 149   |
CUYD |
1.00 |
- 149.00 |
10.00 |
- 1,490.00 |
1.00 |
- 149.00 |
1.00 |
- 149.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
60,314.1 |
SQYD |
45.00 |
2,714,134.50 |
49.50 |
2,985,547.95 |
39.00 |
2,352,249.90 |
47.25 |
2,849,841.22 |
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
11,022.0 |
SQYD |
47.50 |
523,545.00 |
52.25 |
575,899.50 |
46.00 |
507,012.00 |
50.00 |
551,100.00 |
| 601-04 |
portland cement concrete pavement coring
|
18   |
EACH |
150.00 |
2,700.00 |
250.00 |
4,500.00 |
100.00 |
1,800.00 |
100.00 |
1,800.00 |
| 602-10 |
longitudinal shoulder joints
|
5,390   |
LNFT |
1.30 |
7,007.00 |
2.50 |
13,475.00 |
3.00 |
16,170.00 |
1.00 |
5,390.00 |
| 602-11 |
removal of existing shoulder underdrain systems
|
5,390   |
LNFT |
4.00 |
21,560.00 |
7.00 |
37,730.00 |
2.00 |
10,780.00 |
6.00 |
32,340.00 |
| 701-01-I |
cross drain pipe (24" rcp)
|
520   |
LNFT |
45.00 |
23,400.00 |
46.00 |
23,920.00 |
44.00 |
22,880.00 |
50.00 |
26,000.00 |
| 701-01-K |
cross drain pipe (30" rcp)
|
1,544   |
LNFT |
54.00 |
83,376.00 |
63.00 |
97,272.00 |
48.00 |
74,112.00 |
58.00 |
89,552.00 |
| 701-02-B |
cross drain pipe arch (18" equiv. rcpa)
|
88   |
LNFT |
44.00 |
3,872.00 |
43.00 |
3,784.00 |
58.00 |
5,104.00 |
50.00 |
4,400.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
304   |
LNFT |
52.00 |
15,808.00 |
52.00 |
15,808.00 |
52.00 |
15,808.00 |
55.00 |
16,720.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
144   |
LNFT |
60.00 |
8,640.00 |
71.00 |
10,224.00 |
60.00 |
8,640.00 |
61.00 |
8,784.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
8   |
LNFT |
64.00 |
512.00 |
85.00 |
680.00 |
170.00 |
1,360.00 |
51.00 |
408.00 |
| 701-05-G |
side drain pipe (18")
|
200   |
LNFT |
42.00 |
8,400.00 |
30.00 |
6,000.00 |
32.00 |
6,400.00 |
40.00 |
8,000.00 |
| 701-05-I |
side drain pipe (24")
|
120   |
LNFT |
46.00 |
5,520.00 |
36.00 |
4,320.00 |
50.00 |
6,000.00 |
56.00 |
6,720.00 |
| 701-06-B |
side drain pipe arch (18" equiv.)
|
80   |
LNFT |
46.00 |
3,680.00 |
33.00 |
2,640.00 |
72.00 |
5,760.00 |
52.00 |
4,160.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
72   |
LNFT |
70.00 |
5,040.00 |
86.00 |
6,192.00 |
76.00 |
5,472.00 |
82.00 |
5,904.00 |
| 702-01 |
junction boxes(mh-20x9)
|
2   |
EACH |
5,500.00 |
11,000.00 |
7,500.00 |
15,000.00 |
2,800.00 |
5,600.00 |
19,000.00 |
38,000.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
4,500.00 |
4,500.00 |
3,000.00 |
3,000.00 |
3,800.00 |
3,800.00 |
2,000.00 |
2,000.00 |
| 703-03 |
perforated pipe underdrains
|
1,380   |
LNFT |
7.00 |
9,660.00 |
8.00 |
11,040.00 |
4.00 |
5,520.00 |
7.00 |
9,660.00 |
| 703-04 |
nonperforated pipe underdrains
|
460   |
LNFT |
8.00 |
3,680.00 |
8.00 |
3,680.00 |
4.00 |
1,840.00 |
15.00 |
6,900.00 |
| 704-01-C |
guard rail (double thrie beam) (3'-1 1/2" post spacing)
|
512.5 |
LNFT |
45.00 |
23,062.50 |
46.75 |
23,959.37 |
43.00 |
22,037.50 |
45.00 |
23,062.50 |
| 704-03 |
blocked out guard rail
|
825.0 |
LNFT |
17.00 |
14,025.00 |
17.60 |
14,520.00 |
18.00 |
14,850.00 |
17.00 |
14,025.00 |
| 704-06 |
guard rail anchor sections (trailing end)
|
6.3 |
LNFT |
65.00 |
409.50 |
66.00 |
415.80 |
65.00 |
409.50 |
63.00 |
396.90 |
| 704-06-A |
guard rail anchor sections (trailing end) (single
thrie beam) |
12.5 |
LNFT |
75.00 |
937.50 |
88.00 |
1,100.00 |
85.00 |
1,062.50 |
84.00 |
1,050.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
41.7 |
LNFT |
39.00 |
1,626.30 |
48.00 |
2,001.60 |
45.00 |
1,876.50 |
46.00 |
1,918.20 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
1,800.00 |
3,600.00 |
2,035.00 |
4,070.00 |
2,000.00 |
4,000.00 |
2,000.00 |
4,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,420.00 |
2,420.00 |
2,300.00 |
2,300.00 |
