| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - KOSTMAYER CONSTRUCTION, LLC |
- 3 - GUINN BROTHERS, LLC. |
- 4 - F. MILLER & SONS, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
20,000.00 |
20,000.00 |
14,000.00 |
14,000.00 |
18,000.00 |
18,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridges (sta.3+000 - 6.10 m x 10.93 m
timber bridge with guard rails) |
1   |
ea |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
3,500.00 |
3,500.00 |
3,900.00 |
3,900.00 |
| 202-02-A-02 |
removal of bridges (sta.2+981.95 - 5.75 m x 4.12 m
timer bridge with guard rails) |
1   |
ea |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
2,000.00 |
2,000.00 |
3,900.00 |
3,900.00 |
| 202-02-A-03 |
removal of bridges (sta. 3+000 - 5.46 m x 9.51 m
timber bridge) |
1   |
ea |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
3,500.00 |
3,500.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,116.0 |
sq m |
2.00 |
2,232.00 |
3.50 |
3,906.00 |
4.00 |
4,464.00 |
5.00 |
5,580.00 |
| 203-06 |
excavation & embankment
|
lump |
lump |
35,000.00 |
35,000.00 |
55,706.00 |
55,706.00 |
42,000.00 |
42,000.00 |
106,000.00 |
106,000.00 |
| 204-02 |
temporary hay or straw bales
|
150   |
ea |
5.00 |
750.00 |
10.00 |
1,500.00 |
10.00 |
1,500.00 |
7.00 |
1,050.00 |
| 204-03 |
temporary slope drains
|
50   |
ln m |
15.00 |
750.00 |
40.00 |
2,000.00 |
10.00 |
500.00 |
14.00 |
700.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
ea |
150.00 |
1,200.00 |
110.00 |
880.00 |
100.00 |
800.00 |
131.00 |
1,048.00 |
| 204-06 |
temporary silt fencing
|
130   |
ln m |
8.00 |
1,040.00 |
5.00 |
650.00 |
4.00 |
520.00 |
5.00 |
650.00 |
| 302-01 |
class ii base course
|
262.5 |
cu m |
85.00 |
22,312.50 |
50.00 |
13,125.00 |
85.00 |
22,312.50 |
67.00 |
17,587.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
22   |
cu m |
100.00 |
2,200.00 |
55.00 |
1,210.00 |
100.00 |
2,200.00 |
67.00 |
1,474.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
93.2 |
cu m |
100.00 |
9,320.00 |
55.00 |
5,126.00 |
75.00 |
6,990.00 |
63.00 |
5,871.60 |
| 502-01 |
superpave asphaltic concrete
|
251.6 |
Mg |
130.00 |
32,708.00 |
160.00 |
40,256.00 |
120.00 |
30,192.00 |
162.00 |
40,759.20 |
| 701-01-S |
cross drain pipe (1800 mm rcp)
|
37.2 |
ln m |
825.00 |
30,690.00 |
1,100.00 |
40,920.00 |
1,250.00 |
46,500.00 |
1,100.00 |
40,920.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
143.00 |
4,358.64 |
150.00 |
4,572.00 |
155.00 |
4,724.40 |
130.00 |
3,962.40 |
| 704-09 |
guard rail anchor sections (turndown)
|
30.48 |
ln m |
86.00 |
2,621.28 |
115.00 |
3,505.20 |
95.00 |
2,895.60 |
100.00 |
3,048.00 |
| 712-04 |
flexible revetment
|
271   |
sq m |
50.00 |
13,550.00 |
53.00 |
14,363.00 |
58.00 |
15,718.00 |
44.00 |
11,924.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
13,500.00 |
13,500.00 |
14,500.00 |
14,500.00 |
12,500.00 |
12,500.00 |
24,000.00 |
24,000.00 |
| 726-01 |
bedding material
|
94.1 |
cu m |
65.00 |
6,116.50 |
55.00 |
5,175.50 |
80.00 |
7,528.00 |
80.00 |
7,528.00 |
| 727-01 |
mobilization
|
lump |
lump |
14,000.00 |
14,000.00 |
50,000.00 |
50,000.00 |
65,000.00 |
65,000.00 |
43,000.00 |
43,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
65.00 |
260.00 |
61.00 |
244.00 |
65.00 |
260.00 |
58.00 |
232.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
66.00 |
528.00 |
72.00 |
576.00 |
80.00 |
640.00 |
68.00 |
544.00 |
| 740-01 |
construction layout
|
lump |
lump |
6,500.00 |
6,500.00 |
19,000.00 |
19,000.00 |
6,000.00 |
6,000.00 |
7,100.00 |
7,100.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
252.0 |
ln m |
150.00 |
37,800.00 |
123.00 |
30,996.00 |
135.00 |
34,020.00 |
123.00 |
30,996.00 |
| 804-12 |
loading permanent piles
|
1   |
ea |
1.00 |
1.00 |
100.00 |
100.00 |
1.00 |
1.00 |
100.00 |
100.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
42.22 |
cu m |
1,000.00 |
42,220.00 |
900.00 |
37,998.00 |
1,200.00 |
50,664.00 |
670.00 |
28,287.40 |
| 805-10-A |
bridge superstructure & substructure (7.3 m clr rdwy;
90 deg x-ing; c.i.p. only) |
3   |
span |
20,000.00 |
60,000.00 |
20,000.00 |
60,000.00 |
20,000.00 |
60,000.00 |
19,800.00 |
59,400.00 |
| 806-01 |
deformed reinforcing steel
|
1,716   |
kg |
3.00 |
5,148.00 |
2.85 |
4,890.60 |
2.00 |
3,432.00 |
2.00 |
3,432.00 |
| S-101 |
concrete approach slabs (7.3 m clr rdwy; 90 degree
x-ing; c.i.p. only) |
2   |
ea |
6,800.00 |
13,600.00 |
6,000.00 |
12,000.00 |
6,500.00 |
13,000.00 |
5,900.00 |
11,800.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
393,405.92 |
|
450,699.30 |
|
461,361.50 |
|
489,794.10 |
|