| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - TRIAD BUILDERS OF RUSTON INC |
- 2 - THE MECO GROUP INC. |
- 3 - WALKER & WELLS CONTRACTORS, INC. |
- 4 - AMETHYST CONSTRUCTION, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,200.00 |
1,200.00 |
1,000.00 |
1,000.00 |
5,200.00 |
5,200.00 |
8,000.00 |
8,000.00 |
| 202-02-E |
removal of concrete curbs
|
119.0 |
LNFT |
11.00 |
1,309.00 |
10.00 |
1,190.00 |
14.00 |
1,666.00 |
15.00 |
1,785.00 |
| 202-02-01 |
removal of mailbox post (rt. of sta 11+25)
|
1   |
EACH |
350.00 |
350.00 |
100.00 |
100.00 |
100.00 |
100.00 |
200.00 |
200.00 |
| 202-03-01 |
relocation of mailbox & mailbox post (rt. of sta 10+26)
|
1   |
EACH |
600.00 |
600.00 |
100.00 |
100.00 |
300.00 |
300.00 |
800.00 |
800.00 |
| 706-01-A |
concrete walk (4" thick)
|
319.0 |
SQYD |
49.00 |
15,631.00 |
58.00 |
18,502.00 |
77.00 |
24,563.00 |
75.00 |
23,925.00 |
| 706-01-C |
concrete walk (6" thick)
|
7.6 |
SQYD |
60.00 |
456.00 |
70.00 |
532.00 |
84.00 |
638.40 |
125.00 |
950.00 |
| 707-01 |
concrete curb
|
32.0 |
LNFT |
24.00 |
768.00 |
10.00 |
320.00 |
28.00 |
896.00 |
70.00 |
2,240.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
6,000.00 |
6,000.00 |
1,000.00 |
1,000.00 |
9,500.00 |
9,500.00 |
20,000.00 |
20,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
27,000.00 |
27,000.00 |
26,000.00 |
26,000.00 |
16,800.00 |
16,800.00 |
20,000.00 |
20,000.00 |
| 730-05 |
light pole (10' cast aluminum) (decorative)
|
16   |
EACH |
1,300.00 |
20,800.00 |
1,700.00 |
27,200.00 |
2,100.00 |
33,600.00 |
2,000.00 |
32,000.00 |
| 730-07 |
luminaire (175 watt mercury vapor)
|
16   |
EACH |
1,300.00 |
20,800.00 |
800.00 |
12,800.00 |
910.00 |
14,560.00 |
1,000.00 |
16,000.00 |
| 730-09 |
electrical system
|
lump |
LUMP |
36,000.00 |
36,000.00 |
45,000.00 |
45,000.00 |
30,600.00 |
30,600.00 |
27,000.00 |
27,000.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
52   |
LNFT |
100.00 |
5,200.00 |
20.00 |
1,040.00 |
214.00 |
11,128.00 |
100.00 |
5,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
3,500.00 |
3,500.00 |
1,000.00 |
1,000.00 |
2,160.00 |
2,160.00 |
5,000.00 |
5,000.00 |
| S-001 |
steel plate (catch basin @ sta 18+72)
|
lump |
LUMP |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
1,400.00 |
1,400.00 |
4,500.00 |
4,500.00 |
| S-002 |
steel handrail
|
lump |
LUMP |
2,100.00 |
2,100.00 |
2,500.00 |
2,500.00 |
5,000.00 |
5,000.00 |
6,500.00 |
6,500.00 |
| S-003 |
light pole foundation w/ break-a-way base
|
16   |
EACH |
600.00 |
9,600.00 |
1,000.00 |
16,000.00 |
700.00 |
11,200.00 |
700.00 |
11,200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
152,314.00 |
|
155,484.00 |
|
169,311.40 |
|
185,300.00 |
|