| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COASTAL BRIDGE CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
2,700   |
SQYD |
12.00 |
32,400.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
4,212   |
SQYD |
8.00 |
33,696.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
155.0 |
LNFT |
5.00 |
775.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
4,697.0 |
SQYD |
8.00 |
37,576.00 |
|
|
|
|
|
|
| 202-02-I |
removal and/or reinstallation of existing signal
equipment and related items |
lump |
LUMP |
8,875.00 |
8,875.00 |
|
|
|
|
|
|
| 203-06 |
excavation and embankment
|
lump |
LUMP |
600,000.00 |
600,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
560   |
EACH |
10.00 |
5,600.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
100.00 |
800.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
6,400   |
LNFT |
2.00 |
12,800.00 |
|
|
|
|
|
|
| 302-02-E |
class ii base course (8" thick)
|
19,590.9 |
SQYD |
40.00 |
783,636.00 |
|
|
|
|
|
|
| 304-01 |
lime
|
138.85 |
TON |
150.00 |
20,827.50 |
|
|
|
|
|
|
| 304-04-D |
lime slurry treatment (type d) (12" thick)
|
9,796   |
SQYD |
2.00 |
19,592.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
40.00 |
40,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,655.6 |
TON |
70.00 |
745,892.00 |
|
|
|
|
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
4,662.6 |
SQYD |
50.00 |
233,130.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
2,332   |
LNFT |
52.00 |
121,264.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
490   |
LNFT |
56.00 |
27,440.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
678   |
LNFT |
64.00 |
43,392.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
389   |
LNFT |
82.00 |
31,898.00 |
|
|
|
|
|
|
| 701-04-D |
storm drain pipe arch (24" equiv. rcpa)
|
222   |
LNFT |
72.00 |
15,984.00 |
|
|
|
|
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
71   |
LNFT |
90.00 |
6,390.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
16   |
LNFT |
56.00 |
896.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
248   |
LNFT |
64.00 |
15,872.00 |
|
|
|
|
|
|
| 701-06-A |
side drain pipe arch (15" equiv.)
|
56   |
LNFT |
58.00 |
3,248.00 |
|
|
|
|
|
|
| 701-09 |
fabricating pipe fittings
|
2   |
EACH |
1,800.00 |
3,600.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
14   |
EACH |
1,850.00 |
25,900.00 |
|
|
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
47   |
EACH |
2,500.00 |
117,500.00 |
|
|
|
|
|
|
| 702-03-C-01 |
catch basins (cb-06 mod)
|
3   |
EACH |
4,000.00 |
12,000.00 |
|
|
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
3   |
EACH |
3,600.00 |
10,800.00 |
|
|
|
|
|
|
| 702-03-F |
catch basins (cb-08)
|
1   |
EACH |
5,200.00 |
5,200.00 |
|
|
|
|
|
|
| 702-03-G |
catch basins (cb-09)
|
4   |
EACH |
3,000.00 |
12,000.00 |
|
|
|
|
|
|
| 702-03-I |
catch basins (paved gutter drain)
|
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
7   |
EACH |
1,000.00 |
7,000.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
1,200.00 |
1,200.00 |
|
|
|
|
|
|
| 703-01 |
shoulder underdrain systems
|
564   |
LNFT |
15.00 |
8,460.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
200.2 |
LNFT |
40.00 |
8,008.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
462.7 |
LNFT |
16.00 |
7,403.20 |
|
|
|
|
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
4   |
EACH |
5,500.00 |
22,000.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
1,193.4 |
SQYD |
40.00 |
47,736.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,751.8 |
SQYD |
50.00 |
87,590.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
