Lead Project: 744-37-0008
Parish: OUACHITA
Routes:
Description: BAYOU WALK AT UNIVERSITY OF LOUISIANA AT MONROE
Type Const: grading, portland cement concrete sidewalks, boardwalk, landscaping and related
work.
 
RankLicenseBidderAmount
119978 FRANCISE HORTICULTURAL SERVICE, INC $358,956.00
232044 QUALITY DESIGN & CONSTRUCTION, INC. $363,087.44
323029 TRIAD BUILDERS OF RUSTON INC $367,067.40
441051 THE MECO GROUP INC. $381,798.80
25747 KOSTMAYER CONSTRUCTION, LLC IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
FRANCISE HORTICULTURAL SERVICE, INC
- 2 -
QUALITY DESIGN & CONSTRUCTION, INC.
- 3 -
TRIAD BUILDERS OF RUSTON INC
- 4 -
THE MECO GROUP INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 2,500.00 2,500.00 13,612.60 13,612.60 3,200.00 3,200.00 14,000.00 14,000.00
202-01 removal of structures & obstructions lump      LUMP 2,500.00 2,500.00 10,450.60 10,450.60 3,200.00 3,200.00 4,000.00 4,000.00
203-06 excavation & embankment lump      LUMP 2,500.00 2,500.00 26,332.10 26,332.10 6,500.00 6,500.00 7,962.00 7,962.00
203-09 geotextile fabric 655      SQYD 2.00 1,310.00 1.40 917.00 4.00 2,620.00 4.00 2,620.00
706-01-A concrete walk (4" thick) 488.4    SQYD 70.00 34,188.00 50.30 24,566.52 106.00 51,770.40 57.00 27,838.80
713-01 temporary signs & barricades lump      LUMP 2,500.00 2,500.00 4,584.10 4,584.10 3,300.00 3,300.00 1,000.00 1,000.00
717-01 seeding (common bermuda) 315      LB 6.00 1,890.00 8.90 2,803.50 4.00 1,260.00 9.00 2,835.00
719-01-A plants (liquidambar styraciflua 'rotundiloba',
sweetgum, 3.5-4" cal, full canopy, 14'-16'ht)
5      EACH 400.00 2,000.00 742.00 3,710.00 500.00 2,500.00 700.00 3,500.00
719-01-B plants (acer rubrum, red maple, 3.5-4" cal, full
canopy, 14'-16' ht)
11      EACH 400.00 4,400.00 909.50 10,004.50 500.00 5,500.00 800.00 8,800.00
719-01-C plants (taxodium distichum, bald cypress, 2.5-3" cal,
45 gal, full canopy, 12-14' ht)
13      EACH 400.00 5,200.00 316.10 4,109.30 375.00 4,875.00 350.00 4,550.00
719-01-D plants (magnolia grandiflora 'db blanchard',magnolia
'db blanchard',3.5-4" cal, 65 gal, full canopy,
14-16' ht)
8      EACH 400.00 3,200.00 611.00 4,888.00 375.00 3,000.00 500.00 4,000.00
719-01-E plants (betula nigra, river birch, 3.5-4" cal, 45 gal,
full canopy, 14'-16' ht)
13      EACH 400.00 5,200.00 393.80 5,119.40 500.00 6,500.00 350.00 4,550.00
719-01-F plants (pistacia chinensis, chinese pistache, 2.75-3"
cal, 65 gal, full canopy, 14-16' ht)
6      EACH 400.00 2,400.00 540.40 3,242.40 500.00 3,000.00 450.00 2,700.00
719-01-G plants (ilex attenuata 'fosteri', foster holly, 15 gal,
full plant, 6' min ht)
10      EACH 100.00 1,000.00 111.80 1,118.00 180.00 1,800.00 70.00 700.00
719-01-H plants (lirope muscari 'green giant', evergreen giant
liriope, 1 gal, full plant)
205      EACH 6.00 1,230.00 5.70 1,168.50 12.00 2,460.00 6.00 1,230.00
719-01-I plants ('hameln' pennisetum, pennisetum alope 'hameln',
3 gal, full plant)
334      EACH 18.00 6,012.00 12.20 4,074.80 25.00 8,350.00 10.00 3,340.00
719-02-A top dressing mulch (3" depth)(pine straw mulch) 60      SQYD 9.00 540.00 4.50 270.00 6.00 360.00 5.00 300.00
719-02-B top dressing mulch (3" depth)(shredded cypress bark
mulch)
172      SQYD 9.00 1,548.00 5.30 911.60 12.00 2,064.00 6.00 1,032.00
719-03 bed preparation (10" depth) 232      SQYD 9.00 2,088.00 12.80 2,969.60 12.00 2,784.00 10.00 2,320.00
723-01 granular material (net section) 480      CUYD 24.00 11,520.00 13.00 6,240.00 28.00 13,440.00 11.00 5,280.00
730-01 trenching and backfilling 983      LNFT 5.00 4,915.00 13.50 13,270.50 1.00 983.00 2.00 1,966.00
730-02 conduit with conductors (2" dia. rigid galvanized
steel with 3-#10 xhhw, 1-#10 green gnd.)
983      LNFT 5.00 4,915.00 16.60 16,317.80 25.00 24,575.00 15.00 14,745.00
805-01-C class a concrete (retaining walls) 12.00   CUYD 400.00 4,800.00 676.20 8,114.40 1,200.00 14,400.00 325.00 3,900.00
805-01-D class a concrete (footings) 10.00   CUYD 200.00 2,000.00 560.60 5,606.00 800.00 8,000.00 325.00 3,250.00
812-01-A treated timber 5.80   MFBM 12,000.00 69,600.00 2,783.90 16,146.62 1,120.00 6,496.00 3,000.00 17,400.00
S-001 boardwalk 140.0    SQYD 150.00 21,000.00 252.30 35,322.00 280.00 39,200.00 412.00 57,680.00
S-003-A bench 9      EACH 500.00 4,500.00 1,518.40 13,665.60 1,520.00 13,680.00 1,000.00 9,000.00
S-003-B trash receptacle 5      EACH 500.00 2,500.00 1,000.00 5,000.00 1,250.00 6,250.00 700.00 3,500.00
S-003-C bike rack 1      EACH 1,000.00 1,000.00 1,300.20 1,300.20 2,000.00 2,000.00 1,000.00 1,000.00
S-004 specialty pavers at circles 210.0    SQYD 90.00 18,900.00 85.90 18,039.00 60.00 12,600.00 170.00 35,700.00
S-005 lamps 23      EACH 5,700.00 131,100.00 4,313.60 99,212.80 4,800.00 110,400.00 5,700.00 131,100.00
                       