2,000.00 |
2,000.00 |
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
4,500.00 |
9,000.00 |
4,400.00 |
8,800.00 |
4,200.00 |
8,400.00 |
4,000.00 |
8,000.00 |
| 705-06-B |
chain link fence (5-foot height)
|
5,820   |
LNFT |
10.30 |
59,946.00 |
11.50 |
66,930.00 |
11.00 |
64,020.00 |
11.00 |
64,020.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
2,107.2 |
SQYD |
35.00 |
73,752.00 |
35.00 |
73,752.00 |
40.00 |
84,288.00 |
40.00 |
84,288.00 |
| 707-01 |
concrete curb
|
7,994.0 |
LNFT |
5.00 |
39,970.00 |
8.00 |
63,952.00 |
6.50 |
51,961.00 |
5.50 |
43,967.00 |
| 707-03 |
combination concrete curb & gutter
|
324.0 |
LNFT |
25.00 |
8,100.00 |
21.00 |
6,804.00 |
30.00 |
9,720.00 |
22.00 |
7,128.00 |
| 708-01 |
right-of-way monument
|
50   |
EACH |
100.00 |
5,000.00 |
125.00 |
6,250.00 |
200.00 |
10,000.00 |
200.00 |
10,000.00 |
| 708-02 |
right-of-way monument witness post
|
50   |
EACH |
100.00 |
5,000.00 |
125.00 |
6,250.00 |
200.00 |
10,000.00 |
200.00 |
10,000.00 |
| 710-01 |
flowable fill
|
11   |
CUYD |
200.00 |
2,200.00 |
150.00 |
1,650.00 |
110.00 |
1,210.00 |
170.00 |
1,870.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,693   |
SQYD |
38.00 |
64,334.00 |
44.00 |
74,492.00 |
40.00 |
67,720.00 |
57.00 |
96,501.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
160,000.00 |
160,000.00 |
210,000.00 |
210,000.00 |
100,000.00 |
100,000.00 |
84,000.00 |
84,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.000 |
MILE |
350.00 |
1,400.00 |
5,000.00 |
20,000.00 |
330.00 |
1,320.00 |
3,000.00 |
12,000.00 |
| 713-04-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
1.742 |
MILE |
3,300.00 |
5,748.60 |
3,000.00 |
5,226.00 |
3,600.00 |
6,271.20 |
3,500.00 |
6,097.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.000 |
MILE |
760.00 |
3,040.00 |
1,100.00 |
4,400.00 |
850.00 |
3,400.00 |
800.00 |
3,200.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
2.234 |
MILE |
13,000.00 |
29,042.00 |
11,616.00 |
25,950.14 |
13,500.00 |
30,159.00 |
13,500.00 |
30,159.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
264   |
EACH |
5.00 |
1,320.00 |
8.00 |
2,112.00 |
5.50 |
1,452.00 |
5.00 |
1,320.00 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
700   |
EACH |
200.00 |
140,000.00 |
230.00 |
161,000.00 |
185.00 |
129,500.00 |
188.00 |
131,600.00 |
| 717-01 |
seeding
|
750   |
LB |
6.00 |
4,500.00 |
7.50 |
5,625.00 |
6.50 |
4,875.00 |
6.00 |
4,500.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
120,000   |
SQYD |
0.85 |
102,000.00 |
1.00 |
120,000.00 |
1.10 |
132,000.00 |
1.00 |
120,000.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
24,000.00 |
24,000.00 |
20,000.00 |
20,000.00 |
| 724-01 |
pavement patching
|
200   |
SQYD |
75.00 |
15,000.00 |
95.00 |
19,000.00 |
100.00 |
20,000.00 |
88.00 |
17,600.00 |
| 726-01 |
bedding material
|
293.3 |
CUYD |
40.00 |
11,732.00 |
30.00 |
8,799.00 |
50.00 |
14,665.00 |
46.00 |
13,491.80 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,600,000.00 |
1,600,000.00 |
1,200,000.00 |
1,200,000.00 |
1,500,000.00 |
1,500,000.00 |
1,150,000.00 |
1,150,000.00 |
| 729-01 |
sign (type a)
|
452.8 |
SQFT |
20.00 |
9,056.00 |
22.00 |
9,961.60 |
22.00 |
9,961.60 |
21.00 |
9,508.80 |
| 729-01-A |
sign (type a)(r10-12)(24"x30")
|
10.0 |
SQFT |
20.00 |
200.00 |
22.00 |
220.00 |
22.00 |
220.00 |
21.00 |
210.00 |
| 729-01-B |
sign (type a)(r3-2)(24"x24")
|
8.0 |
SQFT |
20.00 |
160.00 |
22.00 |
176.00 |
22.00 |
176.00 |
21.00 |
168.00 |
| 729-01-C |
sign (type a)(r3-6l)(30"x36")
|
15.0 |
SQFT |
20.00 |
300.00 |
22.00 |
330.00 |
22.00 |
330.00 |
21.00 |
315.00 |
| 729-01-D |
sign (type a)(r3-5l)(30"x36")
|
7.5 |
SQFT |
20.00 |
150.00 |
22.00 |
165.00 |
22.00 |
165.00 |
21.00 |
157.50 |
| 729-04 |
sign (type d)