2,803.5 |
LNFT |
10.00 |
28,035.00 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
8,274.8 |
LNFT |
20.00 |
165,496.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
175,000.00 |
175,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
4,946   |
LNFT |
0.20 |
989.20 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
2,878   |
LNFT |
0.40 |
1,151.20 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
684   |
LNFT |
1.20 |
820.80 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.097 |
MILE |
10,000.00 |
970.00 |
|
|
|
|
|
|
| 713-04-C |
temporary pavement markings (broken line)(4" width)(3'
length) |
0.454 |
MILE |
5,000.00 |
2,270.00 |
|
|
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
13   |
EACH |
80.00 |
1,040.00 |
|
|
|
|
|
|
| 713-06-B |
temporary pavement legends and symbols (double arrow)
|
2   |
EACH |
150.00 |
300.00 |
|
|
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
129   |
LB |
15.00 |
1,935.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
826   |
SQYD |
2.00 |
1,652.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
463.3 |
CUYD |
60.00 |
27,798.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
500,000.00 |
500,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
1,142.0 |
SQFT |
20.00 |
22,840.00 |
|
|
|
|
|
|
| 729-02 |
sign (type b)
|
61.2 |
SQFT |
20.00 |
1,224.00 |
|
|
|
|
|
|
| 729-04 |
sign (type d)
|
213.0 |
SQFT |
21.00 |
4,473.00 |
|
|
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
716.0 |
SQFT |
21.00 |
15,036.00 |
|
|
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
25   |
EACH |
675.00 |
16,875.00 |
|
|
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
13   |
EACH |
785.00 |
10,205.00 |
|
|
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
8   |
EACH |
875.00 |
7,000.00 |
|
|
|
|
|
|
| 729-11 |
mounting (overhead cantilever)(ground mounted)
|
1   |
EACH |
33,750.00 |
33,750.00 |
|
|
|
|
|
|
| 729-11-A |
mounting (overhead double cantilever)(ground mounted)
(monotube) |
3   |
EACH |
51,225.00 |
153,675.00 |
|
|
|
|
|
|
| 729-20 |
footings for overhead mountings (type a)
|
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 729-20-A |
footings for overhead mountings (type b)
|
3   |
EACH |
5,000.00 |
15,000.00 |
|
|
|
|
|
|
| 729-21 |
u-channel post
|
3   |
EACH |
75.00 |
225.00 |
|
|
|
|
|
|
| 730-01 |
trenching and backfilling
|
1,540   |
LNFT |
2.00 |
3,080.00 |
|
|
|
|
|
|
| 730-02-A |
conduit with conductors (1 1/4"c, 3-#6)
|
870   |
LNFT |
2.25 |
1,957.50 |
|
|
|
|
|
|
| 730-02-B |
conduit with conductors (1 1/4"c, 3-#4)
|
1,280   |
LNFT |
4.65 |
5,952.00 |
|
|
|
|
|
|
| 730-02-C |
conduit with conductors (2"c, pullstring)
|
1,940   |
LNFT |
1.20 |
2,328.00 |
|
|
|
|
|
|
| 730-04 |
jacking or bored casing (8" sched. 80 pvc)
|
560   |
LNFT |
36.00 |
20,160.00 |
|
|
|
|
|
|
| 730-08 |
electrical service point (pedestal)
|
2   |
EACH |
5,410.00 |
10,820.00 |
|
|
|
|
|
|
| 730-16 |
underground junction box (13" x 24")
|
14   |
EACH |
410.00 |
5,740.00 |
|
|
|
|
|
|
| 730-18 |
service pole
|
2   |
EACH |
605.00 |
1,210.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
765   |
EACH |
5.00 |
3,825.00 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
845   |
LNFT |
0.45 |
380.25 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
4,493   |
LNFT |
0.85 |
3,819.05 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
986   |
LNFT |
3.00 |
2,958.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.765 |
MILE |
2,000.00 |
7,530.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.504 |
MILE |
850.00 |
1,278.40 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
