Letting of 9/08/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 800-32-0001
Parish: JEFFERSON
Routes:
Description: BAYOU SEGNETTE STATE PARK REPAIR & OVERLAY OF PICNIC AREA
Type Const: grading, base course (stone), superpave asphaltic concrete overlay, pavement patching,
and related work
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $492,267.10
202179 BOH BROS. CONSTRUCTION CO., LLC. $495,806.00
300935 FLEMING CONSTRUCTION CO., INC. $734,287.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
FLEMING CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 586      CUYD 42.00 24,612.00 26.00 15,236.00 35.00 20,510.00    
502-01 superpave asphaltic concrete 6,058.2    TON 58.00 351,375.60 60.00 363,492.00 98.00 593,703.60    
713-01 temporary signs & barricades lump      LUMP 1,000.00 1,000.00 1,000.00 1,000.00 6,000.00 6,000.00    
724-01-B pavement patching (12" minimum thickness) 150      SQYD 60.00 9,000.00 70.00 10,500.00 42.00 6,300.00    
727-01 mobilization lump      LUMP 24,000.00 24,000.00 20,000.00 20,000.00 28,000.00 28,000.00    
732-01-A plastic pavement striping (4" width) 8,387      LNFT 0.90 7,548.30 0.80 6,709.60 1.00 8,387.00    
732-01-E plastic pavement striping (24" width) 500      LNFT 5.50 2,750.00 5.00 2,500.00 5.50 2,750.00    
732-03-A plastic pavement striping (broken line)(4" width) 1.200  MILE 1,000.00 1,200.00 1,000.00 1,200.00 1,100.00 1,320.00    
732-04-A plastic pavement legends & symbols (arrow) 5      EACH 170.00 850.00 160.00 800.00 162.00 810.00    
732-04-F plastic pavement legends & symbols (handicapped) 9      EACH 285.00 2,565.00 260.00 2,340.00 267.00 2,403.00    
740-01 construction layout lump      LUMP 2,000.00 2,000.00 3,000.00 3,000.00 5,500.00 5,500.00    
S-001 remove and reinstall concrete parking barrier 375      EACH 35.00 13,125.00 15.00 5,625.00 24.50 9,187.50    
S-002 concrete parking barriers 120      EACH 45.00 5,400.00 32.00 3,840.00 40.00 4,800.00    
S-003 bollards 30      EACH 150.00 4,500.00 125.00 3,750.00 140.00 4,200.00    
S-004 base course (stone) 962.3    CUYD 44.00 42,341.20 58.00 55,813.40 42.00 40,416.60    
                       
 CONTRACTOR TOTAL       492,267.10   495,806.00   734,287.70    