|
995.0 |
SQFT |
22.00 |
21,890.00 |
24.50 |
24,377.50 |
24.00 |
23,880.00 |
23.00 |
22,885.00 |
| 729-05 |
sign (type e)
|
85.0 |
SQFT |
26.00 |
2,210.00 |
29.00 |
2,465.00 |
29.00 |
2,465.00 |
27.00 |
2,295.00 |
| 729-08-A |
mounting (2 1/2" post)
|
30   |
EACH |
600.00 |
18,000.00 |
660.00 |
19,800.00 |
650.00 |
19,500.00 |
630.00 |
18,900.00 |
| 729-08-B |
mounting (3 1/2" post)
|
8   |
EACH |
700.00 |
5,600.00 |
765.00 |
6,120.00 |
750.00 |
6,000.00 |
730.00 |
5,840.00 |
| 729-08-E |
mounting (s3 x 5.7)
|
2   |
EACH |
600.00 |
1,200.00 |
660.00 |
1,320.00 |
650.00 |
1,300.00 |
630.00 |
1,260.00 |
| 729-08-F |
mounting (w6 x 12)
|
16   |
EACH |
700.00 |
11,200.00 |
770.00 |
12,320.00 |
750.00 |
12,000.00 |
730.00 |
11,680.00 |
| 729-08-G |
mounting (w8 x 18)
|
10   |
EACH |
1,200.00 |
12,000.00 |
1,320.00 |
13,200.00 |
1,300.00 |
13,000.00 |
1,200.00 |
12,000.00 |
| 729-19-B |
dead end road installations(type b)
|
1   |
EACH |
1,400.00 |
1,400.00 |
1,000.00 |
1,000.00 |
1,300.00 |
1,300.00 |
1,200.00 |
1,200.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
240   |
EACH |
11.00 |
2,640.00 |
12.00 |
2,880.00 |
12.00 |
2,880.00 |
12.00 |
2,880.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,175   |
EACH |
5.10 |
11,092.50 |
5.60 |
12,180.00 |
6.00 |
13,050.00 |
5.00 |
10,875.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
3,939   |
LNFT |
3.00 |
11,817.00 |
2.75 |
10,832.25 |
3.30 |
12,998.70 |
3.00 |
11,817.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.588 |
MILE |
1,900.00 |
14,417.20 |
2,079.00 |
15,775.45 |
2,000.00 |
15,176.00 |
2,000.00 |
15,176.00 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
2.349 |
MILE |
3,800.00 |
8,926.20 |
4,158.00 |
9,767.14 |
4,000.00 |
9,396.00 |
4,000.00 |
9,396.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.911 |
MILE |
800.00 |
1,528.80 |
858.00 |
1,639.63 |
900.00 |
1,719.90 |
800.00 |
1,528.80 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
1.877 |
MILE |
3,400.00 |
6,381.80 |
3,630.00 |
6,813.51 |
3,600.00 |
6,757.20 |
3,400.00 |
6,381.80 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
24   |
EACH |
140.00 |
3,360.00 |
150.00 |
3,600.00 |
150.00 |
3,600.00 |
140.00 |
3,360.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
200.00 |
200.00 |
215.00 |
215.00 |
220.00 |
220.00 |
200.00 |
200.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
12   |
EACH |
130.00 |
1,560.00 |
138.00 |
1,656.00 |
135.00 |
1,620.00 |
130.00 |
1,560.00 |
| 735-01 |
mailboxes
|
2   |
EACH |
1.00 |
2.00 |
220.00 |
440.00 |
10.00 |
20.00 |
30.00 |
60.00 |
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
150.00 |
300.00 |
200.00 |
400.00 |
160.00 |
320.00 |
200.00 |
400.00 |
| 736-01 |
trenching and backfilling
|
790   |
LNFT |
4.50 |
3,555.00 |
4.90 |
3,871.00 |
2.50 |
1,975.00 |
5.00 |
3,950.00 |
| 736-03-A |
jacked or bored conduit (2" sch.80)
|
70   |
LNFT |
10.00 |
700.00 |
12.00 |
840.00 |
14.00 |
980.00 |
10.00 |
700.00 |
| 736-03-B |
jacked or bored conduit (3" sch. 80)
|
1,510   |
LNFT |
10.60 |
16,006.00 |
11.75 |
17,742.50 |
18.00 |
27,180.00 |
11.00 |
16,610.00 |
| 736-04-A |
signal support (50' mast arm)
|
2   |
EACH |
11,200.00 |
22,400.00 |
12,272.00 |
24,544.00 |
9,000.00 |
18,000.00 |
12,000.00 |
24,000.00 |
| 736-04-B |
signal support (30'/40' dual mast arms)
|
1   |
EACH |
12,200.00 |
12,200.00 |
13,406.00 |
13,406.00 |
11,000.00 |
11,000.00 |
13,000.00 |
13,000.00 |
| 736-04-C |
signal support (30'/45' dual mast arms)
|
1   |
EACH |
12,500.00 |
12,500.00 |
13,708.00 |
13,708.00 |
11,500.00 |
11,500.00 |
13,000.00 |
13,000.00 |
| 736-05-A |
signal heads (l.e.d.,3-section, 12" lenses,r,y,g)
|
12   |
EACH |
1,100.00 |
13,200.00 |
1,220.00 |
14,640.00 |
800.00 |
