| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - HUEY STOCKSTILL, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,254   |
LNFT |
3.00 |
3,762.00 |
3.00 |
3,762.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
25.00 |
37,500.00 |
14.00 |
21,000.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular measurement)(selected soils)
|
12,000   |
CUYD |
10.00 |
120,000.00 |
14.00 |
168,000.00 |
|
|
|
|
| 203-09 |
geotextile fabric
|
50   |
SQYD |
4.00 |
200.00 |
5.00 |
250.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
294   |
CUYD |
60.00 |
17,640.00 |
44.00 |
12,936.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
49,799.1 |
TON |
45.00 |
2,240,959.50 |
44.00 |
2,191,160.40 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
3,450.0 |
TON |
45.00 |
155,250.00 |
44.00 |
151,800.00 |
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (1.0" thick)
|
106,224   |
SQYD |
1.00 |
106,224.00 |
0.60 |
63,734.40 |
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (2.0" thick)
|
41,883   |
SQYD |
1.20 |
50,259.60 |
2.00 |
83,766.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,638   |
CUYD |
10.00 |
- 26,380.00 |
5.00 |
- 13,190.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam) (6'-3" post spacing)
|
50.0 |
LNFT |
32.00 |
1,600.00 |
30.00 |
1,500.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam) (3'-1 1/2" post spacing)
|
137.5 |
LNFT |
43.00 |
5,912.50 |
40.00 |
5,500.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
293.8 |
LNFT |
19.00 |
5,582.20 |
18.00 |
5,288.40 |
|
|
|
|
| 704-05 |
guard rail anchor section (bct)
|
12.5 |
LNFT |
70.00 |
875.00 |
70.00 |
875.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
43.00 |
3,225.00 |
40.00 |
3,000.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
375.0 |
LNFT |
48.00 |
18,000.00 |
50.00 |
18,750.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
15   |
EACH |
2,100.00 |
31,500.00 |
2,000.00 |
30,000.00 |
|
|
|
|
| 711-03-C |
riprap (30-lb.)
|
25.0 |
TON |
100.00 |
2,500.00 |
80.00 |
2,000.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
17   |
SQYD |
100.00 |
1,700.00 |
150.00 |
2,550.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
11,000.00 |
11,000.00 |
108,400.00 |
108,400.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
600   |
LNFT |
0.25 |
150.00 |
0.10 |
60.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
90   |
LNFT |
0.75 |
67.50 |
0.30 |
27.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
30.912 |
MILE |
150.00 |
4,636.80 |
40.00 |
1,236.48 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
20.400 |
MILE |
5.00 |
102.00 |
80.00 |
1,632.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
95.028 |
MILE |
15.00 |
1,425.42 |
100.00 |
9,502.80 |
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
1,000   |
SQYD |
25.00 |
25,000.00 |
15.00 |
15,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
7,000   |
SQYD |
25.00 |
175,000.00 |
20.00 |
140,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
650.0 |
SQYD |
40.00 |
26,000.00 |
50.00 |
32,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
170,000.00 |
170,000.00 |
400,000.00 |
400,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
66   |
EACH |
64.00 |
4,224.00 |
60.00 |
3,960.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
23   |
EACH |
77.00 |
1,771.00 |
70.00 |
1,610.00 |
|
|
|
|
| 729-19-C |
dead end road installation (type c)
|
5   |
EACH |
920.00 |
4,600.00 |
900.00 |
4,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,395   |
EACH |
5.50 |
7,672.50 |
6.00 |
8,370.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
200   |
LNFT |
1.00 |
200.00 |
1.00 |
200.00 |
|
|
|
|
| 732-01-C-01 |
plastic pavement striping (8" width) (dashed)
|
90   |
LNFT |
1.50 |
135.00 |
1.00 |
90.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
30   |
LNFT |
4.00 |
120.00 |
3.00 |
90.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.676 |
MILE |
1,800.00 |
57,016.80 |
2,000.00 |
63,352.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.800 |
MILE |
800.00 |
5,440.00 |
1,000.00 |
6,800.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
150.00 |
600.00 |
140.00 |
560.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
200.00 |
800.00 |
160.00 |
640.00 |
|
|
|
|
| 735-01 |
mailboxes
|
40   |
EACH |
5.00 |
200.00 |
6.00 |
240.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
40   |
EACH |
135.00 |
5,400.00 |
150.00 |
6,000.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
250.00 |
250.00 |
200.00 |
200.00 |
|
|
|
|
| S-001 |
pier protection system
|
2   |
EACH |
23,400.00 |
46,800.00 |
40,000.00 |
80,000.00 |
|
|
|
|
| S-002 |
remove and reconstruct bridge barrier wall
|
lump |
LUMP |
10,600.00 |
10,600.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-003 |
cement treated base course (12 inch depth)
|
71,148   |
SQYD |
7.00 |
498,036.00 |
5.50 |
391,314.00 |
|
|
|
|
| S-004 |
rumble strips (ground-in)
|
19.0 |
MILE |
700.00 |
13,300.00 |
600.00 |
11,400.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,856,856.82 |
|
4,070,366.48 |
|
|
|
|
|