| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
JAMES CONSTRUCTION GROUP LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
266,000.00 |
266,000.00 |
400,000.00 |
400,000.00 |
600,000.00 |
600,000.00 |
|
|
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
21,000.00 |
21,000.00 |
3,500.00 |
3,500.00 |
37,000.00 |
37,000.00 |
|
|
| 202-02-G |
removal of surfacing and stabilized base
|
15,136.0 |
sq m |
4.61 |
69,776.96 |
3.00 |
45,408.00 |
2.00 |
30,272.00 |
|
|
| 202-02-H |
removal of guard rail
|
375   |
ln m |
8.00 |
3,000.00 |
7.00 |
2,625.00 |
9.00 |
3,375.00 |
|
|
| 202-02-01 |
removal of concrete paved ditches
|
319   |
lm |
3.13 |
998.47 |
8.00 |
2,552.00 |
5.00 |
1,595.00 |
|
|
| 202-02-02 |
removal of headwalls
|
32   |
each |
1,520.00 |
48,640.00 |
1,500.00 |
48,000.00 |
500.00 |
16,000.00 |
|
|
| 202-02-03 |
removal of portion of existing sacked concrete
revetment |
1   |
each |
1,520.00 |
1,520.00 |
2,500.00 |
2,500.00 |
500.00 |
500.00 |
|
|
| 202-02-04 |
removal of 10 m x 14 m wood frame residence on piers
(rt. of sta. 5+100) |
1   |
each |
0.10 |
0.10 |
4,000.00 |
4,000.00 |
500.00 |
500.00 |
|
|
| 202-02-05 |
removal of underground storage tank (propane)(rt. of
sta. 5+115) |
1   |
each |
5,100.00 |
5,100.00 |
1,200.00 |
1,200.00 |
500.00 |
500.00 |
|
|
| 202-02-06 |
removal of 8 m x 12 m wood frame residence on piers
(rt. of sta. 5+315) (contains non-friable asbestos) |
1   |
each |
0.10 |
0.10 |
4,000.00 |
4,000.00 |
500.00 |
500.00 |
|
|
| 202-02-07 |
removal of 9 m x 20 m wood frame residence on piers
(lt. of sta. 9+905) (contains non-friable asbestos) |
1   |
each |
0.10 |
0.10 |
4,000.00 |
4,000.00 |
500.00 |
500.00 |
|
|
| 202-02-08 |
removal of 2.44 m x 2.44 m wood frame sign (lt. of
sta. 6+800) |
1   |
each |
0.10 |
0.10 |
250.00 |
250.00 |
100.00 |
100.00 |
|
|
| 202-02-09 |
removal of 1.83 m x 2.44 m wood frame sign (lt. of
sta. 6+990) |
1   |
each |
0.10 |
0.10 |
250.00 |
250.00 |
100.00 |
100.00 |
|
|
| 202-02-10 |
removal of 6 m round swimming pool (6 m)(sta. 6+990)
|
1   |
each |
0.10 |
0.10 |
250.00 |
250.00 |
100.00 |
100.00 |
|
|
| 203-01 |
general excavation
|
318,369   |
cu m |
2.26 |
719,513.94 |
2.90 |
923,270.10 |
2.00 |
636,738.00 |
|
|
| 203-02 |
drainage excavation
|
4,967   |
cu m |
6.41 |
31,838.47 |
5.00 |
24,835.00 |
6.00 |
29,802.00 |
|
|
| 203-03 |
muck excavation
|
1,500   |
cu m |
15.00 |
22,500.00 |
5.00 |
7,500.00 |
7.00 |
10,500.00 |
|
|
| 203-04 |
embankment
|
585,744   |
cu m |
5.00 |
2,928,720.00 |
5.75 |
3,368,028.00 |
4.50 |
2,635,848.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
224   |
ea |
4.00 |
896.00 |
10.00 |
2,240.00 |
7.00 |
1,568.00 |
|
|
| 204-05-A |
temporary sediment check dam (hay)
|
119   |
ea |
61.00 |
7,259.00 |
150.00 |
17,850.00 |
80.00 |
9,520.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
25   |
ea |
200.00 |
5,000.00 |
400.00 |
10,000.00 |
250.00 |
6,250.00 |
|
|
| 204-06 |
temporary silt fencing
|
6,138   |
ln m |
6.00 |
36,828.00 |
6.00 |
36,828.00 |
4.00 |
24,552.00 |
|
|
| 304-01 |
lime
|
2,418.84 |
Mg |
10.00 |
24,188.40 |
30.00 |
72,565.20 |
56.00 |
135,455.04 |
|
|
| 304-04-D |
lime treatment (type d) (9% by volume) (300 mm thick)
|
159,976   |
sq m |
0.10 |
15,997.60 |
0.30 |
47,992.80 |
0.75 |