 CONTRACTOR TOTAL       358,956.00   363,087.44   367,067.40   381,798.80
 
Item Number Item Description Quantity Unit of Measure
KOSTMAYER CONSTRUCTION, LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 16,000.00 16,000.00            
202-01 removal of structures & obstructions lump      LUMP 19,000.00 19,000.00            
203-06 excavation & embankment lump      LUMP 19,000.00 19,000.00            
203-09 geotextile fabric 655      SQYD 2.50 1,637.50            
706-01-A concrete walk (4" thick) 488.4    SQYD 8.00 3,907.20            
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00            
717-01 seeding (common bermuda) 315      LB 12.00 3,780.00            
719-01-A plants (liquidambar styraciflua 'rotundiloba',
sweetgum, 3.5-4" cal, full canopy, 14'-16'ht)
5      EACH 910.00 4,550.00            
719-01-B plants (acer rubrum, red maple, 3.5-4" cal, full
canopy, 14'-16' ht)
11      EACH 1,105.00 12,155.00            
719-01-C plants (taxodium distichum, bald cypress, 2.5-3" cal,
45 gal, full canopy, 12-14' ht)
13      EACH 391.00 5,083.00            
719-01-D plants (magnolia grandiflora 'db blanchard',magnolia
'db blanchard',3.5-4" cal, 65 gal, full canopy,
14-16' ht)
8      EACH 770.00 6,160.00            
719-01-E plants (betula nigra, river birch, 3.5-4" cal, 45 gal,
full canopy, 14'-16' ht)
13      EACH 495.00 6,435.00            
719-01-F plants (pistacia chinensis, chinese pistache, 2.75-3"
cal, 65 gal, full canopy, 14-16' ht)
6      EACH 660.00 3,960.00            
719-01-G plants (ilex attenuata 'fosteri', foster holly, 15 gal,
full plant, 6' min ht)
10      EACH 150.00 1,500.00            
719-01-H plants (lirope muscari 'green giant', evergreen giant
liriope, 1 gal, full plant)
205      EACH 8.00 1,640.00            
719-01-I plants ('hameln' pennisetum, pennisetum alope 'hameln',
3 gal, full plant)
334      EACH 18.00 6,012.00            
719-02-A top dressing mulch (3" depth)(pine straw mulch) 60      SQYD 7.00 420.00            
719-02-B top dressing mulch (3" depth)(shredded cypress bark
mulch)
172      SQYD 8.00 1,376.00            
719-03 bed preparation (10" depth) 232      SQYD 18.00 4,176.00            
723-01 granular material (net section) 480      CUYD 60.00 28,800.00            
730-01 trenching and backfilling 983      LNFT 41.00 40,303.00            
730-02 conduit with conductors (2" dia. rigid galvanized
steel with 3-#10 xhhw, 1-#10 green gnd.)
983      LNFT 125.00 122,875.00            
805-01-C class a concrete (retaining walls) 12.00   CUYD 1,250.00 15,000.00            
805-01-D class a concrete (footings) 10.00   CUYD 1,250.00 12,500.00            
812-01-A treated timber 5.80   MFBM 2,600.00 15,080.00            
S-001 boardwalk 140.0    SQYD 90.00 12,600.00            
S-003-A bench 9      EACH 1,400.00 12,600.00            
S-003-B trash receptacle 5      EACH 1,400.00 7,000.00            
S-003-C bike rack 1      EACH 3,800.00 3,800.00            
S-004 specialty pavers at circles 210.0    SQYD 84.00 17,640.00            
S-005 lamps 23      EACH 720.00 16,560.00            
                       