| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - ATWOOD FENCE COMPANY INC. |
- 2 - UNITED RENTALS HWY TECHNOLOGIES INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
7,853   |
LNFT |
2.00 |
15,706.00 |
3.35 |
26,307.55 |
|
|
|
|
| 202-02-I |
removal of paved ditches
|
600   |
SQYD |
5.00 |
3,000.00 |
5.50 |
3,300.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
7,850   |
CUYD |
17.30 |
135,805.00 |
19.25 |
151,112.50 |
|
|
|
|
| 703-02 |
shoulder outlet underdrains
|
10   |
EACH |
750.00 |
7,500.00 |
825.00 |
8,250.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
275.0 |
LNFT |
30.00 |
8,250.00 |
32.25 |
8,868.75 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
4,712.5 |
LNFT |
28.00 |
131,950.00 |
27.00 |
127,237.50 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
237.5 |
LNFT |
35.00 |
8,312.50 |
39.00 |
9,262.50 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
8,450.3 |
LNFT |
15.00 |
126,754.50 |
15.50 |
130,979.65 |
|
|
|
|
| 704-06 |
guard rail anchor sections (trailing end)
|
37.5 |
LNFT |
55.00 |
2,062.50 |
60.00 |
2,250.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
81.3 |
LNFT |
65.00 |
5,284.50 |
65.00 |
5,284.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
850.0 |
LNFT |
40.00 |
34,000.00 |
36.00 |
30,600.00 |
|
|
|
|
| 704-10 |
guard rail anchor blocks
|
2   |
ea |
1,400.00 |
2,800.00 |
2,780.00 |
5,560.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
51   |
EACH |
1,500.00 |
76,500.00 |
1,600.00 |
81,600.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
1,950.00 |
3,900.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
2,089.1 |
SQYD |
30.00 |
62,673.00 |
33.35 |
69,671.48 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
472   |
SQYD |
45.00 |
21,240.00 |
50.00 |
23,600.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
38,000.00 |
38,000.00 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
1,820   |
SQYD |
2.00 |
3,640.00 |
4.25 |
7,735.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
49,500.00 |
49,500.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
61   |
EACH |
75.00 |
4,575.00 |
65.00 |
3,965.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
4.60 |
ACRE |
2,500.00 |
11,500.00 |
1,075.00 |
4,945.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
26,000.00 |
26,000.00 |
|
|
|
|
| S-101 |
pier protection system
|
4   |
EACH |
20,000.00 |
80,000.00 |
22,250.00 |
89,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
820,453.00 |
|
909,029.43 |
|
|
|
|
|