Letting of 7/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 428-01-0014
Parish: ST JAMES
Routes: LA 3127
Description: LA 70- ST JAMES LINE & ASCENSION LINE - BURTON ROAD
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
pavement patching, and related work.
 
RankLicenseBidderAmount
106276 BARRIERE CONSTRUCTION CO., LLC $1,789,027.60
200481 COASTAL BRIDGE CO., L.L.C. $1,877,307.06
300046 BARBER BROS. CONTRACTING CO., L.L.C $1,896,544.15
400849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,995,751.82
512487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,806,125.07
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
BARBER BROS. CONTRACTING CO., L.L.C
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 3,098      CUYD 10.00 30,980.00 1.00 3,098.00 12.00 37,176.00 8.50 26,333.00
502-01 superpave asphaltic concrete 31,578.8    TON 41.00 1,294,730.80 42.00 1,326,309.60 45.00 1,421,046.00 42.00 1,326,309.60
502-01-A superpave asphaltic concrete, paved drives and
turnouts
49.9    TON 120.00 5,988.00 70.00 3,493.00 100.00 4,990.00 100.00 4,990.00
509-01 cold planing asphaltic pavement 133,017      SQYD 1.20 159,620.40 2.60 345,844.20 1.25 166,271.25 2.20 292,637.40
509-02 contractor retained reclaimed asphaltic pavement - 3,326      CUYD 10.00 - 33,260.00 25.00 - 83,150.00 FREE FREE 0.10 - 332.60
713-01 temporary signs & barricades lump      LUMP 45,000.00 45,000.00 15,000.00 15,000.00 25,000.00 25,000.00 75,000.00 75,000.00
713-03-E temporary pavement markings (24" width) 90      LNFT 1.00 90.00 0.72 64.80 1.00 90.00 0.40 36.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
19.800  MILE 110.00 2,178.00 300.00 5,940.00 300.00 5,940.00 500.00 9,900.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
13.390  MILE 10.00 133.90 225.00 3,012.75 250.00 3,347.50 100.00 1,339.00
713-05-A temporary pavement markings (solid line)(4" width) 14.642  MILE 400.00 5,856.80 3,800.00 55,639.60 450.00 6,588.90 10.00 146.42
724-01-A pavement patching (6" minimum thickness) 774      SQYD 35.00 27,090.00 1.00 774.00 30.00 23,220.00 25.00 19,350.00
724-01-B pavement patching (12" minimum thickness) 929      SQYD 55.00 51,095.00 1.00 929.00 50.00 46,450.00 60.00 55,740.00
727-01 mobilization lump      LUMP 130,000.00 130,000.00 120,000.00 120,000.00 75,000.00 75,000.00 78,000.00 78,000.00
729-16-B object marker assembly (type 2) 12      EACH 45.00 540.00 65.00 780.00 50.00 600.00 45.00 540.00
729-16-C object marker assembly (type 3) 12      EACH 65.00 780.00 75.00 900.00 60.00 720.00 45.00 540.00
731-02 reflectorized raised pavement markers 999      EACH 5.00 4,995.00 4.90 4,895.10 5.00 4,995.00 6.00 5,994.00
732-01-E plastic pavement striping (24" width) 80      LNFT 2.50 200.00 2.50 200.00 2.75 220.00 5.00 400.00
732-02-A plastic pavement striping (solid line) (4" width) 13.414  MILE 1,800.00 24,145.20 1,615.00 21,663.61 2,000.00 26,828.00 2,000.00 26,828.00
732-03-A plastic pavement striping (broken line)(4" width) 6.530  MILE 650.00 4,244.50 630.00 4,113.90 800.00 5,224.00 1,000.00 6,530.00
735-01 mailboxes 2      EACH 1.00 2.00 1.00 2.00 5.00 10.00 1.00 2.00
735-02 mailbox supports (single) 2      EACH 130.00 260.00 200.00 400.00 200.00 400.00 150.00 300.00
739-01 hydro-seeding 13.62   ACRE 900.00 12,258.00 875.00 11,917.50 1,000.00 13,620.00 1,200.00 16,344.00
740-01 construction layout lump      LUMP 9,000.00 9,000.00 25,000.00 25,000.00 18,000.00 18,000.00 39,000.00 39,000.00
S-001 rumble strips (ground-in) 13.1    MILE 1,000.00 13,100.00 800.00 10,480.00 825.00 10,807.50 750.00 9,825.00
                       
 CONTRACTOR TOTAL       1,789,027.60   1,877,307.06   1,896,544.15   1,995,751.82
 
Item Number Item Description Quantity Unit of Measure - 5 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-08 borrow (vehicular measurement) 3,098      CUYD 35.00 108,430.00            
502-01 superpave asphaltic concrete 31,578.8    TON 63.65 2,009,990.62            
502-01-A superpave asphaltic concrete, paved drives and
turnouts
49.9    TON 250.00 12,475.00            
509-01 cold planing asphaltic pavement 133,017      SQYD 2.25 299,288.25            
509-02 contractor retained reclaimed asphaltic pavement - 3,326      CUYD 0.10 - 332.60            
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00            
713-03-E temporary pavement markings (24" width) 90      LNFT 1.00 90.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
19.800  MILE 300.00 5,940.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
13.390  MILE 300.00 4,017.00            
713-05-A temporary pavement markings (solid line)(4" width) 14.642  MILE 525.00 7,687.05            
724-01-A pavement patching (6" minimum thickness) 774      SQYD 82.00 63,468.00            
724-01-B pavement patching (12" minimum thickness) 929      SQYD 105.00 97,545.00            
727-01 mobilization lump      LUMP 108,000.00 108,000.00            
729-16-B object marker assembly (type 2) 12      EACH 93.00 1,116.00            
729-16-C object marker assembly (type 3) 12      EACH 93.00 1,116.00            
731-02 reflectorized raised pavement markers 999      EACH 6.00 5,994.00            
732-01-E plastic pavement striping (24" width) 80      LNFT 3.00 240.00            
732-02-A plastic pavement striping (solid line) (4" width) 13.414  MILE 2,200.00 29,510.80            
732-03-A plastic pavement striping (broken line)(4" width) 6.530  MILE 925.00 6,040.25            
735-01 mailboxes 2      EACH 15.00 30.00            
735-02 mailbox supports (single) 2      EACH 482.00 964.00            
739-01 hydro-seeding 13.62   ACRE 985.00 13,415.70            
740-01 construction layout lump      LUMP 10,000.00 10,000.00            
S-001 rumble strips (ground-in) 13.1    MILE 1,000.00 13,100.00            
                       
 CONTRACTOR TOTAL       2,806,125.07            