| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - COASTAL BRIDGE CO., L.L.C. |
BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
2,468   |
CUYD |
10.00 |
24,680.00 |
15.00 |
37,020.00 |
1.00 |
2,468.00 |
14.00 |
34,552.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
3,000   |
CUYD |
10.00 |
30,000.00 |
12.00 |
36,000.00 |
1.00 |
3,000.00 |
10.00 |
30,000.00 |
| 204-02 |
temporary hay or straw bales
|
16   |
EACH |
8.00 |
128.00 |
8.26 |
132.16 |
8.00 |
128.00 |
12.00 |
192.00 |
| 204-06 |
temporary silt fencing
|
160   |
LNFT |
3.60 |
576.00 |
2.10 |
336.00 |
2.00 |
320.00 |
3.00 |
480.00 |
| 303-02 |
removal of existing patches
|
500   |
SQYD |
6.00 |
3,000.00 |
27.89 |
13,945.00 |
15.00 |
7,500.00 |
15.00 |
7,500.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
477.5 |
CUYD |
35.00 |
16,712.50 |
27.77 |
13,260.17 |
15.00 |
7,162.50 |
25.00 |
11,937.50 |
| 502-01 |
superpave asphaltic concrete
|
11,656.7 |
TON |
47.00 |
547,864.90 |
42.68 |
497,507.95 |
52.00 |
606,148.40 |
48.00 |
559,521.60 |
| 502-01-A |
superpave asphaltic concrete, (paved drives & turnouts)
|
1,737.3 |
TON |
1.00 |
1,737.30 |
77.57 |
134,762.36 |
5.00 |
8,686.50 |
60.00 |
104,238.00 |
| 509-01-A |
cold planing asphaltic pavement (2" thick)
|
3,036   |
SQYD |
1.50 |
4,554.00 |
1.79 |
5,434.44 |
2.00 |
6,072.00 |
1.60 |
4,857.60 |
| 509-01-B |
cold planing asphaltic pavement (4" thick)
|
47,251   |
SQYD |
1.70 |
80,326.70 |
1.38 |
65,206.38 |
6.50 |
307,131.50 |
2.75 |
129,940.25 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 5,084   |
CUYD |
9.00 |
- 45,756.00 |
0.10 |
- 508.40 |
25.00 |
- 127,100.00 |
FREE |
FREE |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa or 24" equiv.
cmpa) |
80   |
LNFT |
75.00 |
6,000.00 |
59.91 |
4,792.80 |
65.00 |
5,200.00 |
80.00 |
6,400.00 |
| 701-02-D/E |
cross drain pipe arch (24" equiv. rcpa or 30" equiv.
cmpa) |
72   |
LNFT |
80.00 |
5,760.00 |
72.31 |
5,206.32 |
67.00 |
4,824.00 |
85.00 |
6,120.00 |
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
120   |
LNFT |
100.00 |
12,000.00 |
87.80 |
10,536.00 |
75.00 |
9,000.00 |
110.00 |
13,200.00 |
| 711-03-C |
riprap (30 lb)
|
80.0 |
TON |
80.00 |
6,400.00 |
77.47 |
6,197.60 |
77.00 |
6,160.00 |
70.00 |
5,600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
55,000.00 |
55,000.00 |
6,100.00 |
6,100.00 |
45,000.00 |
45,000.00 |
25,000.00 |
25,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
120   |
LNFT |
1.00 |
120.00 |
0.93 |
111.60 |
0.90 |
108.00 |
1.00 |
120.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.730 |
MILE |
130.00 |
744.90 |
362.00 |
2,074.26 |
300.00 |
1,719.00 |
400.00 |
2,292.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.830 |
MILE |
10.00 |
18.30 |
285.00 |
521.55 |
275.00 |
503.25 |
350.00 |
640.50 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.140 |
MILE |
20.00 |
862.80 |
439.00 |
18,938.46 |
