Lead Project: 744-62-0004
Parish: W CARROLL
Routes: LA 2, LA 17
Description: OAK GROVE SIDEWALKS AND LIGHTING
Type Const: concrete sidewalks, lighting, and related work
 
RankLicenseBidderAmount
123029 TRIAD BUILDERS OF RUSTON INC $152,314.00
241051 THE MECO GROUP INC. $155,484.00
303046 WALKER & WELLS CONTRACTORS, INC. $169,311.40
415099 AMETHYST CONSTRUCTION, INC. $185,300.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
TRIAD BUILDERS OF RUSTON INC
- 2 -
THE MECO GROUP INC.
- 3 -
WALKER & WELLS CONTRACTORS, INC.
- 4 -
AMETHYST CONSTRUCTION, INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1,200.00 1,200.00 1,000.00 1,000.00 5,200.00 5,200.00 8,000.00 8,000.00
202-02-E removal of concrete curbs 119.0    LNFT 11.00 1,309.00 10.00 1,190.00 14.00 1,666.00 15.00 1,785.00
202-02-01 removal of mailbox post (rt. of sta 11+25) 1      EACH 350.00 350.00 100.00 100.00 100.00 100.00 200.00 200.00
202-03-01 relocation of mailbox & mailbox post (rt. of sta 10+26) 1      EACH 600.00 600.00 100.00 100.00 300.00 300.00 800.00 800.00
706-01-A concrete walk (4" thick) 319.0    SQYD 49.00 15,631.00 58.00 18,502.00 77.00 24,563.00 75.00 23,925.00
706-01-C concrete walk (6" thick) 7.6    SQYD 60.00 456.00 70.00 532.00 84.00 638.40 125.00 950.00
707-01 concrete curb 32.0    LNFT 24.00 768.00 10.00 320.00 28.00 896.00 70.00 2,240.00
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00 1,000.00 1,000.00 9,500.00 9,500.00 20,000.00 20,000.00
727-01 mobilization lump      LUMP 27,000.00 27,000.00 26,000.00 26,000.00 16,800.00 16,800.00 20,000.00 20,000.00
730-05 light pole (10' cast aluminum) (decorative) 16      EACH 1,300.00 20,800.00 1,700.00 27,200.00 2,100.00 33,600.00 2,000.00 32,000.00
730-07 luminaire (175 watt mercury vapor) 16      EACH 1,300.00 20,800.00 800.00 12,800.00 910.00 14,560.00 1,000.00 16,000.00
730-09 electrical system lump      LUMP 36,000.00 36,000.00 45,000.00 45,000.00 30,600.00 30,600.00 27,000.00 27,000.00
732-01-E plastic pavement striping (24" width) 52      LNFT 100.00 5,200.00 20.00 1,040.00 214.00 11,128.00 100.00 5,200.00
740-01 construction layout lump      LUMP 3,500.00 3,500.00 1,000.00 1,000.00 2,160.00 2,160.00 5,000.00 5,000.00
S-001 steel plate (catch basin @ sta 18+72) lump      LUMP 1,000.00 1,000.00 1,200.00 1,200.00 1,400.00 1,400.00 4,500.00 4,500.00
S-002 steel handrail lump      LUMP 2,100.00 2,100.00 2,500.00 2,500.00 5,000.00 5,000.00 6,500.00 6,500.00
S-003 light pole foundation w/ break-a-way base 16      EACH 600.00 9,600.00 1,000.00 16,000.00 700.00 11,200.00 700.00 11,200.00
                       
 CONTRACTOR TOTAL       152,314.00   155,484.00   169,311.40   185,300.00