| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - HUEY STOCKSTILL, INC. |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
5,992   |
LNFT |
3.00 |
17,976.00 |
2.50 |
14,980.00 |
3.00 |
17,976.00 |
3.00 |
17,976.00 |
| 203-08 |
borrow (vehicular measurement)
|
9,500   |
CUYD |
12.50 |
118,750.00 |
9.00 |
85,500.00 |
10.00 |
95,000.00 |
20.00 |
190,000.00 |
| 502-01 |
superpave asphaltic concrete
|
110,905.6 |
TON |
41.56 |
4,609,236.73 |
45.00 |
4,990,752.00 |
44.00 |
4,879,846.40 |
50.00 |
5,545,280.00 |
| 509-01 |
cold planing asphaltic pavement
|
381,238   |
SQYD |
1.08 |
411,737.04 |
1.25 |
476,547.50 |
1.35 |
514,671.30 |
1.50 |
571,857.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 10,590   |
CUYD |
0.10 |
- 1,059.00 |
7.00 |
- 74,130.00 |
4.00 |
- 42,360.00 |
10.00 |
- 105,900.00 |
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
116.7 |
SQYD |
130.00 |
15,171.00 |
140.00 |
16,338.00 |
250.00 |
29,175.00 |
200.00 |
23,340.00 |
| 602-11 |
removal of existing shoulder underdrain systems
|
560   |
LNFT |
8.00 |
4,480.00 |
8.60 |
4,816.00 |
3.00 |
1,680.00 |
4.00 |
2,240.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
32   |
LNFT |
103.00 |
3,296.00 |
135.00 |
4,320.00 |
100.00 |
3,200.00 |
110.00 |
3,520.00 |
| 701-15 |
concrete collar
|
125   |
EACH |
600.00 |
75,000.00 |
528.00 |
66,000.00 |
500.00 |
62,500.00 |
525.00 |
65,625.00 |
| 703-01 |
shoulder underdrain systems
|
560   |
LNFT |
12.00 |
6,720.00 |
22.00 |
12,320.00 |
10.00 |
5,600.00 |
7.00 |
3,920.00 |
| 703-02 |
shoulder outlet underdrains
|
5   |
EACH |
900.00 |
4,500.00 |
420.00 |
2,100.00 |
600.00 |
3,000.00 |
400.00 |
2,000.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
1,025.0 |
LNFT |
45.00 |
46,125.00 |
45.00 |
46,125.00 |
50.00 |
51,250.00 |
45.00 |
46,125.00 |
| 704-03 |
blocked out guard rail
|
4,275.0 |
LNFT |
16.50 |
70,537.50 |
16.00 |
68,400.00 |
20.00 |
85,500.00 |
16.00 |
68,400.00 |
| 704-06 |
guard rail anchor sections (trailing end)
|
50.0 |
LNFT |
66.00 |
3,300.00 |
65.00 |
3,250.00 |
72.00 |
3,600.00 |
66.00 |
3,300.00 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
50.0 |
LNFT |
82.00 |
4,100.00 |
80.00 |
4,000.00 |
90.00 |
4,500.00 |
82.00 |
4,100.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
450.0 |
LNFT |
44.00 |
19,800.00 |
45.00 |
20,250.00 |
50.00 |
22,500.00 |
45.00 |
20,250.00 |
| 704-10 |
guard rail anchor block
|
18   |
EACH |
1,000.00 |
18,000.00 |
1,000.00 |
18,000.00 |
1,000.00 |
18,000.00 |
1,000.00 |
18,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
30   |
EACH |
1,750.00 |
52,500.00 |
1,700.00 |
51,000.00 |
2,000.00 |
60,000.00 |
1,750.00 |
52,500.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
2,674.9 |
SQYD |
30.79 |
82,360.17 |
40.00 |
106,996.00 |
40.00 |
106,996.00 |
30.00 |
80,247.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
300,000.00 |
300,000.00 |
40,000.00 |
40,000.00 |
500,000.00 |
500,000.00 |
400,000.00 |
400,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
12,300   |
LNFT |
0.25 |
3,075.00 |
0.85 |
10,455.00 |
0.10 |
1,230.00 |
0.10 |
1,230.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
6,300   |
LNFT |
1.00 |
6,300.00 |
1.25 |
7,875.00 |
0.30 |
1,890.00 |
0.10 |
630.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
96.480 |
MILE |
200.00 |
19,296.00 |
100.00 |
9,648.00 |
50.00 |
4,824.00 |
130.00 |
12,542.40 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
72.360 |
MILE |
200.00 |
14,472.00 |
250.00 |
18,090.00 |
100.00 |
7,236.00 |
10.00 |
723.60 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
178.830 |
MILE |
320.00 |
57,225.60 |
500.00 |
89,415.00 |
200.00 |
35,766.00 |
10.00 |
1,788.30 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
50.00 |
600.00 |
55.00 |
660.00 |
30.00 |
360.00 |
1.00 |
12.00 |
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
6   |
EACH |
50.00 |
300.00 |
80.00 |
480.00 |
30.00 |
180.00 |
1.00 |
6.00 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
12   |
EACH |
55.00 |
660.00 |
55.00 |
660.00 |
30.00 |
360.00 |