1.00 |
43.14 |
470.00 |
20,275.80 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
100.00 |
600.00 |
104.00 |
624.00 |
100.00 |
600.00 |
150.00 |
900.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
2,500.00 |
2,500.00 |
7,500.00 |
7,500.00 |
| 726-01 |
bedding material
|
23.7 |
CUYD |
50.00 |
1,185.00 |
41.32 |
979.28 |
75.00 |
1,777.50 |
55.00 |
1,303.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
120,000.00 |
120,000.00 |
27,250.00 |
27,250.00 |
110,000.00 |
110,000.00 |
100,000.00 |
100,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
60.00 |
960.00 |
67.14 |
1,074.24 |
65.00 |
1,040.00 |
65.00 |
1,040.00 |
| 731-02 |
reflectorized raised pavement markers
|
560   |
EACH |
5.00 |
2,800.00 |
5.06 |
2,833.60 |
4.90 |
2,744.00 |
5.50 |
3,080.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
40   |
LNFT |
3.00 |
120.00 |
2.58 |
103.20 |
2.50 |
100.00 |
3.00 |
120.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
14.380 |
MILE |
1,700.00 |
24,446.00 |
1,808.00 |
25,999.04 |
1,750.00 |
25,165.00 |
2,000.00 |
28,760.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.910 |
MILE |
700.00 |
1,337.00 |
724.00 |
1,382.84 |
700.00 |
1,337.00 |
1,000.00 |
1,910.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
350.00 |
700.00 |
362.00 |
724.00 |
350.00 |
700.00 |
500.00 |
1,000.00 |
| 735-01 |
mailboxes
|
72   |
EACH |
1.00 |
72.00 |
12.00 |
864.00 |
1.00 |
72.00 |
2.00 |
144.00 |
| 735-02 |
mailbox supports (single)
|
72   |
EACH |
120.00 |
8,640.00 |
171.00 |
12,312.00 |
200.00 |
14,400.00 |
120.00 |
8,640.00 |
| 736-09 |
loop detector
|
150   |
LNFT |
12.00 |
1,800.00 |
10.33 |
1,549.50 |
10.00 |
1,500.00 |
12.00 |
1,800.00 |
| 736-10 |
underground junction box
|
1   |
EACH |
300.00 |
300.00 |
235.00 |
235.00 |
225.00 |
225.00 |
250.00 |
250.00 |
| 739-01 |
hydro-seeding
|
4.50 |
ACRE |
900.00 |
4,050.00 |
830.00 |
3,735.00 |
850.00 |
3,825.00 |
1,000.00 |
4,500.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
13,000.00 |
13,000.00 |
23,655.00 |
23,655.00 |
35,000.00 |
35,000.00 |
36,000.00 |
36,000.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
40.34 |
CUYD |
800.00 |
32,272.00 |
723.05 |
29,167.83 |
750.00 |
30,255.00 |
900.00 |
36,306.00 |
| 806-01 |
deformed reinforcing steel
|
2,828   |
LB |
2.50 |
7,070.00 |
0.67 |
1,894.76 |
2.25 |
6,363.00 |
1.00 |
2,828.00 |
| S-001 |
cement treated base course (5% by volume)(12 in depth)
|
59,064   |
SQYD |
3.70 |
218,536.80 |
4.60 |
271,694.40 |
4.00 |
236,256.00 |
4.50 |
265,788.00 |
| S-002 |
u-channel post installation
|
70   |
EACH |
50.00 |
3,500.00 |
77.50 |
5,425.00 |
50.00 |
3,500.00 |
60.00 |
4,200.00 |
| S-003 |
cleaning existing ditches
|
8,000   |
LNFT |
2.00 |
16,000.00 |
2.58 |
20,640.00 |
1.00 |
8,000.00 |
3.00 |
24,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,213,118.20 |
|
1,292,717.34 |
|
1,379,433.79 |
|
IRREGULAR |
|