9,600.00 |
1,200.00 |
14,400.00 |
| 736-05-B |
signal heads (l.e.d.,5-section, 12" lenses,
r,y,lt.y,lt.g,g) |
2   |
EACH |
1,600.00 |
3,200.00 |
1,766.00 |
3,532.00 |
1,250.00 |
2,500.00 |
2,000.00 |
4,000.00 |
| 736-08 |
signal controller (nema,ts-2,type2,8-phase;type vi
cabinet) |
2   |
EACH |
14,000.00 |
28,000.00 |
15,415.00 |
30,830.00 |
20,000.00 |
40,000.00 |
15,000.00 |
30,000.00 |
| 736-09 |
loop detector
|
380   |
LNFT |
10.00 |
3,800.00 |
11.00 |
4,180.00 |
9.50 |
3,610.00 |
11.00 |
4,180.00 |
| 736-10-A |
underground junction box (type f)
|
4   |
EACH |
500.00 |
2,000.00 |
525.00 |
2,100.00 |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
| 736-10-B |
underground junction box (type g)
|
4   |
EACH |
800.00 |
3,200.00 |
856.00 |
3,424.00 |
925.00 |
3,700.00 |
800.00 |
3,200.00 |
| 736-10-C |
underground junction box (type h)
|
2   |
EACH |
1,100.00 |
2,200.00 |
1,215.00 |
2,430.00 |
1,100.00 |
2,200.00 |
1,000.00 |
2,000.00 |
| 736-11-A |
conduit (1/2" pec. sch.80)
|
35   |
LNFT |
2.50 |
87.50 |
3.00 |
105.00 |
2.20 |
77.00 |
3.00 |
105.00 |
| 736-11-B |
conduit (2" pec. sch.80)
|
755   |
LNFT |
3.00 |
2,265.00 |
3.50 |
2,642.50 |
3.50 |
2,642.50 |
3.00 |
2,265.00 |
| 736-12-A |
conductor (2c, loop lead-in,#14 awg shielded and
stranded) |
1,020   |
LNFT |
1.80 |
1,836.00 |
2.00 |
2,040.00 |
1.10 |
1,122.00 |
2.00 |
2,040.00 |
| 736-12-B |
conductor (6 pr.,imsa 20-6, #19 awg solid, twisted
pair) |
775   |
LNFT |
2.40 |
1,860.00 |
2.60 |
2,015.00 |
2.00 |
1,550.00 |
2.00 |
1,550.00 |
| 736-12-C |
conductor (10c, signal, #14 awg standed)
|
970   |
LNFT |
2.30 |
2,231.00 |
2.60 |
2,522.00 |
1.50 |
1,455.00 |
2.00 |
1,940.00 |
| 739-01 |
hydro-seeding
|
46.50 |
ACRE |
750.00 |
34,875.00 |
958.00 |
44,547.00 |
850.00 |
39,525.00 |
800.00 |
37,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
140,000.00 |
140,000.00 |
200,000.00 |
200,000.00 |
350,000.00 |
350,000.00 |
| 802-01 |
structural excavation
|
623.3 |
CUYD |
11.00 |
6,856.30 |
44.00 |
27,425.20 |
15.00 |
9,349.50 |
60.00 |
37,398.00 |
| 804-01-B |
precast concrete piles (14")
|
9,152   |
LNFT |
25.00 |
228,800.00 |
23.10 |
211,411.20 |
22.00 |
201,344.00 |
24.50 |
224,224.00 |
| 804-01-D |
precast concrete piles (18")
|
3,792   |
LNFT |
38.00 |
144,096.00 |
35.20 |
133,478.40 |
36.00 |
136,512.00 |
36.00 |
136,512.00 |
| 804-05 |
precast concrete test piles
|
1   |
EACH |
25,000.00 |
25,000.00 |
16,500.00 |
16,500.00 |
25,000.00 |
25,000.00 |
16,000.00 |
16,000.00 |
| 804-09 |
loading test piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
16,500.00 |
16,500.00 |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
| 804-10 |
reloading test piles
|
1   |
EACH |
100.00 |
100.00 |
550.00 |
550.00 |
100.00 |
100.00 |
1,000.00 |
1,000.00 |
| 804-11 |
redriving test piles
|
1   |
EACH |
100.00 |
100.00 |
550.00 |
550.00 |
100.00 |
100.00 |
2,500.00 |
2,500.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
100.00 |
100.00 |
550.00 |
550.00 |
100.00 |
100.00 |
9,500.00 |
9,500.00 |
| 804-17 |
dynamic monitoring
|
3   |
EACH |
1,500.00 |
4,500.00 |
1,650.00 |
4,950.00 |
1,200.00 |
3,600.00 |
3,300.00 |
9,900.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
23.75 |
CUYD |
850.00 |
20,187.50 |
850.00 |
20,187.50 |
1,200.00 |
28,500.00 |
900.00 |
21,375.00 |
| 805-01-D |
class a concrete (footings)
|
289.71 |
CUYD |
250.00 |
72,427.50 |
358.00 |
103,716.18 |
160.00 |
46,353.60 |
400.00 |
115,884.00 |
| 805-01-F |
class a concrete (bents)
|
568.88 |
CUYD |
450.00 |
255,996.00 |
475.00 |
270,218.00 |
425.00 |
241,774.00 |
550.00 |
312,884.00 |
| 805-03 |
class aa concrete
|
1,111.26 |
CUYD |
400.00 |
444,504.00 |
385.00 |
427,835.10 |
425.00 |
472,285.50 |
480.00 |
