| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
rem0val of structures and obstructions
|
lump |
lump |
500.00 |
500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-I |
removal of temporary connections
|
1,507   |
sq m |
5.00 |
7,535.00 |
7.00 |
10,549.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
6,862   |
cu m |
10.00 |
68,620.00 |
8.00 |
54,896.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
88   |
ea |
10.00 |
880.00 |
8.00 |
704.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,519   |
ln m |
4.50 |
15,835.50 |
7.00 |
24,633.00 |
|
|
|
|
| 302-02-E |
class ii base course (200 mm thick)
|
23,346.8 |
sq m |
17.00 |
396,895.60 |
13.50 |
315,181.80 |
|
|
|
|
| 302-02-F |
class ii base course (350 mm thick)
|
7,881.8 |
sq m |
22.00 |
173,399.60 |
23.00 |
181,281.40 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
35.00 |
35,000.00 |
35.00 |
35,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
11,414.1 |
Mg |
62.00 |
707,674.20 |
64.50 |
736,209.45 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete paved drives (100 mm min.
thickness) |
41.0 |
Mg |
200.00 |
8,200.00 |
125.00 |
5,125.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement(50mm avg. thickness)
|
34,149   |
sq m |
2.00 |
68,298.00 |
3.10 |
105,861.90 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,707   |
cu m |
20.00 |
- 34,140.00 |
10.00 |
- 17,070.00 |
|
|
|
|
| 601-01-K |
portland cement concrete pavement (250 mm thick)
|
12,667.5 |
sq m |
50.00 |
633,375.00 |
63.00 |
798,052.50 |
|
|
|
|
| 601-02-K |
portland cement concrete pavement (250 mm thick)
(crossovers & turnouts) |
1,828.9 |
sq m |
65.00 |
118,878.50 |
85.00 |
155,456.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
40,000.00 |
40,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(100 mm width)
(1.2 m length) |
4.000 |
km |
200.00 |
800.00 |
475.00 |
1,900.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
4.000 |
km |
500.00 |
2,000.00 |
475.00 |
1,900.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
each |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
400   |
sq m |
75.00 |
30,000.00 |
90.00 |
36,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
245,000.00 |
245,000.00 |
257,000.00 |
257,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
544   |
ea |
5.00 |
2,720.00 |
5.00 |
2,720.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
59   |
ln m |
1.00 |
59.00 |
1.00 |
59.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
4   |
ln m |
3.00 |
12.00 |
3.00 |
12.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
12.303 |
km |
1,100.00 |
13,533.30 |
1,100.00 |
13,533.30 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
6.180 |
km |
450.00 |
2,781.00 |
475.00 |
2,935.50 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
ea |
125.00 |
250.00 |
130.00 |
260.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
ea |
135.00 |
270.00 |
140.00 |
280.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
1.300 |
km |
2,200.00 |
2,860.00 |
2,200.00 |
2,860.00 |
|
|
|
|
| 735-01 |
mailboxes
|
5   |
ea |
1.00 |
5.00 |
1.00 |
5.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
5   |
ea |
160.00 |
800.00 |
150.00 |
750.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
4.0 |
hctr |
2,500.00 |
10,000.00 |
2,400.00 |
9,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| S-001 |
rumble strips(ground-in)
|
10.9 |
km |
800.00 |
8,720.00 |
800.00 |
8,720.00 |
|
|
|
|
| S-002 |
scarifying, shaping, and compacting roadbed
|
17.59 |
sta |
12,000.00 |
211,080.00 |
9,200.00 |
161,828.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,831,841.70 |
|
2,969,243.35 |
|
|
|
|
|