119,982.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
74   |
cu m |
92.00 |
6,808.00 |
65.00 |
4,810.00 |
80.00 |
5,920.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
50.00 |
50,000.00 |
40.00 |
40,000.00 |
35.00 |
35,000.00 |
|
|
| 701-01-F |
cross drain pipe (375 mm rcp/pcp)
|
325.2 |
ln m |
111.50 |
36,259.80 |
100.00 |
32,520.00 |
116.00 |
37,723.20 |
|
|
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
96.0 |
ln m |
162.00 |
15,552.00 |
170.00 |
16,320.00 |
170.00 |
16,320.00 |
|
|
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
85.2 |
ln m |
223.00 |
18,999.60 |
215.00 |
18,318.00 |
235.00 |
20,022.00 |
|
|
| 701-01-N |
cross drain pipe (1050 mm rcp/pcp)
|
99.1 |
ln m |
456.00 |
45,189.60 |
340.00 |
33,694.00 |
480.00 |
47,568.00 |
|
|
| 701-02-A |
cross drain pipe arch (375 mm equiv. rcpa)
|
27.7 |
ln m |
131.00 |
3,628.70 |
210.00 |
5,817.00 |
140.00 |
3,878.00 |
|
|
| 701-02-G |
cross drain pipe arch (1050 mm equiv. rcpa)
|
64.4 |
ln m |
506.00 |
32,586.40 |
400.00 |
25,760.00 |
530.00 |
34,132.00 |
|
|
| 701-05-F |
side drain pipe (375 mm)
|
68.0 |
ln m |
81.00 |
5,508.00 |
85.00 |
5,780.00 |
85.00 |
5,780.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
18.0 |
ln m |
111.50 |
2,007.00 |
110.00 |
1,980.00 |
120.00 |
2,160.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
130.0 |
ln m |
137.00 |
17,810.00 |
170.00 |
22,100.00 |
145.00 |
18,850.00 |
|
|
| 701-06-D |
side drain pipe arch(600 mm equiv.)
|
30.0 |
ln m |
193.00 |
5,790.00 |
200.00 |
6,000.00 |
205.00 |
6,150.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
1   |
ea |
1,520.00 |
1,520.00 |
1,000.00 |
1,000.00 |
1,600.00 |
1,600.00 |
|
|
| 701-10-06 |
reinforced concrete pipe (extension)(610 mm)
|
11.7 |
ln m |
198.00 |
2,316.60 |
345.00 |
4,036.50 |
300.00 |
3,510.00 |
|
|
| 701-10-07 |
reinforced concrete pipe (extension)(762 mm)
|
6.9 |
ln m |
278.75 |
1,923.37 |
350.00 |
2,415.00 |
400.00 |
2,760.00 |
|
|
| 701-15 |
concrete collar
|
3   |
ea |
760.00 |
2,280.00 |
1,000.00 |
3,000.00 |
700.00 |
2,100.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
27   |
ea |
2,300.00 |
62,100.00 |
2,400.00 |
64,800.00 |
2,500.00 |
67,500.00 |
|
|
| 702-03-B |
catch basins (cb-02)
|
5   |
ea |
3,000.00 |
15,000.00 |
2,800.00 |
14,000.00 |
3,500.00 |
17,500.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
1   |
ea |
1,115.00 |
1,115.00 |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
2   |
ea |
2,800.00 |
5,600.00 |
2,200.00 |
4,400.00 |
3,000.00 |
6,000.00 |
|
|
| 704-03 |
blocked out guard rail
|
746.78 |
ln m |
52.00 |
38,832.56 |
55.00 |
41,072.90 |
51.00 |
38,085.78 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
106.68 |
ln m |
146.00 |
15,575.28 |
160.00 |
17,068.80 |
144.00 |
15,361.92 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
14   |
ea |
1,725.00 |
24,150.00 |
1,800.00 |
25,200.00 |
1,007.00 |
14,098.00 |
|
|
| 705-02 |
combination mesh and barbed wire fence
|
772   |
ln m |
16.00 |
12,352.00 |
16.00 |
12,352.00 |
16.25 |
12,545.00 |
|
|
| 706-03-C |
incidental concrete paving (150 mm thick)
|
369.0 |
sq m |
51.00 |
18,819.00 |
55.00 |
20,295.00 |
50.00 |
18,450.00 |
|
|
| 708-01 |
right-of-way monument
|
64   |
ea |
92.00 |
5,888.00 |
250.00 |
16,000.00 |
180.00 |
11,520.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