533,404.80 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
5,970.7 |
LNFT |
95.00 |
567,216.50 |
93.50 |
558,260.45 |
90.00 |
537,363.00 |
100.00 |
597,070.00 |
| 805-11 |
strip seal joints
|
196.00 |
LNFT |
100.00 |
19,600.00 |
138.00 |
27,048.00 |
115.00 |
22,540.00 |
80.00 |
15,680.00 |
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
364.0 |
LNFT |
230.00 |
83,720.00 |
260.00 |
94,640.00 |
450.00 |
163,800.00 |
215.00 |
78,260.00 |
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
176.0 |
LNFT |
450.00 |
79,200.00 |
437.00 |
76,912.00 |
650.00 |
114,400.00 |
320.00 |
56,320.00 |
| 806-01 |
deformed reinforcing steel
|
454,162   |
LB |
0.60 |
272,497.20 |
0.77 |
349,704.74 |
0.65 |
295,205.30 |
0.70 |
317,913.40 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
6,000.00 |
6,000.00 |
11,000.00 |
11,000.00 |
7,000.00 |
7,000.00 |
8,000.00 |
8,000.00 |
| 810-01 |
concrete railing (barrier)
|
880.00 |
LNFT |
37.00 |
32,560.00 |
42.00 |
36,960.00 |
50.00 |
44,000.00 |
36.00 |
31,680.00 |
| 813-01 |
concrete approach slabs
|
877.04 |
SQYD |
130.00 |
114,015.20 |
159.00 |
139,449.36 |
160.00 |
140,326.40 |
120.00 |
105,244.80 |
| S-001 |
video detection device and connection
|
4   |
ea |
5,400.00 |
21,600.00 |
5,910.00 |
23,640.00 |
4,400.00 |
17,600.00 |
5,700.00 |
22,800.00 |
| S-002 |
video detection system
|
2   |
ea |
2,200.00 |
4,400.00 |
2,400.00 |
4,800.00 |
12,000.00 |
24,000.00 |
2,000.00 |
4,000.00 |
| S-003 |
inclinometer settlement monitoring instrumentation
|
lump |
LUMP |
25,000.00 |
25,000.00 |
39,000.00 |
39,000.00 |
24,000.00 |
24,000.00 |
35,000.00 |
35,000.00 |
| S-101 |
dynamic analysis
|
3   |
EACH |
1,000.00 |
3,000.00 |
1,100.00 |
3,300.00 |
1,500.00 |
4,500.00 |
3,300.00 |
9,900.00 |
| S-102 |
vertical wick drains
|
428,860   |
LNFT |
0.35 |
150,101.00 |
0.41 |
175,832.60 |
0.36 |
154,389.60 |
0.33 |
141,523.80 |
| S-103 |
settlement plates (installation & monitoring)
|
6   |
EACH |
2,500.00 |
15,000.00 |
2,000.00 |
12,000.00 |
1,000.00 |
6,000.00 |
1,100.00 |
6,600.00 |
| S-104 |
cast-in-place revetment (catch basins)
|
1   |
each |
2,500.00 |
2,500.00 |
600.00 |
600.00 |
400.00 |
400.00 |
4,000.00 |
4,000.00 |
| S-105 |
variable message sign unit
|
4   |
each |
18,000.00 |
72,000.00 |
20,680.00 |
82,720.00 |
20,000.00 |
80,000.00 |
10,500.00 |
42,000.00 |
| S-106 |
saw cut slab at new right of way line (sta. 117+20,
sta. 123+50) |
100   |
LNFT |
10.00 |
1,000.00 |
10.00 |
1,000.00 |
16.00 |
1,600.00 |
11.00 |
1,100.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
16,392,893.35 |
|
15,851,700.99 |
|
16,471,633.45 |
|
17,121,533.62 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - L & A CONTRACTING CO. |
JAMES CONSTRUCTION GROUP LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
640,000.00 |
640,000.00 |
490,000.00 |
490,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
16,500.00 |
16,500.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridges - str. no. 62328321303141 (sta
136+21.06 ; 242' x 24' prestressed girder bridge) |
1   |
EACH |
40,000.00 |
40,000.00 |
170,000.00 |
170,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
15,241.1 |
SQYD |
4.55 |
69,347.00 |
4.00 |
60,964.40 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
736   |
LNFT |
4.40 |
3,238.40 |
2.50 |
1,840.00 |
|
|
|
|
| 202-02-I |
remove existing sign
|
4   |
EACH |
262.50 |
1,050.00 |
250.00 |
1,000.00 |
|
|
|
|
| 202-02-J |
remove existing sign supports
|
4   |
EACH |
367.50 |
1,470.00 |
350.00 |
1,400.00 |
|
|
|
|
| 202-02-01 |
removal of single family residence (sta. 115+58 left
of center line) |
1   |
EACH |
14,500.00 |
14,500.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-02 |
removal of wood frame building on slab (sta.
