| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RMK CONSTRUCTION CO. LLC |
- 2 - JOHN BAILEY, INC. |
- 3 - QUALITY CONSTR. SPECIALISTS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 204-06 |
temporary silt fencing
|
586   |
LNFT |
1.50 |
879.00 |
2.00 |
1,172.00 |
2.00 |
1,172.00 |
|
|
| 601-03-C |
portland cement concrete shoulder (6" thick)
|
248.5 |
SQYD |
45.00 |
11,182.50 |
65.00 |
16,152.50 |
47.00 |
11,679.50 |
|
|
| 703-03 |
perforated pipe underdrains
|
72   |
LNFT |
3.00 |
216.00 |
30.00 |
2,160.00 |
10.00 |
720.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
2,375   |
SQYD |
30.00 |
71,250.00 |
36.00 |
85,500.00 |
40.00 |
95,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.578 |
MILE |
3,000.00 |
1,734.00 |
2,850.00 |
1,647.30 |
2,860.00 |
1,653.08 |
|
|
| 713-09 |
temporary precast concrete barrier
|
70   |
EACH |
250.00 |
17,500.00 |
50.00 |
3,500.00 |
350.00 |
24,500.00 |
|
|
| 726-01-A |
bedding material (linear foot)
|
515.9 |
LNFT |
5.00 |
2,579.50 |
8.00 |
4,127.20 |
10.50 |
5,416.95 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.559 |
MILE |
5,000.00 |
2,795.00 |
4,900.00 |
2,739.10 |
4,950.00 |
2,767.05 |
|
|
| 732-05 |
removal of existing markings
|
0.559 |
MILE |
4,000.00 |
2,236.00 |
3,800.00 |
2,124.20 |
3,850.00 |
2,152.15 |
|
|
| 732-05-A |
removal of temporary pavement markings
|
0.578 |
MILE |
4,000.00 |
2,312.00 |
3,800.00 |
2,196.40 |
3,850.00 |
2,225.30 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
8,900.00 |
8,900.00 |
2,000.00 |
2,000.00 |
|
|
| S-002 |
variable message sign unit
|
2   |
EACH |
3,500.00 |
7,000.00 |
3,500.00 |
7,000.00 |
3,500.00 |
7,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
147,684.00 |
|
154,718.70 |
|
181,286.03 |
|
|
|