Letting of 7/28/2004 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 737-90-0038
Parish: ST JOHN, ST TAMMANY, TANGIPAHOA
Routes: I-10, I-12, I-55
Description: GUARD RAIL REPLACEMENT PROGRAM (DISTRICT 62)
Type Const: guard rail replacement and related work.
 
RankLicenseBidderAmount
138764 ATWOOD FENCE COMPANY INC. $820,453.00
223811 UNITED RENTALS HWY TECHNOLOGIES INC $909,029.43
 
Item Number Item Description Quantity Unit of Measure - 1 -
ATWOOD FENCE COMPANY INC.
- 2 -
UNITED RENTALS HWY TECHNOLOGIES INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 7,853      LNFT 2.00 15,706.00 3.35 26,307.55        
202-02-I removal of paved ditches 600      SQYD 5.00 3,000.00 5.50 3,300.00        
203-08 borrow (vehicular measurement) 7,850      CUYD 17.30 135,805.00 19.25 151,112.50        
703-02 shoulder outlet underdrains 10      EACH 750.00 7,500.00 825.00 8,250.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 275.0    LNFT 30.00 8,250.00 32.25 8,868.75        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 4,712.5    LNFT 28.00 131,950.00 27.00 127,237.50        
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 237.5    LNFT 35.00 8,312.50 39.00 9,262.50        
704-03 blocked out guard rail 8,450.3    LNFT 15.00 126,754.50 15.50 130,979.65        
704-06 guard rail anchor sections (trailing end) 37.5    LNFT 55.00 2,062.50 60.00 2,250.00        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
81.3    LNFT 65.00 5,284.50 65.00 5,284.50        
704-08-B guard rail transitions (double thrie beam) 850.0    LNFT 40.00 34,000.00 36.00 30,600.00        
704-10 guard rail anchor blocks 2      ea 1,400.00 2,800.00 2,780.00 5,560.00        
704-11-A guard rail end treatment (flared) 51      EACH 1,500.00 76,500.00 1,600.00 81,600.00        
704-11-B guard rail end treatment (tangent) 2      EACH 1,950.00 3,900.00 3,000.00 6,000.00        
706-03-A incidental concrete paving (4" thick) 2,089.1    SQYD 30.00 62,673.00 33.35 69,671.48        
712-01-A concrete cast-in-place revetment (4" thick) 472      SQYD 45.00 21,240.00 50.00 23,600.00        
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 38,000.00 38,000.00        
720-01-A erosion control system, slope protection (type a) 1,820      SQYD 2.00 3,640.00 4.25 7,735.00        
727-01 mobilization lump      LUMP 35,000.00 35,000.00 49,500.00 49,500.00        
729-16-C object marker assembly (type 3) 61      EACH 75.00 4,575.00 65.00 3,965.00        
739-01 hydro-seeding 4.60   ACRE 2,500.00 11,500.00 1,075.00 4,945.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 26,000.00 26,000.00        
S-101 pier protection system 4      EACH 20,000.00 80,000.00 22,250.00 89,000.00        
                       
 CONTRACTOR TOTAL       820,453.00   909,029.43        