127+30 left of center line) |
1   |
EACH |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-03 |
removal of sewerage treatment plant (sta. 42+85 se
ramp rt.) |
1   |
EACH |
1,750.00 |
1,750.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 203-01 |
general excavation
|
122,715   |
CUYD |
5.00 |
613,575.00 |
4.00 |
490,860.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
5,000   |
CUYD |
4.17 |
20,850.00 |
7.00 |
35,000.00 |
|
|
|
|
| 203-03 |
muck excavation
|
5,000   |
CUYD |
4.17 |
20,850.00 |
9.00 |
45,000.00 |
|
|
|
|
| 203-04 |
embankment
|
410,741   |
CUYD |
9.00 |
3,696,669.00 |
8.00 |
3,285,928.00 |
|
|
|
|
| 203-05 |
nonplastic embankment
|
5,477   |
CUYD |
48.00 |
262,896.00 |
45.00 |
246,465.00 |
|
|
|
|
| 203-09 |
geotextile fabric
|
35,825.0 |
SQYD |
1.20 |
42,990.00 |
1.20 |
42,990.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
6.30 |
630.00 |
15.00 |
1,500.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
8   |
LNFT |
21.00 |
168.00 |
15.00 |
120.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
136.50 |
1,092.00 |
100.00 |
800.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
2   |
EACH |
420.00 |
840.00 |
250.00 |
500.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
5,000   |
LNFT |
2.10 |
10,500.00 |
1.25 |
6,250.00 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
3,675.00 |
7,350.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 302-02-C |
class ii base course (10" thick)
|
73,761.0 |
SQYD |
15.16 |
1,118,216.76 |
14.00 |
1,032,654.00 |
|
|
|
|
| 304-01 |
lime
|
1,617.51 |
TON |
118.00 |
190,866.18 |
100.00 |
161,751.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
34,233   |
SQYD |
4.60 |
157,471.80 |
1.50 |
51,349.50 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
53.00 |
5,300.00 |
45.00 |
4,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,398.7 |
TON |
52.50 |
335,931.75 |
80.00 |
511,896.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
391.6 |
TON |
57.75 |
22,614.90 |
135.00 |
52,866.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
8,143   |
SQYD |
1.37 |
11,155.91 |
2.00 |
16,286.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 149   |
CUYD |
0.80 |
- 119.20 |
0.01 |
- 1.49 |
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
60,314.1 |
SQYD |
47.25 |
2,849,841.22 |
40.00 |
2,412,564.00 |
|
|
|
|
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
11,022.0 |
SQYD |
50.00 |
551,100.00 |
45.00 |
495,990.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
18   |
EACH |
105.00 |
1,890.00 |
100.00 |
1,800.00 |
|
|
|
|
| 602-10 |
longitudinal shoulder joints
|
5,390   |
LNFT |
0.90 |
4,851.00 |
15.00 |
80,850.00 |
|
|
|
|
| 602-11 |
removal of existing shoulder underdrain systems
|
5,390   |
LNFT |
0.55 |
2,964.50 |
1.25 |
6,737.50 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp)
|
520   |
LNFT |
89.25 |
46,410.00 |
60.00 |
31,200.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp)
|
1,544   |
LNFT |
103.50 |
159,804.00 |
80.00 |
123,520.00 |
|
|
|
|
| 701-02-B |
cross drain pipe arch (18" equiv. rcpa)
|
88   |
LNFT |
57.75 |
5,082.00 |
55.00 |
4,840.00 |
|
|
|
|
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
304   |
LNFT |
104.60 |
31,798.40 |
65.00 |
19,760.00 |
|
|
|
|
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
144   |
LNFT |
157.00 |
22,608.00 |
80.00 |
11,520.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
8   |
LNFT |
52.50 |
420.00 |
60.00 |
480.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
200   |
LNFT |
57.75 |
11,550.00 |
45.00 |
9,000.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
120   |
LNFT |
69.30 |
8,316.00 |
60.00 |
7,200.00 |
|
|
|
|
| 701-06-B |
side drain pipe arch (18" equiv.)
|
80   |
LNFT |
63.00 |
5,040.00 |
55.00 |
4,400.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
72   |
LNFT |
210.00 |
15,120.00 |
110.00 |
7,920.00 |
|
|
|
|
| 702-01 |
junction boxes(mh-20x9)
|
2   |
EACH |
12,600.00 |
25,200.00 |
5,500.00 |
11,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
5,250.00 |
5,250.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
1,380   |
LNFT |
8.50 |
11,730.00 |
10.00 |
13,800.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
460   |
LNFT |
8.50 |
3,910.00 |
20.00 |
9,200.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam) (3'-1 1/2" post spacing)
|
512.5 |
LNFT |
47.25 |
24,215.62 |
45.00 |
23,062.50 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
825.0 |
LNFT |
18.40 |
15,180.00 |
16.00 |
13,200.00 |
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
6.3 |
LNFT |
68.25 |
429.97 |
65.00 |
409.50 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end) (single
thrie beam) |
12.5 |
LNFT |
78.75 |
984.37 |
80.00 |
1,000.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
41.7 |
LNFT |
52.50 |
2,189.25 |
45.00 |
1,876.50 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,100.00 |
4,200.00 |
1,800.00 |
3,600.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
1   |
EACH |
2,625.00 |
2,625.00 |
2,200.00 |
2,200.00 |
|
|
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
6,300.00 |
12,600.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| 705-06-B |
