| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GUINN BROTHERS, LLC. |
- 3 - KOSTMAYER CONSTRUCTION, LLC |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
21,000.00 |
21,000.00 |
12,500.00 |
12,500.00 |
19,000.00 |
19,000.00 |
60,000.00 |
60,000.00 |
| 202-02-A-01 |
removal of bridge sta. 10+150.008(4.88m w. x 13.54m l.
timber bridge & railing) |
1   |
ea |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
5,500.00 |
5,500.00 |
25,000.00 |
25,000.00 |
| 202-02-A-02 |
removal of bridge sta. 10+151.996(7.010m w. x 25.549m
l. timber bridge & railing) |
1   |
ea |
6,500.00 |
6,500.00 |
8,000.00 |
8,000.00 |
6,000.00 |
6,000.00 |
30,000.00 |
30,000.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
35,000.00 |
35,000.00 |
56,000.00 |
56,000.00 |
50,000.00 |
50,000.00 |
45,000.00 |
45,000.00 |
| 204-02 |
temporary hay or straw bales
|
80   |
ea |
10.00 |
800.00 |
10.00 |
800.00 |
11.00 |
880.00 |
15.00 |
1,200.00 |
| 204-03 |
temporary slope drains
|
150   |
ln m |
1.00 |
150.00 |
10.00 |
1,500.00 |
41.00 |
6,150.00 |
20.00 |
3,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
14   |
ea |
150.00 |
2,100.00 |
100.00 |
1,400.00 |
120.00 |
1,680.00 |
150.00 |
2,100.00 |
| 204-06 |
temporary silt fencing
|
220   |
ln m |
7.50 |
1,650.00 |
4.00 |
880.00 |
5.00 |
1,100.00 |
8.00 |
1,760.00 |
| 302-01-A |
class ii base course(stone)
|
596.4 |
cu m |
85.00 |
50,694.00 |
85.00 |
50,694.00 |
60.00 |
35,784.00 |
65.00 |
38,766.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
88   |
cu m |
100.00 |
8,800.00 |
85.00 |
7,480.00 |
60.00 |
5,280.00 |
50.00 |
4,400.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
cu m |
100.00 |
5,000.00 |
60.00 |
3,000.00 |
60.00 |
3,000.00 |
35.00 |
1,750.00 |
| 502-01 |
superpave asphaltic concrete
|
576.0 |
Mg |
135.00 |
77,760.00 |
90.00 |
51,840.00 |
160.00 |
92,160.00 |
90.00 |
51,840.00 |
| 701-05-I |
side drain pipe (600 mm)
|
12.0 |
ln m |
105.00 |
1,260.00 |
145.00 |
1,740.00 |
66.00 |
792.00 |
275.00 |
3,300.00 |
| 701-05-I-01 |
side drain pipe (600 mm)(erosion)
|
117.2 |
ln m |
105.00 |
12,306.00 |
145.00 |
16,994.00 |
66.00 |
7,735.20 |
110.00 |
12,892.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
143.00 |
8,717.28 |
155.00 |
9,448.80 |
185.00 |
11,277.60 |
150.00 |
9,144.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
60.96 |
ln m |
88.00 |
5,364.48 |
95.00 |
5,791.20 |
160.00 |
9,753.60 |
100.00 |
6,096.00 |
| 705-01 |
barbed wire fence
|
156   |
ln m |
17.00 |
2,652.00 |
15.00 |
2,340.00 |
22.00 |
3,432.00 |
27.50 |
4,290.00 |
| 711-01-D |
riprap (25 kg, 460mm thick)
|
695   |
sq m |
48.00 |
33,360.00 |
55.00 |
38,225.00 |
31.00 |
21,545.00 |
50.00 |
34,750.00 |
| 711-04 |
geotextile fabric
|
695   |
sq m |
2.50 |
1,737.50 |
4.00 |
2,780.00 |
6.00 |
4,170.00 |
2.20 |
1,529.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
13,500.00 |
13,500.00 |
13,500.00 |
13,500.00 |
9,000.00 |
9,000.00 |
11,500.00 |
11,500.00 |
| 727-01 |
mobilization
|
lump |
lump |
13,500.00 |
13,500.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
ea |
70.00 |
1,120.00 |
80.00 |
1,280.00 |
90.00 |
1,440.00 |
75.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
lump |
6,500.00 |
6,500.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
657.0 |
ln m |
98.00 |
64,386.00 |
135.00 |
88,695.00 |
130.00 |
85,410.00 |
115.00 |
75,555.00 |
| 804-12 |
loading permanent piles
|
2   |
ea |
1.00 |
2.00 |
1.00 |
2.00 |
100.00 |
200.00 |
100.00 |
200.00 |
| 805-10-A |
bridge superstructure & substructure (7.3m rdwy.
