| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - D & J CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
450   |
CUYD |
23.06 |
10,377.00 |
22.00 |
9,900.00 |
25.00 |
11,250.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
270   |
CUYD |
17.50 |
4,725.00 |
35.00 |
9,450.00 |
40.00 |
10,800.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
10,576.3 |
TON |
44.40 |
469,587.72 |
44.00 |
465,357.20 |
49.00 |
518,238.70 |
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
505.6 |
TON |
102.24 |
51,692.54 |
60.00 |
30,336.00 |
49.00 |
24,774.40 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
86,928   |
SQYD |
0.79 |
68,673.12 |
1.00 |
86,928.00 |
1.00 |
86,928.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,577   |
CUYD |
0.10 |
- 257.70 |
1.00 |
- 2,577.00 |
0.01 |
- 25.77 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
3,900.00 |
3,900.00 |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.375 |
MILE |
320.00 |
2,360.00 |
315.00 |
2,323.12 |
175.00 |
1,290.62 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.686 |
MILE |
214.00 |
1,430.80 |
215.00 |
1,437.49 |
200.00 |
1,337.20 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
17.492 |
MILE |
430.00 |
7,521.56 |
415.00 |
7,259.18 |
285.00 |
4,985.22 |
|
|
| 717-01 |
seeding
|
135   |
LB |
7.48 |
1,009.80 |
7.50 |
1,012.50 |
7.00 |
945.00 |
|
|
| 718-01 |
fertilizer
|
3,000   |
LB |
1.07 |
3,210.00 |
1.10 |
3,300.00 |
1.00 |
3,000.00 |
|
|
| 721-01 |
asphalt mulch
|
2,420   |
GAL |
0.11 |
266.20 |
0.12 |
290.40 |
0.10 |
242.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
100   |
SQYD |
52.58 |
5,258.00 |
50.00 |
5,000.00 |
100.00 |
10,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
3,600   |
SQYD |
51.52 |
185,472.00 |
50.00 |
180,000.00 |
50.00 |
180,000.00 |
|
|
| 724-01-C |
pavement patching (15" minimum thickness)
|
280   |
SQYD |
62.28 |
17,438.40 |
75.00 |
21,000.00 |
125.00 |
35,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
20,700.00 |
20,700.00 |
55,000.00 |
55,000.00 |
39,000.00 |
39,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
487   |
EACH |
4.81 |
2,342.47 |
5.00 |
2,435.00 |
5.00 |
2,435.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.746 |
MILE |
1,914.00 |
16,739.84 |
1,800.00 |
15,742.80 |
1,975.00 |
17,273.35 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.343 |
MILE |
694.00 |
2,320.04 |
700.00 |
2,340.10 |
800.00 |
2,674.40 |
|
|
| 735-01 |
mailboxes
|
84   |
EACH |
14.00 |
1,176.00 |
30.00 |
2,520.00 |
13.00 |
1,092.00 |
|
|
| 735-02 |
mailbox supports (single)
|
45   |
EACH |
230.00 |
10,350.00 |
160.00 |
7,200.00 |
142.00 |
6,390.00 |
|
|
| 735-03 |
mailbox supports (double)
|
15   |
EACH |
220.00 |
3,300.00 |
200.00 |
3,000.00 |
275.00 |
4,125.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
4   |
EACH |
360.00 |
1,440.00 |
275.00 |
1,100.00 |
375.00 |
1,500.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,150.00 |
10,150.00 |
4,000.00 |
4,000.00 |
5,400.00 |
5,400.00 |
|
|
| S-001 |
sawcuts in asphaltic concrete lifts
|
65,412   |
LNFT |
0.53 |
34,668.36 |
0.50 |
32,706.00 |
0.50 |
32,706.00 |
|
|
| S-002 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
58,410   |
LNFT |
0.96 |
56,073.60 |
0.80 |
46,728.00 |
0.90 |
52,569.00 |
|
|
| S-003 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
7,002   |
LNFT |
1.07 |
7,492.14 |
0.90 |
6,301.80 |
1.00 |
7,002.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
999,416.89 |
|
1,005,090.59 |
|
1,068,432.12 |
|
|
|