chain link fence (5-foot height)
|
5,820   |
LNFT |
18.70 |
108,834.00 |
10.00 |
58,200.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
2,107.2 |
SQYD |
33.60 |
70,801.92 |
33.00 |
69,537.60 |
|
|
|
|
| 707-01 |
concrete curb
|
7,994.0 |
LNFT |
5.25 |
41,968.50 |
8.00 |
63,952.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
324.0 |
LNFT |
20.80 |
6,739.20 |
17.00 |
5,508.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
50   |
EACH |
105.36 |
5,268.00 |
150.00 |
7,500.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
50   |
EACH |
50.00 |
2,500.00 |
150.00 |
7,500.00 |
|
|
|
|
| 710-01 |
flowable fill
|
11   |
CUYD |
550.00 |
6,050.00 |
80.00 |
880.00 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
1,693   |
SQYD |
68.25 |
115,547.25 |
38.00 |
64,334.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,925.00 |
8,925.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.000 |
MILE |
379.50 |
1,518.00 |
250.00 |
1,000.00 |
|
|
|
|
| 713-04-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
1.742 |
MILE |
3,465.00 |
6,036.03 |
3,200.00 |
5,574.40 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.000 |
MILE |
800.00 |
3,200.00 |
700.00 |
2,800.00 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
2.234 |
MILE |
13,545.00 |
30,259.53 |
12,000.00 |
26,808.00 |
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
264   |
EACH |
5.25 |
1,386.00 |
5.00 |
1,320.00 |
|
|
|
|
| 713-09 |
temporary precast concrete barrier (department
furnished) |
700   |
EACH |
377.00 |
263,900.00 |
90.00 |
63,000.00 |
|
|
|
|
| 717-01 |
seeding
|
750   |
LB |
7.50 |
5,625.00 |
6.00 |
4,500.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
120,000   |
SQYD |
1.00 |
120,000.00 |
1.00 |
120,000.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
27,500.00 |
27,500.00 |
6,000.00 |
6,000.00 |
|
|
|
|
| 724-01 |
pavement patching
|
200   |
SQYD |
137.50 |
27,500.00 |
110.00 |
22,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
293.3 |
CUYD |
68.25 |
20,017.72 |
45.00 |
13,198.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,250,000.00 |
1,250,000.00 |
1,400,000.00 |
1,400,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
452.8 |
SQFT |
21.00 |
9,508.80 |
20.00 |
9,056.00 |
|
|
|
|
| 729-01-A |
sign (type a)(r10-12)(24"x30")
|
10.0 |
SQFT |
21.00 |
210.00 |
20.00 |
200.00 |
|
|
|
|
| 729-01-B |
sign (type a)(r3-2)(24"x24")
|
8.0 |
SQFT |
21.00 |
168.00 |
20.00 |
160.00 |
|
|
|
|
| 729-01-C |
sign (type a)(r3-6l)(30"x36")
|
15.0 |
SQFT |
21.00 |
315.00 |
20.00 |
300.00 |
|
|
|
|
| 729-01-D |
sign (type a)(r3-5l)(30"x36")
|
7.5 |
SQFT |
21.00 |
157.50 |
20.00 |
150.00 |
|
|
|
|
| 729-04 |
sign (type d)
|
995.0 |
SQFT |
23.10 |
22,984.50 |
22.00 |
21,890.00 |
|
|
|
|
| 729-05 |
sign (type e)
|
85.0 |
SQFT |
27.30 |
2,320.50 |
26.00 |
2,210.00 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
30   |
EACH |
630.00 |
18,900.00 |
600.00 |
18,000.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
8   |
EACH |
730.00 |
5,840.00 |
700.00 |
5,600.00 |
|
|
|
|
| 729-08-E |
mounting (s3 x 5.7)
|
2   |
EACH |
630.00 |
1,260.00 |
600.00 |
1,200.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
16   |
EACH |
735.00 |
11,760.00 |
700.00 |
11,200.00 |
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
10   |
EACH |
1,260.00 |
12,600.00 |
1,200.00 |
12,000.00 |
|
|
|
|
| 729-19-B |
dead end road installations(type b)
|
1   |
EACH |
892.50 |
892.50 |
1,500.00 |
1,500.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
240   |
EACH |
11.50 |
2,760.00 |
12.00 |
2,880.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,175   |
EACH |
5.36 |
11,658.00 |
5.00 |
10,875.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
3,939   |
LNFT |
3.05 |
12,013.95 |
3.00 |
11,817.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.588 |
MILE |
1,984.50 |
15,058.38 |
1,900.00 |
14,417.20 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
2.349 |
MILE |
3,970.00 |
9,325.53 |
3,800.00 |
8,926.20 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.911 |
MILE |
819.00 |
1,565.10 |
800.00 |
1,528.80 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape (type v) |
1.877 |
MILE |
3,465.00 |
6,503.80 |
3,400.00 |
6,381.80 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
24   |
EACH |
141.75 |
3,402.00 |
150.00 |
3,600.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
204.75 |
204.75 |
200.00 |
200.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
12   |
EACH |
131.25 |
1,575.00 |
125.00 |
1,500.00 |
|
|
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
6.00 |
12.00 |
10.00 |
20.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
133.65 |
267.30 |
100.00 |
200.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
790   |
LNFT |
2.36 |
1,864.40 |
4.50 |
3,555.00 |
|
|
|
|
| 736-03-A |
jacked or bored conduit (2" sch.80)
|
70   |
LNFT |
14.18 |
992.60 |
10.00 |
700.00 |
|
|
|
|
| 736-03-B |
jacked or bored conduit (3" sch. 80)
|
1,510   |
LNFT |
17.85 |
26,953.50 |
11.00 |
16,610.00 |
|
|
|
|
| 736-04-A |
signal support (50' mast arm)
|
2   |
EACH |
9,219.00 |
18,438.00 |
11,000.00 |
22,000.00 |
|
|
|
|
| 736-04-B |
signal support (30'/40' dual mast arms)
|
1   |