90 degree xing, curved, cast-in-place) |
4   |
span |
18,500.00 |
74,000.00 |
20,000.00 |
80,000.00 |
20,000.00 |
80,000.00 |
25,000.00 |
100,000.00 |
| 805-10-B |
bridge superstructure & substructure (7.3m rdwy.
90 degree xing) |
5   |
span |
18,500.00 |
92,500.00 |
19,000.00 |
95,000.00 |
20,000.00 |
100,000.00 |
25,000.00 |
125,000.00 |
| S-101 |
concrete approach slabs (7.3m rdwy. 90 degree xing,
curved,) |
2   |
ea |
6,500.00 |
13,000.00 |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
6,500.00 |
13,000.00 |
| S-102 |
concrete approach slabs (7.3m rdwy. 90 degree xing)
|
2   |
ea |
6,500.00 |
13,000.00 |
6,500.00 |
13,000.00 |
7,000.00 |
14,000.00 |
6,500.00 |
13,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
571,359.26 |
|
640,390.00 |
|
659,289.40 |
|
776,272.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - JAMES CONSTRUCTION GROUP LLC |
C,W & W CONTRACTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
50,000.00 |
50,000.00 |
42,000.00 |
42,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge sta. 10+150.008(4.88m w. x 13.54m l.
timber bridge & railing) |
1   |
ea |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge sta. 10+151.996(7.010m w. x 25.549m
l. timber bridge & railing) |
1   |
ea |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
104,000.00 |
104,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
80   |
ea |
8.00 |
640.00 |
10.00 |
800.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
150   |
ln m |
10.00 |
1,500.00 |
20.00 |
3,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
14   |
ea |
125.00 |
1,750.00 |
140.00 |
1,960.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
220   |
ln m |
5.00 |
1,100.00 |
80.00 |
17,600.00 |
|
|
|
|
| 302-01-A |
class ii base course(stone)
|
596.4 |
cu m |
120.00 |
71,568.00 |
60.00 |
35,784.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
88   |
cu m |
100.00 |
8,800.00 |
45.00 |
3,960.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
cu m |
175.00 |
8,750.00 |
65.00 |
3,250.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
576.0 |
Mg |
170.00 |
97,920.00 |
195.00 |
112,320.00 |
|
|
|
|
| 701-05-I |
side drain pipe (600 mm)
|
12.0 |
ln m |
200.00 |
2,400.00 |
135.00 |
1,620.00 |
|
|
|
|
| 701-05-I-01 |
side drain pipe (600 mm)(erosion)
|
117.2 |
ln m |
200.00 |
23,440.00 |
115.00 |
13,478.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
60.96 |
ln m |
150.00 |
9,144.00 |
175.00 |
10,668.00 |
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
60.96 |
ln m |
90.00 |
5,486.40 |
115.00 |
7,010.40 |
|
|
|
|
| 705-01 |
barbed wire fence
|
156   |
ln m |
20.00 |
3,120.00 |
13.00 |
2,028.00 |
|
|
|
|
| 711-01-D |
riprap (25 kg, 460mm thick)
|
695   |
sq m |
50.00 |
34,750.00 |
50.00 |
34,750.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
695   |
sq m |
3.00 |
2,085.00 |
2.00 |
1,390.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
89,000.00 |
89,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
16   |
ea |
70.00 |
1,120.00 |
112.00 |
1,792.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
15,000.00 |
15,000.00 |
22,000.00 |
22,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
657.0 |
ln m |
140.00 |
91,980.00 |
185.00 |
121,545.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (7.3m rdwy.
90 degree xing, curved, cast-in-place) |
4   |
span |
20,000.00 |
80,000.00 |
20,000.00 |
80,000.00 |
|
|
|
|
| 805-10-B |
bridge superstructure & substructure (7.3m rdwy.
90 degree xing) |
5   |
span |
20,000.00 |
100,000.00 |
18,000.00 |
90,000.00 |
|
|
|
|
| S-101 |
concrete approach slabs (7.3m rdwy. 90 degree xing,
curved,) |
2   |
ea |
7,600.00 |
15,200.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| S-102 |
concrete approach slabs (7.3m rdwy. 90 degree xing)
|
2   |
ea |
7,000.00 |
14,000.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
898,753.40 |
|
IRREGULAR |
|
|
|
|
|