Letting of 9/29/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 064-05-0079
Parish: LAFOURCHE
Routes: LA 1, LA 24
Description: CUTOFF - LAROSE & LAROSE - L.M. 7.45
Type Const: grading,cold planing asphaltic pavement,cement treated bc (shoulders),superpave
asph concrete pavement,pavement widening,pavement patching, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $3,856,856.82
206487 HUEY STOCKSTILL, INC. $4,070,366.48
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,254      LNFT 3.00 3,762.00 3.00 3,762.00        
203-08 borrow (vehicular measurement) 1,500      CUYD 25.00 37,500.00 14.00 21,000.00        
203-08-A borrow (vehicular measurement)(selected soils) 12,000      CUYD 10.00 120,000.00 14.00 168,000.00        
203-09 geotextile fabric 50      SQYD 4.00 200.00 5.00 250.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
294      CUYD 60.00 17,640.00 44.00 12,936.00        
502-01 superpave asphaltic concrete 49,799.1    TON 45.00 2,240,959.50 44.00 2,191,160.40        
502-01-A superpave asphaltic concrete, paved drives and
turnouts
3,450.0    TON 45.00 155,250.00 44.00 151,800.00        
509-01-A cold planing asphaltic pavement (1.0" thick) 106,224      SQYD 1.00 106,224.00 0.60 63,734.40        
509-01-B cold planing asphaltic pavement (2.0" thick) 41,883      SQYD 1.20 50,259.60 2.00 83,766.00        
509-02 contractor retained reclaimed asphaltic pavement - 2,638      CUYD 10.00 - 26,380.00 5.00 - 13,190.00        
704-01-B guard rail (single thrie beam) (6'-3" post spacing) 50.0    LNFT 32.00 1,600.00 30.00 1,500.00        
704-01-C guard rail (double thrie beam) (3'-1 1/2" post spacing) 137.5    LNFT 43.00 5,912.50 40.00 5,500.00        
704-03 blocked out guard rail 293.8    LNFT 19.00 5,582.20 18.00 5,288.40        
704-05 guard rail anchor section (bct) 12.5    LNFT 70.00 875.00 70.00 875.00        
704-07-A guard rail bridge attachments (single thrie beam) 75.0    LNFT 43.00 3,225.00 40.00 3,000.00        
704-08-B guard rail transitions (double thrie beam) 375.0    LNFT 48.00 18,000.00 50.00 18,750.00        
704-11-A guard rail end treatment (flared) 15      EACH 2,100.00 31,500.00 2,000.00 30,000.00        
711-03-C riprap (30-lb.) 25.0    TON 100.00 2,500.00 80.00 2,000.00        
712-02 sacked concrete revetment 17      SQYD 100.00 1,700.00 150.00 2,550.00        
713-01 temporary signs & barricades lump      LUMP 11,000.00 11,000.00 108,400.00 108,400.00        
713-03-C temporary pavement markings (8" width) 600      LNFT 0.25 150.00 0.10 60.00        
713-03-E temporary pavement markings (24" width) 90      LNFT 0.75 67.50 0.30 27.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
30.912  MILE 150.00 4,636.80 40.00 1,236.48        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
20.400  MILE 5.00 102.00 80.00 1,632.00        
713-05-A temporary pavement markings (solid line)(4" width) 95.028  MILE 15.00 1,425.42 100.00 9,502.80        
724-01-A pavement patching (6" minimum thickness) 1,000      SQYD 25.00 25,000.00 15.00 15,000.00        
724-01-B pavement patching (12" minimum thickness) 7,000      SQYD 25.00 175,000.00 20.00 140,000.00        
724-02 pavement widening 650.0    SQYD 40.00 26,000.00 50.00 32,500.00        
727-01 mobilization lump      LUMP 170,000.00 170,000.00 400,000.00 400,000.00        
729-16-B object marker assembly (type 2) 66      EACH 64.00 4,224.00 60.00 3,960.00        
729-16-C object marker assembly (type 3) 23      EACH 77.00 1,771.00 70.00 1,610.00        
729-19-C dead end road installation (type c) 5      EACH 920.00 4,600.00 900.00 4,500.00        
731-02 reflectorized raised pavement markers 1,395      EACH 5.50 7,672.50 6.00 8,370.00        
732-01-C plastic pavement striping (8" width) 200      LNFT 1.00 200.00 1.00 200.00        
732-01-C-01 plastic pavement striping (8" width) (dashed) 90      LNFT 1.50 135.00 1.00 90.00        
732-01-E plastic pavement striping (24" width) 30      LNFT 4.00 120.00 3.00 90.00        
732-02-A plastic pavement striping (solid line) (4" width) 31.676  MILE 1,800.00 57,016.80 2,000.00 63,352.00        
732-03-A plastic pavement striping (broken line)(4" width) 6.800  MILE 800.00 5,440.00 1,000.00 6,800.00        
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 150.00 600.00 140.00 560.00        
732-04-C plastic pavement legends & symbols (only) 4      EACH 200.00 800.00 160.00 640.00        
735-01 mailboxes 40      EACH 5.00 200.00 6.00 240.00        
735-02 mailbox supports (single) 40      EACH 135.00 5,400.00 150.00 6,000.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00        
741-11 adjusting water valve and meter box 1      EACH 250.00 250.00 200.00 200.00        
S-001 pier protection system 2      EACH 23,400.00 46,800.00 40,000.00 80,000.00        
S-002 remove and reconstruct bridge barrier wall lump      LUMP 10,600.00 10,600.00 20,000.00 20,000.00        
S-003 cement treated base course (12 inch depth) 71,148      SQYD 7.00 498,036.00 5.50 391,314.00        
S-004 rumble strips (ground-in) 19.0    MILE 700.00 13,300.00 600.00 11,400.00        
                       
 CONTRACTOR TOTAL       3,856,856.82   4,070,366.48        