EACH |
10,437.00 |
10,437.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| 736-04-C |
signal support (30'/45' dual mast arms)
|
1   |
EACH |
10,684.00 |
10,684.00 |
12,500.00 |
12,500.00 |
|
|
|
|
| 736-05-A |
signal heads (l.e.d.,3-section, 12" lenses,r,y,g)
|
12   |
EACH |
787.50 |
9,450.00 |
1,100.00 |
13,200.00 |
|
|
|
|
| 736-05-B |
signal heads (l.e.d.,5-section, 12" lenses,
r,y,lt.y,lt.g,g) |
2   |
EACH |
1,260.00 |
2,520.00 |
1,600.00 |
3,200.00 |
|
|
|
|
| 736-08 |
signal controller (nema,ts-2,type2,8-phase;type vi
cabinet) |
2   |
EACH |
20,000.00 |
40,000.00 |
14,000.00 |
28,000.00 |
|
|
|
|
| 736-09 |
loop detector
|
380   |
LNFT |
9.45 |
3,591.00 |
10.00 |
3,800.00 |
|
|
|
|
| 736-10-A |
underground junction box (type f)
|
4   |
EACH |
472.50 |
1,890.00 |
480.00 |
1,920.00 |
|
|
|
|
| 736-10-B |
underground junction box (type g)
|
4   |
EACH |
929.25 |
3,717.00 |
780.00 |
3,120.00 |
|
|
|
|
| 736-10-C |
underground junction box (type h)
|
2   |
EACH |
1,128.75 |
2,257.50 |
1,100.00 |
2,200.00 |
|
|
|
|
| 736-11-A |
conduit (1/2" pec. sch.80)
|
35   |
LNFT |
2.10 |
73.50 |
2.50 |
87.50 |
|
|
|
|
| 736-11-B |
conduit (2" pec. sch.80)
|
755   |
LNFT |
3.31 |
2,499.05 |
3.00 |
2,265.00 |
|
|
|
|
| 736-12-A |
conductor (2c, loop lead-in,#14 awg shielded and
stranded) |
1,020   |
LNFT |
1.05 |
1,071.00 |
2.00 |
2,040.00 |
|
|
|
|
| 736-12-B |
conductor (6 pr.,imsa 20-6, #19 awg solid, twisted
pair) |
775   |
LNFT |
1.84 |
1,426.00 |
3.00 |
2,325.00 |
|
|
|
|
| 736-12-C |
conductor (10c, signal, #14 awg standed)
|
970   |
LNFT |
1.31 |
1,270.70 |
3.00 |
2,910.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
46.50 |
ACRE |
958.32 |
44,561.88 |
750.00 |
34,875.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
800,000.00 |
800,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 802-01 |
structural excavation
|
623.3 |
CUYD |
15.00 |
9,349.50 |
75.00 |
46,747.50 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
9,152   |
LNFT |
21.00 |
192,192.00 |
24.00 |
219,648.00 |
|
|
|
|
| 804-01-D |
precast concrete piles (18")
|
3,792   |
LNFT |
30.75 |
116,604.00 |
40.00 |
151,680.00 |
|
|
|
|
| 804-05 |
precast concrete test piles
|
1   |
EACH |
3,200.00 |
3,200.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 804-09 |
loading test piles
|
1   |
EACH |
26,200.00 |
26,200.00 |
2,500.00 |
2,500.00 |
|
|
|
|
| 804-10 |
reloading test piles
|
1   |
EACH |
14,000.00 |
14,000.00 |
500.00 |
500.00 |
|
|
|
|
| 804-11 |
redriving test piles
|
1   |
EACH |
6,000.00 |
6,000.00 |
500.00 |
500.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
25,200.00 |
25,200.00 |
500.00 |
500.00 |
|
|
|
|
| 804-17 |
dynamic monitoring
|
3   |
EACH |
2,300.00 |
6,900.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
23.75 |
CUYD |
1,000.00 |
23,750.00 |
1,000.00 |
23,750.00 |
|
|
|
|
| 805-01-D |
class a concrete (footings)
|
289.71 |
CUYD |
535.00 |
154,994.85 |
230.00 |
66,633.30 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
568.88 |
CUYD |
406.00 |
230,965.28 |
500.00 |
284,440.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
1,111.26 |
CUYD |
600.00 |
666,756.00 |
400.00 |
444,504.00 |
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
5,970.7 |
LNFT |
83.15 |
496,463.70 |
100.00 |
597,070.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
196.00 |
LNFT |
82.00 |
16,072.00 |
125.00 |
24,500.00 |
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
364.0 |
LNFT |
315.00 |
114,660.00 |
350.00 |
127,400.00 |
|
|
|
|
| 805-12-H |
reinforced concrete box culverts (7'x 4')
|
176.0 |
LNFT |
619.50 |
109,032.00 |
450.00 |
79,200.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
454,162   |
LB |
0.67 |
304,288.54 |
0.65 |
295,205.30 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
4,030.00 |
4,030.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
880.00 |
LNFT |
40.00 |
35,200.00 |
35.00 |
30,800.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
877.04 |
SQYD |
141.75 |
124,320.42 |
130.00 |
114,015.20 |
|
|
|
|
| S-001 |
video detection device and connection
|
4   |
ea |
4,240.00 |
16,960.00 |
5,000.00 |
20,000.00 |
|
|
|
|
| S-002 |
video detection system
|
2   |
ea |
11,812.50 |
23,625.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| S-003 |
inclinometer settlement monitoring instrumentation
|
lump |
LUMP |
38,500.00 |
38,500.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| S-101 |
dynamic analysis
|
3   |
EACH |
505.00 |
1,515.00 |
1,000.00 |
3,000.00 |
|
|
|
|
| S-102 |
vertical wick drains
|
428,860   |
LNFT |
0.34 |
145,812.40 |
0.50 |
214,430.00 |
|
|
|
|
| S-103 |
settlement plates (installation & monitoring)
|
6   |
EACH |
1,200.00 |
7,200.00 |
800.00 |
4,800.00 |
|
|
|
|
| S-104 |
cast-in-place revetment (catch basins)
|
1   |
each |
1,100.00 |
1,100.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| S-105 |
variable message sign unit
|
4   |
each |
8,250.00 |
33,000.00 |
15,000.00 |
60,000.00 |
|
|
|
|
| S-106 |
saw cut slab at new right of way line (sta. 117+20,
sta. 123+50) |
100   |
LNFT |
50.00 |
5,000.00 |
33.00 |
3,300.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
17,346,939.41 |
|
IRREGULAR |
|
|
|
|
|