64   |
ea |
92.00 |
5,888.00 |
250.00 |
16,000.00 |
180.00 |
11,520.00 |
|
|
| 711-01-D |
riprap (25 kg x 460 mm thick)
|
8,685   |
sq m |
43.00 |
373,455.00 |
34.00 |
295,290.00 |
34.00 |
295,290.00 |
|
|
| 711-03-D |
riprap (25 kg)
|
1.0 |
Mg |
202.00 |
202.00 |
500.00 |
500.00 |
75.00 |
75.00 |
|
|
| 711-04 |
geotextile fabric
|
8,685   |
sq m |
2.00 |
17,370.00 |
1.50 |
13,027.50 |
2.00 |
17,370.00 |
|
|
| 712-02 |
sacked concrete revetment
|
40   |
sq m |
150.00 |
6,000.00 |
300.00 |
12,000.00 |
90.00 |
3,600.00 |
|
|
| 712-03 |
stone revetment
|
841   |
sq m |
41.00 |
34,481.00 |
50.00 |
42,050.00 |
46.00 |
38,686.00 |
|
|
| 712-04 |
flexible revetment
|
181   |
sq m |
41.00 |
7,421.00 |
60.00 |
10,860.00 |
45.00 |
8,145.00 |
|
|
| 713-01 |
temporary signs and barricades
|
lump |
lump |
72,000.00 |
72,000.00 |
100,000.00 |
100,000.00 |
90,000.00 |
90,000.00 |
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
163   |
ea |
0.35 |
57.05 |
6.00 |
978.00 |
0.35 |
57.05 |
|
|
| 716-01-A |
mulch (vegetative)
|
4.8 |
hec |
1,400.00 |
6,720.00 |
1,500.00 |
7,200.00 |
1,400.00 |
6,720.00 |
|
|
| 717-01 |
seeding
|
1,897   |
kg |
12.00 |
22,764.00 |
13.00 |
24,661.00 |
13.00 |
24,661.00 |
|
|
| 718-01 |
fertilizer
|
62,496   |
kg |
0.45 |
28,123.20 |
0.50 |
31,248.00 |
0.40 |
24,998.40 |
|
|
| 718-02 |
agricultural lime
|
251.0 |
Mg |
81.00 |
20,331.00 |
90.00 |
22,590.00 |
80.00 |
20,080.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
47,935   |
sq m |
1.51 |
72,381.85 |
1.10 |
52,728.50 |
1.10 |
52,728.50 |
|
|
| 720-01-B |
erosion control system, slope protection (type b)
|
20,893   |
sq m |
1.51 |
31,548.43 |
1.10 |
22,982.30 |
1.25 |
26,116.25 |
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,310   |
sq m |
1.31 |
3,026.10 |
1.40 |
3,234.00 |
2.25 |
5,197.50 |
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
6,390   |
sq m |
1.41 |
9,009.90 |
1.50 |
9,585.00 |
2.50 |
15,975.00 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
732   |
sq m |
3.04 |
2,225.28 |
3.30 |
2,415.60 |
3.60 |
2,635.20 |
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
126   |
sq m |
3.04 |
383.04 |
3.30 |
415.80 |
3.60 |
453.60 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
each |
6,800.00 |
6,800.00 |
24,000.00 |
24,000.00 |
35,000.00 |
35,000.00 |
|
|
| 725-01 |
temporary detour roads
|
415.0 |
ln m |
230.00 |
95,450.00 |
325.00 |
134,875.00 |
300.00 |
124,500.00 |
|
|
| 726-01 |
bedding material
|
2,328.9 |
cu m |
45.61 |
106,221.12 |
50.00 |
116,445.00 |
60.00 |
139,734.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
276,000.00 |
276,000.00 |
1,500,000.00 |
1,500,000.00 |
1,500,000.00 |
1,500,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
14   |
ea |
66.00 |
924.00 |
75.00 |
1,050.00 |
65.00 |
910.00 |
|
|
| 731-01 |
non-reflectorized raised pavement markers
|
90   |
ea |
10.14 |
912.60 |
12.00 |
1,080.00 |
10.00 |
900.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,017   |
ea |
5.07 |
15,296.19 |
6.00 |
18,102.00 |
5.00 |
15,085.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
34.955 |
km |
1,126.00 |
39,359.33 |
1,500.00 |
52,432.50 |
1,125.00 |
39,324.37 |
|
|
| 732-02-C |
plastic pavement striping (solid line)(200 mm width)
|
1.521 |
km |
2,650.00 |
4,030.65 |
2,800.00 |
4,258.80 |
2,600.00 |
