| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
3,098   |
CUYD |
10.00 |
30,980.00 |
1.00 |
3,098.00 |
12.00 |
37,176.00 |
8.50 |
26,333.00 |
| 502-01 |
superpave asphaltic concrete
|
31,578.8 |
TON |
41.00 |
1,294,730.80 |
42.00 |
1,326,309.60 |
45.00 |
1,421,046.00 |
42.00 |
1,326,309.60 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
49.9 |
TON |
120.00 |
5,988.00 |
70.00 |
3,493.00 |
100.00 |
4,990.00 |
100.00 |
4,990.00 |
| 509-01 |
cold planing asphaltic pavement
|
133,017   |
SQYD |
1.20 |
159,620.40 |
2.60 |
345,844.20 |
1.25 |
166,271.25 |
2.20 |
292,637.40 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,326   |
CUYD |
10.00 |
- 33,260.00 |
25.00 |
- 83,150.00 |
FREE |
FREE |
0.10 |
- 332.60 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
45,000.00 |
45,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
75,000.00 |
75,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
90   |
LNFT |
1.00 |
90.00 |
0.72 |
64.80 |
1.00 |
90.00 |
0.40 |
36.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
19.800 |
MILE |
110.00 |
2,178.00 |
300.00 |
5,940.00 |
300.00 |
5,940.00 |
500.00 |
9,900.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.390 |
MILE |
10.00 |
133.90 |
225.00 |
3,012.75 |
250.00 |
3,347.50 |
100.00 |
1,339.00 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.642 |
MILE |
400.00 |
5,856.80 |
3,800.00 |
55,639.60 |
450.00 |
6,588.90 |
10.00 |
146.42 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
774   |
SQYD |
35.00 |
27,090.00 |
1.00 |
774.00 |
30.00 |
23,220.00 |
25.00 |
19,350.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
929   |
SQYD |
55.00 |
51,095.00 |
1.00 |
929.00 |
50.00 |
46,450.00 |
60.00 |
55,740.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
120,000.00 |
120,000.00 |
75,000.00 |
75,000.00 |
78,000.00 |
78,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
45.00 |
540.00 |
65.00 |
780.00 |
50.00 |
600.00 |
45.00 |
540.00 |
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
65.00 |
780.00 |
75.00 |
900.00 |
60.00 |
720.00 |
45.00 |
540.00 |
| 731-02 |
reflectorized raised pavement markers
|
999   |
EACH |
5.00 |
4,995.00 |
4.90 |
4,895.10 |
5.00 |
4,995.00 |
6.00 |
5,994.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
80   |
LNFT |
2.50 |
200.00 |
2.50 |
200.00 |
2.75 |
220.00 |
5.00 |
400.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.414 |
MILE |
1,800.00 |
24,145.20 |
1,615.00 |
21,663.61 |
2,000.00 |
26,828.00 |
2,000.00 |
26,828.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.530 |
MILE |
650.00 |
4,244.50 |
630.00 |
4,113.90 |
800.00 |
5,224.00 |
1,000.00 |
6,530.00 |
| 735-01 |
mailboxes
|
2   |
EACH |
1.00 |
2.00 |
1.00 |
2.00 |
5.00 |
10.00 |
1.00 |
2.00 |
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
130.00 |
260.00 |
200.00 |
400.00 |
200.00 |
400.00 |
150.00 |
300.00 |
| 739-01 |
hydro-seeding
|
13.62 |
ACRE |
900.00 |
12,258.00 |
875.00 |
11,917.50 |
1,000.00 |
13,620.00 |
1,200.00 |
16,344.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
39,000.00 |
39,000.00 |
| S-001 |
rumble strips (ground-in)
|
13.1 |
MILE |
1,000.00 |
13,100.00 |
800.00 |
10,480.00 |
825.00 |
10,807.50 |
750.00 |
9,825.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,789,027.60 |
|
1,877,307.06 |
|
1,896,544.15 |
|
1,995,751.82 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
3,098   |
CUYD |
35.00 |
108,430.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
31,578.8 |
TON |
63.65 |
2,009,990.62 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
49.9 |
TON |
250.00 |
12,475.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
133,017   |
SQYD |
2.25 |
299,288.25 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,326   |
CUYD |
0.10 |
- 332.60 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
90   |
LNFT |
1.00 |
90.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
19.800 |
MILE |
300.00 |
5,940.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
13.390 |
MILE |
300.00 |
4,017.00 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.642 |
MILE |
525.00 |
7,687.05 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
774   |
SQYD |
82.00 |
63,468.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
929   |
SQYD |
105.00 |
97,545.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
108,000.00 |
108,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
93.00 |
1,116.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
12   |
EACH |
93.00 |
1,116.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
999   |
EACH |
6.00 |
5,994.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
80   |
LNFT |
3.00 |
240.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.414 |
MILE |
2,200.00 |
29,510.80 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.530 |
MILE |
925.00 |
6,040.25 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
2   |
EACH |
15.00 |
30.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
2   |
EACH |
482.00 |
964.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
13.62 |
ACRE |
985.00 |
13,415.70 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
13.1 |
MILE |
1,000.00 |
13,100.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|