Letting of 9/29/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 031-08-0020
Parish: BEAUREGARD
Routes: LA 27
Description: WHITE ACRES ROAD TO L.M. 4.65
Type Const: grading, cold planing asphaltic pavement, pavement patching, superpave asphaltic
concrete overlay and related work.
 
RankLicenseBidderAmount
114096 BESSETTE DEVELOPMENT CORP. $1,999,910.77
234356 PRAIRIE CONTRACTORS INC. $2,186,781.75
300183 R. E. HEIDT CONSTRUCTION CO., INC. $2,207,178.71
412487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,684,798.84
 
Item Number Item Description Quantity Unit of Measure - 1 -
BESSETTE DEVELOPMENT CORP.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
R. E. HEIDT CONSTRUCTION CO., INC.
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 600      CUYD 10.65 6,390.00 14.00 8,400.00 19.00 11,400.00 25.00 15,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
7,718      CUYD 38.60 297,914.80 38.00 293,284.00 42.00 324,156.00 45.00 347,310.00
502-01 superpave asphaltic concrete 32,568.0    TON 42.85 1,395,538.80 46.25 1,506,270.00 46.75 1,522,554.00 45.16 1,470,770.88
502-01-A superpave asphaltic concrete, paved drives and
turnouts
555.0    TON 49.50 27,472.50 30.00 16,650.00 80.00 44,400.00 100.00 55,500.00
509-01 cold planing asphaltic pavement 134,016      SQYD 0.48 64,327.68 0.86 115,253.76 0.58 77,729.28 1.50 201,024.00
509-02 contractor retained reclaimed asphaltic pavement - 2,657      CUYD 1.00 - 2,657.00 18.00 - 47,826.00 1.00 - 2,657.00 0.10 - 265.70
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 168.0    LNFT 39.75 6,678.00 55.00 9,240.00 53.00 8,904.00 55.00 9,240.00
704-03 blocked out guard rail 450.0    LNFT 19.25 8,662.50 16.00 7,200.00 18.55 8,347.50 17.00 7,650.00
704-11-A guard rail end treatment (flared) 4      EACH 1,941.25 7,765.00 1,800.00 7,200.00 2,100.00 8,400.00 1,800.00 7,200.00
706-03-C incidental concrete paving (6" thick) 65.8    SQYD 51.00 3,355.80 80.00 5,264.00 90.00 5,922.00 100.00 6,580.00
713-01 temporary signs & barricades lump      LUMP 12,500.00 12,500.00 56,000.00 56,000.00 6,200.00 6,200.00 56,000.00 56,000.00
713-03-E temporary pavement markings (24" width) 150      LNFT 0.95 142.50 1.00 150.00 0.65 97.50 0.75 112.50
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
26.190  MILE 548.50 14,365.21 250.00 6,547.50 250.00 6,547.50 310.00 8,118.90
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
23.244  MILE 260.25 6,049.25 1.00 23.24 212.00 4,927.72 208.00 4,834.75
713-05-A temporary pavement markings (solid line)(4" width) 61.854  MILE 494.45 30,583.71 1.00 61.85 424.00 26,226.09 415.00 25,669.41
724-01-B pavement patching (12" minimum thickness) 1,007      SQYD 38.60 38,870.20 49.00 49,343.00 30.00 30,210.00 80.00 80,560.00
727-01 mobilization lump      LUMP 24,000.00 24,000.00 100,000.00 100,000.00 64,000.00 64,000.00 265,000.00 265,000.00
729-16-B object marker assembly (type 2) 8      EACH 46.90 375.20 100.00 800.00 58.30 466.40 75.00 600.00
729-16-C object marker assembly (type 3) 16      EACH 72.85 1,165.60 80.00 1,280.00 69.00 1,104.00 75.00 1,200.00
731-02 reflectorized raised pavement markers 1,146      EACH 5.15 5,901.90 4.75 5,443.50 4.77 5,466.42 5.00 5,730.00
732-01-E plastic pavement striping (24" width) 50      LNFT 3.05 152.50 3.00 150.00 2.55 127.50 2.50 125.00
732-02-A plastic pavement striping (solid line) (4" width) 20.618  MILE 1,832.00 37,772.17 1,850.00 38,143.30 1,900.00 39,174.20 1,900.00 39,174.20
732-03-A plastic pavement striping (broken line)(4" width) 7.748  MILE 728.75 5,646.35 700.00 5,423.60 700.00 5,423.60 675.00 5,229.90
735-01 mailboxes 20      EACH 1.10 22.00 1.00 20.00 1.10 22.00 14.00 280.00
735-02 mailbox supports (single) 18      EACH 98.95 1,781.10 125.00 2,250.00 130.00 2,340.00 210.00 3,780.00
735-03 mailbox supports (double) 1      EACH 135.00 135.00 200.00 200.00 190.00 190.00 375.00 375.00
740-01 construction layout lump      LUMP 5,000.00 5,000.00 10.00 10.00 5,500.00 5,500.00 68,000.00 68,000.00
                       
 CONTRACTOR TOTAL       1,999,910.77   2,186,781.75   2,207,178.71   2,684,798.84