| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
35,500.00 |
35,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
63   |
SQYD |
10.96 |
690.48 |
12.00 |
756.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
2,412   |
LNFT |
2.19 |
5,282.28 |
15.00 |
36,180.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
3,340   |
CUYD |
11.00 |
36,740.00 |
20.00 |
66,800.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
9,701   |
CUYD |
13.25 |
128,538.25 |
15.00 |
145,515.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
39   |
CUYD |
53.41 |
2,082.99 |
60.00 |
2,340.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,173.5 |
TON |
48.14 |
634,172.29 |
50.00 |
658,675.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
287.3 |
TON |
150.00 |
43,095.00 |
125.00 |
35,912.50 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
55,891   |
SQYD |
2.17 |
121,283.47 |
2.15 |
120,165.65 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
57,702   |
SQYD |
1.43 |
82,513.86 |
2.50 |
144,255.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,088   |
CUYD |
0.10 |
- 208.80 |
0.01 |
- 20.88 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
1,831.2 |
LNFT |
26.31 |
48,178.87 |
24.00 |
43,948.80 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
850.4 |
LNFT |
16.44 |
13,980.57 |
15.00 |
12,756.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
400.0 |
LNFT |
45.00 |
18,000.00 |
41.00 |
16,400.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
EACH |
1,840.00 |
29,440.00 |
1,675.00 |
26,800.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
24.7 |
SQYD |
75.00 |
1,852.50 |
40.00 |
988.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,900.00 |
60,900.00 |
115,000.00 |
115,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
8.270 |
MILE |
330.00 |
2,729.10 |
175.00 |
1,447.25 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.248 |
MILE |
220.00 |
1,814.56 |
300.00 |
2,474.40 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
17.216 |
MILE |
440.00 |
7,575.04 |
250.00 |
4,304.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
5.81 |
ACRE |
712.46 |
4,139.39 |
575.00 |
3,340.75 |
|
|
|
|
| 717-01 |
seeding
|
262   |
LB |
7.67 |
2,009.54 |
6.50 |
1,703.00 |
|
|
|
|
| 718-01 |
fertilizer
|
5,810   |
LB |
0.28 |
1,626.80 |
0.25 |
1,452.50 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
560   |
SQYD |
100.00 |
56,000.00 |
150.00 |
84,000.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,200.0 |
TON |
100.00 |
120,000.00 |
80.00 |
96,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
52.2 |
CUYD |
60.28 |
3,146.61 |
65.00 |
3,393.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
195,000.00 |
195,000.00 |
195,000.00 |
195,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
71.25 |
1,140.00 |
65.00 |
1,040.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
546   |
EACH |
4.93 |
2,691.78 |
6.75 |
3,685.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
8.608 |
MILE |
1,970.00 |
16,957.76 |
2,600.00 |
22,380.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
4.124 |
MILE |
740.00 |
3,051.76 |
850.00 |
3,505.40 |
|
|
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
14.00 |
28.00 |
25.00 |
50.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
345.00 |
690.00 |
125.00 |
250.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
59,900.00 |
59,900.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
35.84 |
CUYD |
660.00 |
23,654.40 |
700.00 |
25,088.00 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
120.0 |
LNFT |
550.00 |
66,000.00 |
375.00 |
45,000.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (3'x 3')
|
24.0 |
LNFT |
440.00 |
10,560.00 |
375.00 |
9,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,690   |
LB |
2.19 |
5,891.10 |
1.50 |
4,035.00 |
|
|
|
|
| S-001 |
clean and reseal stress relief joint
|
216   |
LNFT |
110.00 |
23,760.00 |
70.00 |
15,120.00 |
|
|
|
|
| S-002 |
cement treated base course (8 1/2" depth)
|
40,990   |
SQYD |
8.11 |
332,428.90 |
6.00 |
245,940.00 |
|
|
|
|
| S-003 |
cleaning existing ditches
|
300   |
LNFT |
5.48 |
1,644.00 |
20.00 |
6,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,219,480.50 |
|
2,245,680.67 |
|
|
|
|
|