33   |
EACH |
150.00 |
4,950.00 |
|
|
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
7   |
EACH |
210.00 |
1,470.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
30   |
EACH |
130.00 |
3,900.00 |
|
|
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (yield line)
|
1   |
EACH |
300.00 |
300.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
1.00 |
6.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
200.00 |
1,200.00 |
|
|
|
|
|
|
| 736-01 |
trenching and backfilling
|
2,775   |
LNFT |
2.25 |
6,243.75 |
|
|
|
|
|
|
| 736-03-A |
jacked or bored conduit (2" pec)
|
460   |
LNFT |
12.50 |
5,750.00 |
|
|
|
|
|
|
| 736-03-B |
jacked or bored conduit (2" hdpe)
|
1,290   |
LNFT |
12.50 |
16,125.00 |
|
|
|
|
|
|
| 736-03-C |
jacked or bored conduit (3" pec)
|
2,345   |
LNFT |
17.00 |
39,865.00 |
|
|
|
|
|
|
| 736-04-A |
signal support, 25' mast arm
|
3   |
EACH |
5,705.00 |
17,115.00 |
|
|
|
|
|
|
| 736-04-B |
signal support, 30' mast arm
|
1   |
EACH |
6,055.00 |
6,055.00 |
|
|
|
|
|
|
| 736-04-C |
signal support, 35' mast arm
|
1   |
EACH |
6,870.00 |
6,870.00 |
|
|
|
|
|
|
| 736-04-D |
signal support, 40' mast arm
|
2   |
EACH |
7,295.00 |
14,590.00 |
|
|
|
|
|
|
| 736-04-E |
signal support, 45' mast arm
|
1   |
EACH |
7,725.00 |
7,725.00 |
|
|
|
|
|
|
| 736-04-F |
signal support, 60' mast arm
|
3   |
EACH |
12,390.00 |
37,170.00 |
|
|
|
|
|
|
| 736-04-G |
signal support, 55', 10' dual mast arm
|
1   |
EACH |
14,625.00 |
14,625.00 |
|
|
|
|
|
|
| 736-04-H |
signal support, 50', 50' dual mast arm
|
1   |
EACH |
14,085.00 |
14,085.00 |
|
|
|
|
|
|
| 736-04-I |
signal support, 40' class 3 cca wood pole
|
10   |
EACH |
725.00 |
7,250.00 |
|
|
|
|
|
|
| 736-05-A |
signal heads (led, 3 section, 12" lenses, r,y,g)
|
22   |
EACH |
795.00 |
17,490.00 |
|
|
|
|
|
|
| 736-05-B |
signal heads (incandescent, 3 section, 12" lenses,
r,y,g) |
12   |
EACH |
472.00 |
5,664.00 |
|
|
|
|
|
|
| 736-05-C |
signal heads (optically programmed led, 3 section, 12"
lenses, r,y,g) |
4   |
EACH |
3,150.00 |
12,600.00 |
|
|
|
|
|
|
| 736-05-D |
signal heads (led, 3 section, 12" lenses, r,lty,ltg)
|
11   |
EACH |
675.00 |
7,425.00 |
|
|
|
|
|
|
| 736-05-E |
signal heads(incandecent, 3 section, 12" lenses,
r,lt,y,ltg) |
10   |
EACH |
485.00 |
4,850.00 |
|
|
|
|
|
|
| 736-05-F |
signal heads (led, 3 section, 12" lenses, r,rty,y,rtg)
|
3   |
EACH |
700.00 |
2,100.00 |
|
|
|
|
|
|
| 736-05-G |
signal heads (incandecent, 3 section, 12" lenses,
r,rty,rtg) |
2   |
EACH |
485.00 |
970.00 |
|
|
|
|
|
|
| 736-05-H |
signal heads (led, 3 section 12" lenses, rtr,rty,rtg)
|
2   |
EACH |
700.00 |
1,400.00 |
|
|
|
|
|
|
| 736-05-I |
signal heads (incandecent, 3 section, 12" lenses,
rtr,rty,rtg) |
2   |
EACH |
490.00 |
980.00 |
|
|
|
|
|
|
| 736-05-J |
signal heads (led, 4 section, 12" lenses, r,y,ltg,g)
|
2   |
EACH |
1,035.00 |
2,070.00 |
|
|
|
|
|
|
| 736-05-K |
signal heads (incandecent, 4 section, 12" lenses,
r,y,ltg,g) |
3   |
EACH |
590.00 |
1,770.00 |
|
|
|
|
|
|
| 736-05-L |
signal heads (incandecent, 4 section, 12" lenses,
r,y,rtg,g) |
1   |
EACH |
590.00 |
590.00 |
|
|
|
|
|
|
| 736-05-M |
signal heads (led, 5 section, 12" lenses,
r,y,rty,g,rtg) |
2   |
EACH |
1,230.00 |
2,460.00 |
|
|
|
|
|
|
| 736-05-N |
signal heads (incandecent, 5 section, 12" lenses,
r,y,rty,g,rtg) |
4   |
EACH |
649.00 |
2,596.00 |
|
|
|
|
|
|
| 736-06 |
signal service (modified power pedestal)
|
2   |
EACH |
1,425.00 |
2,850.00 |
|
|
|
|
|
|
| 736-08 |
signal controller
|
1   |
EACH |
18,980.00 |
18,980.00 |
|
|
|
|
|
|
| 736-09 |
loop detector
|
427   |
