Letting of 9/29/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 030-03-0015
Parish: WASHINGTON
Routes: LA 21
Description: END OF CONCRETE SECTION - LA 10
Type Const: cleaning and resealing joints, full depth patching, concrete walk, concrete curb
and related work.
 
RankLicenseBidderAmount
121982 FORBY CONTRACTING, INC. $524,824.15
240038 COMMAND CONSTRUCTION LLC $574,513.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
COMMAND CONSTRUCTION LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 96      SQYD 10.00 960.00 10.00 960.00        
202-02-E removal of concrete curbs 220.1    LNFT 5.00 1,100.50 FREE FREE        
202-02-H removal of guard rail 708      LNFT 2.00 1,416.00 2.50 1,770.00        
203-08 borrow (vehicular measurement) 50      CUYD 25.00 1,250.00 20.00 1,000.00        
602-02-A cleaning and resealing existing longitudinal pavement
joints
38,175      LNFT 0.75 28,631.25 1.40 53,445.00        
602-02-B cleaning and resealing existing transverse pavement
joints
34,304      LNFT 0.75 25,728.00 1.40 48,025.60        
602-03 cleaning and sealing random cracks 6,500      LNFT 2.00 13,000.00 2.50 16,250.00        
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
50.0    SQYD 125.00 6,250.00 140.00 7,000.00        
602-05-G-02 full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds)
1,060.0    SQYD 100.00 106,000.00 80.00 84,800.00        
602-05-G-03 full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over)
2,680.0    SQYD 85.00 227,800.00 75.00 201,000.00        
704-03 blocked out guard rail 100.0    LNFT 16.00 1,600.00 17.00 1,700.00        
704-07-A guard rail bridge attachments (single thrie beam) 75.0    LNFT 30.00 2,250.00 30.00 2,250.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 40.00 4,000.00 40.00 4,000.00        
704-11-A guard rail end treatment (flared) 4      EACH 1,850.00 7,400.00 1,900.00 7,600.00        
706-01-A concrete walk (4" thick) 96.0    SQYD 60.00 5,760.00 35.00 3,360.00        
707-01 concrete curb 220.1    LNFT 12.00 2,641.20 20.00 4,402.00        
710-01 flowable fill 50      CUYD 100.00 5,000.00 70.00 3,500.00        
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 15,000.00 15,000.00        
727-01 mobilization lump      LUMP 15,000.00 15,000.00 55,000.00 55,000.00        
729-16-C object marker assembly (type 3) 4      EACH 65.00 260.00 70.00 280.00        
731-02 reflectorized raised pavement markers 4,878      EACH 5.10 24,877.80 7.00 34,146.00        
732-01-C plastic pavement striping (8" width) 1,315      LNFT 0.88 1,157.20 1.00 1,315.00        
732-01-E plastic pavement striping (24" width) 300      LNFT 2.94 882.00 4.00 1,200.00        
732-02-A plastic pavement striping (solid line) (4" width) 9.640  MILE 1,960.00 18,894.40 1,800.00 17,352.00        
732-03-A plastic pavement striping (broken line)(4" width) 4.820  MILE 740.00 3,566.80 1,000.00 4,820.00        
732-05 removal of existing markings 2.410  MILE 3,900.00 9,399.00 1,800.00 4,338.00        
                       
 CONTRACTOR TOTAL       524,824.15   574,513.60        