1.00 |
12.00 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
20   |
SQYD |
100.00 |
2,000.00 |
75.00 |
1,500.00 |
130.00 |
2,600.00 |
120.00 |
2,400.00 |
| 724-01-C |
pavement patching (18" minimum thickness)
|
500   |
SQYD |
88.00 |
44,000.00 |
80.00 |
40,000.00 |
50.00 |
25,000.00 |
60.00 |
30,000.00 |
| 724-02-C |
pavement widening (10" thick)
|
1,749.7 |
SQYD |
30.00 |
52,491.00 |
40.00 |
69,988.00 |
30.00 |
52,491.00 |
30.00 |
52,491.00 |
| 726-01 |
bedding material
|
12.4 |
CUYD |
46.00 |
570.40 |
50.00 |
620.00 |
60.00 |
744.00 |
60.00 |
744.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
678,000.00 |
678,000.00 |
740,000.00 |
740,000.00 |
808,000.00 |
808,000.00 |
750,000.00 |
750,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
62   |
EACH |
70.00 |
4,340.00 |
70.00 |
4,340.00 |
70.00 |
4,340.00 |
70.00 |
4,340.00 |
| 729-16-C |
object marker assembly (type 3)
|
30   |
EACH |
77.00 |
2,310.00 |
75.00 |
2,250.00 |
80.00 |
2,400.00 |
76.00 |
2,280.00 |
| 731-02 |
reflectorized raised pavement markers
|
5,200   |
EACH |
5.00 |
26,000.00 |
5.00 |
26,000.00 |
6.00 |
31,200.00 |
5.00 |
26,000.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
4,100   |
LNFT |
1.00 |
4,100.00 |
0.88 |
3,608.00 |
1.00 |
4,100.00 |
0.90 |
3,690.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
2,100   |
LNFT |
3.00 |
6,300.00 |
2.95 |
6,195.00 |
4.00 |
8,400.00 |
3.00 |
6,300.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
59.610 |
MILE |
1,000.00 |
59,610.00 |
1,920.00 |
114,451.20 |
2,500.00 |
149,025.00 |
2,000.00 |
119,220.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
24.120 |
MILE |
700.00 |
16,884.00 |
710.00 |
17,125.20 |
1,000.00 |
24,120.00 |
750.00 |
18,090.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
130.00 |
520.00 |
135.00 |
540.00 |
200.00 |
800.00 |
140.00 |
560.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
200.00 |
400.00 |
195.00 |
390.00 |
200.00 |
400.00 |
200.00 |
400.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
150.00 |
600.00 |
145.00 |
580.00 |
200.00 |
800.00 |
150.00 |
600.00 |
| 736-09 |
loop detector
|
1,050   |
LNFT |
10.00 |
10,500.00 |
12.00 |
12,600.00 |
12.00 |
12,600.00 |
10.00 |
10,500.00 |
| 736-10 |
underground junction box
|
5   |
EACH |
400.00 |
2,000.00 |
300.00 |
1,500.00 |
300.00 |
1,500.00 |
225.00 |
1,125.00 |
| 737-03-D |
painted traffic striping (solid line)(12" width)
|
1,000   |
LNFT |
1.00 |
1,000.00 |
2.00 |
2,000.00 |
1.00 |
1,000.00 |
1.00 |
1,000.00 |
| 739-01 |
hydro-seeding
|
33.00 |
ACRE |
800.00 |
26,400.00 |
900.00 |
29,700.00 |
900.00 |
29,700.00 |
800.00 |
26,400.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
159,000.00 |
159,000.00 |
10,000.00 |
10,000.00 |
80,000.00 |
80,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
rumble strips (ground-in)
|
48.2 |
MILE |
625.00 |
30,125.00 |
200.00 |
9,640.00 |
1,000.00 |
48,200.00 |
425.00 |
20,485.00 |
| S-002 |
concrete apron
|
58   |
EACH |
350.00 |
20,300.00 |
800.00 |
46,400.00 |
1,000.00 |
58,000.00 |
1,100.00 |
63,800.00 |
| S-003 |
exposing existing r. c. pipe
|
370   |
LNFT |
20.00 |
7,400.00 |
25.00 |
9,250.00 |
23.00 |
8,510.00 |
30.00 |
11,100.00 |
| S-004 |
variable message sign unit
|
8   |
EACH |
6,000.00 |
48,000.00 |
7,400.00 |
59,200.00 |
10,000.00 |
80,000.00 |
8,000.00 |
64,000.00 |
| S-005 |
relocating existing ditch
|
200.0 |
LNFT |
5.00 |
1,000.00 |
6.00 |
1,200.00 |
25.00 |
5,000.00 |
12.00 |
2,400.00 |
| S-101 |
barrier rail rehabilitation
|
5,320.0 |
LNFT |
35.00 |
186,200.00 |
34.00 |
180,880.00 |
33.00 |
175,560.00 |
35.00 |
186,200.00 |
| S-465 |
one cycle mowing (approximately 272 acres)
|
5   |
EACH |
3,500.00 |
17,500.00 |
3,500.00 |
17,500.00 |
20,000.00 |
100,000.00 |
8,200.00 |
41,000.00 |
| S-466 |
one cycle litter collection (approximately 272 acres)
|
5   |
EACH |
3,500.00 |
17,500.00 |
5,500.00 |
27,500.00 |
3,000.00 |
15,000.00 |
4,200.00 |
21,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,389,509.44 |
|
7,529,804.90 |
|
8,203,970.70 |
|
8,515,849.30 |
|