LNFT |
9.00 |
3,843.00 |
|
|
|
|
|
|
| 736-10-A |
underground junction box (type "e")
|
7   |
EACH |
426.00 |
2,982.00 |
|
|
|
|
|
|
| 736-10-B |
underground junction box (type "f")
|
21   |
EACH |
540.00 |
11,340.00 |
|
|
|
|
|
|
| 736-10-C |
underground junction box (type "g")
|
3   |
EACH |
835.00 |
2,505.00 |
|
|
|
|
|
|
| 736-10-D |
underground junction box (type "h")
|
5   |
EACH |
1,145.00 |
5,725.00 |
|
|
|
|
|
|
| 736-10-E |
underground junction box (type "j")
|
1   |
EACH |
1,365.00 |
1,365.00 |
|
|
|
|
|
|
| 736-11-A |
conduit (1/2" pec)
|
70   |
LNFT |
1.65 |
115.50 |
|
|
|
|
|
|
| 736-11-B |
conduit (1" pec)
|
1,365   |
LNFT |
2.00 |
2,730.00 |
|
|
|
|
|
|
| 736-11-C |
conduit (2" pec)
|
620   |
LNFT |
3.15 |
1,953.00 |
|
|
|
|
|
|
| 736-11-D |
conduit (2" hdpe)
|
100   |
LNFT |
3.15 |
315.00 |
|
|
|
|
|
|
| 736-11-E |
conduit (3" pec)
|
620   |
LNFT |
5.25 |
3,255.00 |
|
|
|
|
|
|
| 736-12-A |
conductor, 6c (signal / #14 awg)
|
2,395   |
LNFT |
1.25 |
2,993.75 |
|
|
|
|
|
|
| 736-12-B |
conductor, 10c (signal / #14 awg)
|
19,465   |
LNFT |
1.70 |
33,090.50 |
|
|
|
|
|
|
| 736-12-C |
conductor, 3c (power/ #6 awg)
|
780   |
LNFT |
2.35 |
1,833.00 |
|
|
|
|
|
|
| 736-12-D |
conductor, 2c (loop lead-in / #14 awg)
|
2,060   |
LNFT |
0.90 |
1,854.00 |
|
|
|
|
|
|
| 736-12-E |
conductor, 3c (street sign cable / #14 awg)
|
2,270   |
LNFT |
1.00 |
2,270.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
4.50 |
ACRE |
1,000.00 |
4,500.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
125,000.00 |
125,000.00 |
|
|
|
|
|
|
| S-001 |
unidirectional optical detector signal channel
|
17   |
EACH |
585.00 |
9,945.00 |
|
|
|
|
|
|
| S-002 |
optical cable
|
7,435   |
LNFT |
1.20 |
8,922.00 |
|
|
|
|
|
|
| S-003 |
phase selector
|
5   |
EACH |
3,400.00 |
17,000.00 |
|
|
|
|
|
|
| S-004 |
video detector device and connection
|
16   |
EACH |
3,985.00 |
63,760.00 |
|
|
|
|
|
|
| S-005 |
video detection system (temp. jefferson @ airline)
|
1   |
EACH |
6,895.00 |
6,895.00 |
|
|
|
|
|
|
| S-006 |
video detection system (final jefferson @ airline)
|
1   |
EACH |
6,245.00 |
6,245.00 |
|
|
|
|
|
|
| S-007 |
video detection system (temp. siegen @ airline)
|
1   |
EACH |
35,545.00 |
35,545.00 |
|
|
|
|
|
|
| S-008 |
video detection system (final siegen @ airline)
|
1   |
EACH |
5,500.00 |
5,500.00 |
|
|
|
|
|
|
| S-009 |
street name sign
|
10   |
EACH |
531.00 |
5,310.00 |
|
|
|
|
|
|
| S-010 |
thirty-six fiber (24 mulit-mode and 12 sigle mode
fibers) (communication cable/ fiber optic) |
4,000   |
LNFT |
5.00 |
20,000.00 |
|
|
|
|
|
|
| S-011 |
six fiber (4 mulit-mode and 2 sigle mode fibers)
(communication drop cable/ fiber optic) |
350   |
LNFT |
3.65 |
1,277.50 |
|
|
|
|
|
|
| S-012 |
riser, 3" diameter
|
5   |
EACH |
515.00 |
2,575.00 |
|
|
|
|
|
|
| S-013 |
telephone service
|
1   |
EACH |
700.00 |
700.00 |
|
|
|
|
|
|
| S-014 |
signal battery back-up system
|
1   |
EACH |
8,750.00 |
8,750.00 |
|
|
|
|
|
|
| S-015 |
signal ts-2 type 2 controller ts-2 type 1 cabinet
(siegen) |
1   |
EACH |
21,650.00 |
21,650.00 |
|
|
|
|
|
|
| S-016 |
signal ts-2 type 2 controller ts-2 type 6 cabinet
(jefferson & sherwood common) |
2   |
EACH |
19,575.00 |
39,150.00 |
|
|
|
|
|
|
| S-017 |
sawing and sealing longitudinal and transverse joints
in asphalt overlay |
1,546   |
LNFT |
2.00 |
3,092.00 |
|
|
|
|
|
|
| S-018 |
luminaire (1000w, hps, floodlight)
|
30   |
EACH |
865.00 |
25,950.00 |
|
|
|
|
|
|
| S-019 |
high mast pole (100' steel)
|
5   |
EACH |
29,970.00 |
149,850.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,465,455.10 |
|
|
|
|
|
|
|