| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - "K" CONSTRUCTION, INC. |
- 2 - CYCLE CONSTRUCTION CO. L.L.C. |
- 3 - TBC, LTD. |
- 4 - SHAVERS-WHITTLE CONSTRUCTION INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1.00 |
1.00 |
1,100.00 |
1,100.00 |
11,900.00 |
11,900.00 |
6,500.00 |
6,500.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1.00 |
1.00 |
800.00 |
800.00 |
660.00 |
660.00 |
2,900.00 |
2,900.00 |
| 202-02-A |
removal of bridges
|
1   |
EACH |
16,000.00 |
16,000.00 |
5,400.00 |
5,400.00 |
8,048.00 |
8,048.00 |
3,500.00 |
3,500.00 |
| 202-02-D |
removal of concrete walks & drives
|
82   |
SQYD |
18.00 |
1,476.00 |
8.00 |
656.00 |
38.00 |
3,116.00 |
28.00 |
2,296.00 |
| 202-03-A |
relocation of fence
|
16   |
LNFT |
1.00 |
16.00 |
60.00 |
960.00 |
48.00 |
768.00 |
12.00 |
192.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
1.00 |
1.00 |
12,500.00 |
12,500.00 |
14,200.00 |
14,200.00 |
35,000.00 |
35,000.00 |
| 701-01-G |
cross drain pipe (18" rcp)
|
32   |
LNFT |
60.00 |
1,920.00 |
90.00 |
2,880.00 |
70.00 |
2,240.00 |
42.00 |
1,344.00 |
| 701-02-B |
cross drain pipe arch (18" equiv. rcpa)
|
24   |
LNFT |
60.00 |
1,440.00 |
98.00 |
2,352.00 |
77.00 |
1,848.00 |
105.00 |
2,520.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,800.00 |
2,800.00 |
2,800.00 |
2,800.00 |
2,800.00 |
2,800.00 |
| 706-01-A |
concrete walk (4" thick)
|
1,617.6 |
SQYD |
50.00 |
80,880.00 |
41.00 |
66,321.60 |
41.50 |
67,130.40 |
46.50 |
75,218.40 |
| 706-01-C |
concrete walk (6" thick)
|
37.8 |
SQYD |
50.00 |
1,890.00 |
66.00 |
2,494.80 |
45.00 |
1,701.00 |
85.00 |
3,213.00 |
| 706-01-D |
concrete walk (8" thick)
|
34.0 |
SQYD |
50.00 |
1,700.00 |
72.00 |
2,448.00 |
48.50 |
1,649.00 |
95.00 |
3,230.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
1.00 |
1.00 |
3,500.00 |
3,500.00 |
11,600.00 |
11,600.00 |
3,500.00 |
3,500.00 |
| 723-01 |
granular material (net section)
|
272   |
CUYD |
25.00 |
6,800.00 |
17.00 |
4,624.00 |
39.00 |
10,608.00 |
50.00 |
13,600.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
1.00 |
1.00 |
23,000.00 |
23,000.00 |
14,000.00 |
14,000.00 |
6,500.00 |
6,500.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
673   |
LNFT |
5.25 |
3,533.25 |
6.00 |
4,038.00 |
6.00 |
4,038.00 |
5.00 |
3,365.00 |
| S-001 |
precast concrete arch bridge (including headwall,
handrails, sidewalk and backfill) |
lump |
LUMP |
90,000.00 |
90,000.00 |
83,500.00 |
83,500.00 |
68,000.00 |
68,000.00 |
67,000.00 |
67,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
207,660.25 |
|
219,374.40 |
|
224,306.40 |
|
232,678.40 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KOSTMAYER CONSTRUCTION, LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
42,000.00 |
42,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
9,000.00 |
9,000.00 |
|
|
|
|
|
|
| 202-02-A |
removal of bridges
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
82   |
SQYD |
12.00 |
984.00 |
|
|
|
|
|
|
| 202-03-A |
relocation of fence
|
16   |
LNFT |
48.00 |
768.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
18,000.00 |
18,000.00 |
|
|
|
|
|
|
| 701-01-G |
cross drain pipe (18" rcp)
|
32   |
LNFT |
50.00 |
1,600.00 |
|
|
|
|
|
|
| 701-02-B |
cross drain pipe arch (18" equiv. rcpa)
|
24   |
LNFT |
65.00 |
1,560.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,617.6 |
SQYD |
38.00 |
61,468.80 |
|
|
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
37.8 |
SQYD |
44.00 |
1,663.20 |
|
|
|
|
|
|
| 706-01-D |
concrete walk (8" thick)
|
34.0 |
SQYD |
65.00 |
2,210.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,400.00 |
5,400.00 |
|
|
|
|
|
|
| 723-01 |
granular material (net section)
|
272   |
CUYD |
60.00 |
16,320.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
673   |
LNFT |
6.00 |
4,038.00 |
|
|
|
|
|
|
| S-001 |
precast concrete arch bridge (including headwall,
handrails, sidewalk and backfill) |
lump |
LUMP |
73,000.00 |
73,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
272,012.00 |
|
|
|
|
|
|
|