3,954.60 |
|
|
| 732-02-E |
plastic pavement striping (solid line)(600 mm width)
|
0.890 |
km |
7,900.00 |
7,031.00 |
9,000.00 |
8,010.00 |
7,800.00 |
6,942.00 |
|
|
| 732-03-C-01 |
plastic pavement striping (broken line)(200 mm width)
(preformed marking tape - type v) |
0.090 |
km |
2,500.00 |
225.00 |
4,800.00 |
432.00 |
2,500.00 |
225.00 |
|
|
| 732-04-A |
plastic pavement legends and symbols (arrow)
|
9   |
ea |
127.00 |
1,143.00 |
150.00 |
1,350.00 |
125.00 |
1,125.00 |
|
|
| 732-04-C |
plastic pavement legends and symbols (only)
|
9   |
ea |
127.00 |
1,143.00 |
160.00 |
1,440.00 |
125.00 |
1,125.00 |
|
|
| 735-01 |
mailboxes
|
4   |
ea |
12.00 |
48.00 |
60.00 |
240.00 |
50.00 |
200.00 |
|
|
| 735-02 |
mailbox supports (single)
|
4   |
ea |
180.00 |
720.00 |
175.00 |
700.00 |
250.00 |
1,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
175,000.00 |
175,000.00 |
150,000.00 |
150,000.00 |
65,000.00 |
65,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
lump |
10,000.00 |
10,000.00 |
32,000.00 |
32,000.00 |
5,000.00 |
5,000.00 |
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
630.0 |
ln m |
168.00 |
105,840.00 |
108.00 |
68,040.00 |
135.00 |
85,050.00 |
|
|
| 804-01-F |
precast concrete piles (600 mm)
|
1,520.0 |
ln m |
250.00 |
380,000.00 |
200.00 |
304,000.00 |
200.00 |
304,000.00 |
|
|
| 804-05 |
precast concrete test piles
|
4   |
ea |
24,000.00 |
96,000.00 |
15,000.00 |
60,000.00 |
10,000.00 |
40,000.00 |
|
|
| 804-09 |
loading test pile
|
4   |
ea |
1.00 |
4.00 |
5,000.00 |
20,000.00 |
500.00 |
2,000.00 |
|
|
| 804-10 |
reloading test pile
|
4   |
ea |
1.00 |
4.00 |
100.00 |
400.00 |
500.00 |
2,000.00 |
|
|
| 804-11 |
redriving test pile
|
4   |
ea |
1.00 |
4.00 |
100.00 |
400.00 |
500.00 |
2,000.00 |
|
|
| 804-12 |
loading permanent piles
|
4   |
ea |
1.00 |
4.00 |
5,000.00 |
20,000.00 |
500.00 |
2,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
146.60 |
cu m |
710.00 |
104,086.00 |
1,000.00 |
146,600.00 |
1,000.00 |
146,600.00 |
|
|
| 805-01-F |
class a concrete (bents)
|
222.67 |
cu m |
800.00 |
178,136.00 |
600.00 |
133,602.00 |
600.00 |
133,602.00 |
|
|
| 805-03 |
class aa concrete
|
649.18 |
cu m |
600.00 |
389,508.00 |
600.00 |
389,508.00 |
550.00 |
357,049.00 |
|
|
| 805-08-H |
pre-cast prestressed concrete girder (type quad beam)
|
1,327.20 |
ln m |
272.00 |
360,998.40 |
170.00 |
225,624.00 |
155.00 |
205,716.00 |
|
|
| 805-11 |
strip seal joints
|
72.00 |
ln m |
385.00 |
27,720.00 |
500.00 |
36,000.00 |
300.00 |
21,600.00 |
|
|
| 805-12-Y |
reinforced concrete box culverts (900 mm x 900 mm)
(extension) |
282.80 |
ln m |
810.00 |
229,068.00 |
750.00 |
212,100.00 |
650.00 |
183,820.00 |
|
|
| 805-12-Z |
reinforced concrete box culvert (1829 mm x 1829 mm)
(extension) |
240.90 |
ln m |
1,419.00 |
341,837.10 |
1,200.00 |
289,080.00 |
1,300.00 |
313,170.00 |
|
|
| 805-12-01 |
reinforced concrete box culvert (2438 mm x 2438 mm)
(extension) |
25.40 |
ln m |
1,926.00 |
48,920.40 |
1,800.00 |
45,720.00 |
2,200.00 |
55,880.00 |
|
|
| 805-12-02 |
reinforced concrete box culvert (2743 mm x 2743 mm)
(extension) |
78.00 |
ln m |
2,500.00 |
195,000.00 |
1,900.00 |
148,200.00 |
2,700.00 |
210,600.00 |
|
|
| 805-12-03 |
reinforced concrete box culvert (3048 mm x 3048 mm)
(extension) |
54.60 |
ln m |
3,550.00 |
193,830.00 |
