| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
4,177   |
CUYD |
12.50 |
52,212.50 |
13.00 |
54,301.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
4,000   |
CUYD |
10.00 |
40,000.00 |
13.00 |
52,000.00 |
|
|
|
|
| 304-01 |
lime
|
1,557.50 |
TON |
1.00 |
1,557.50 |
106.63 |
166,076.22 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
98,890   |
SQYD |
0.10 |
9,889.00 |
3.08 |
304,581.20 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,841   |
CUYD |
30.00 |
55,230.00 |
30.57 |
56,279.37 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
18,480.0 |
TON |
53.00 |
979,440.00 |
49.50 |
914,760.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
314.2 |
TON |
70.00 |
21,994.00 |
217.11 |
68,215.96 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
70,636   |
SQYD |
2.00 |
141,272.00 |
1.20 |
84,763.20 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,472   |
CUYD |
0.10 |
- 147.20 |
0.10 |
- 147.20 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/cpecp/pccsp/bccsp or cap)
|
64   |
LNFT |
65.00 |
4,160.00 |
65.78 |
4,209.92 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/cpecp/pccsp/bccsp or cap)
|
64   |
LNFT |
75.00 |
4,800.00 |
107.00 |
6,848.00 |
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/cpecp/pccsp/bccsp or cap)
|
368   |
LNFT |
90.00 |
33,120.00 |
138.00 |
50,784.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
16,500.00 |
16,500.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.060 |
MILE |
160.00 |
2,889.60 |
318.00 |
5,743.08 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.947 |
MILE |
150.00 |
2,392.05 |
215.00 |
3,428.60 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
11.353 |
MILE |
1,500.00 |
17,029.50 |
425.00 |
4,825.02 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
14.59 |
ACRE |
600.00 |
8,754.00 |
640.00 |
9,337.60 |
|
|
|
|
| 717-01 |
seeding
|
875   |
LB |
6.50 |
5,687.50 |
3.18 |
2,782.50 |
|
|
|
|
| 718-01 |
fertilizer
|
14,590   |
LB |
0.25 |
3,647.50 |
0.29 |
4,231.10 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 726-01 |
bedding material
|
144.6 |
CUYD |
68.00 |
9,832.80 |
53.00 |
7,663.80 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
144,000.00 |
144,000.00 |
89,000.00 |
89,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
795   |
EACH |
6.50 |
5,167.50 |
4.77 |
3,792.15 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.784 |
MILE |
4,000.00 |
15,136.00 |
1,900.00 |
7,189.60 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.316 |
MILE |
925.00 |
4,917.30 |
690.00 |
3,668.04 |
|
|
|
|
| 735-01 |
mailboxes
|
17   |
EACH |
25.00 |
425.00 |
14.00 |
238.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
15   |
EACH |
125.00 |
1,875.00 |
300.00 |
4,500.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
500.00 |
500.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
13,600.00 |
13,600.00 |
|
|
|
|
| S-001 |
cement treated base course (12" depth)
|
95,358   |
SQYD |
6.55 |
624,594.90 |
5.78 |
551,169.24 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,270,076.45 |
|
2,496,340.40 |
|
|
|
|
|