2,000.00 |
109,200.00 |
3,500.00 |
191,100.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
105,304   |
kg |
1.60 |
168,486.40 |
1.55 |
163,221.20 |
1.60 |
168,486.40 |
|
|
| 807-06 |
structural metalwork
|
lump |
lump |
23,000.00 |
23,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
|
|
| 810-01 |
concrete railing (barrier)
|
408.00 |
ln m |
158.00 |
64,464.00 |
150.00 |
61,200.00 |
140.00 |
57,120.00 |
|
|
| 813-01 |
concrete approach slabs
|
1,180.80 |
sq m |
167.00 |
197,193.60 |
155.00 |
183,024.00 |
150.00 |
177,120.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
19.1 |
km |
410.00 |
7,831.00 |
600.00 |
11,460.00 |
476.00 |
9,091.60 |
|
|
| S-002 |
plugging existing water wells
|
2   |
ea |
2,500.00 |
5,000.00 |
4,500.00 |
9,000.00 |
2,500.00 |
5,000.00 |
|
|
| S-003 |
sawcutting existing pavement (75 mm depth)
|
2,021   |
lm |
3.00 |
6,063.00 |
10.00 |
20,210.00 |
10.00 |
20,210.00 |
|
|
| | SUBTOTAL GENERAL |
|
|
|
9,233,076.99 |
|
10,870,153.50 |
|
10,054,539.41 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
roadway surfacing
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-05 |
nonplastic embankment
|
8,060   |
cu m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 302-01 |
class ii base course
|
28,351.9 |
cu m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
13,765.1 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
2,403.0 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
79,808.3 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers and turnouts) |
20,881.2 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
125.0 |
each |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
0.748 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 713-04-B-01 |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) (type i removable) |
1.200 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
1.495 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
2.400 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
10.836 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| 732-03-A-01 |
plastic pavement striping (broken line)(100 mm width)
(preformed marking tape (type v) |
12.009 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 203-05 |
nonplastic embankment
|
8,103   |
cu m |
53.86 |
436,427.58 |
75.00 |
607,725.00 |
65.00 |
526,695.00 |
|
|
| 302-01 |
class ii base course
|
33,351.9 |
cu m |
63.22 |
2,108,507.11 |
66.00 |
2,201,225.40 |
69.00 |
2,301,281.10 |
|
|
| 502-01 |
superpave asphaltic concrete
|
43,158.5 |
Mg |
46.34 |
1,999,964.89 |
46.00 |
1,985,291.00 |
52.00 |
2,244,242.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
10,060.1 |
Mg |
56.89 |
572,319.08 |
55.00 |
553,305.50 |
66.00 |
663,966.60 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
1.948 |
km |
200.00 |
389.60 |
170.00 |
331.16 |
200.00 |
389.60 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
3.895 |
km |
300.00 |
1,168.50 |
330.00 |
1,285.35 |
300.00 |
1,168.50 |
|
|
| 732-03-A |
plastic pavement striping (broken line)((100 mm width)
|
22.845 |
km |
400.00 |
9,138.00 |
550.00 |
12,564.75 |
400.00 |
9,138.00 |
|
|
| | SUBTOTAL ALT A2 |
|
|
|
5,127,914.76 |
|
5,361,728.16 |
|
5,746,880.80 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
14,360,991.75 |
|
16,231,881.66 |
|
IRREGULAR |
|
|
|