| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 3 - H & S CONSTRUCTION CO., INC. |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
956   |
LNFT |
4.00 |
3,824.00 |
3.40 |
3,250.40 |
4.00 |
3,824.00 |
2.25 |
2,151.00 |
| 203-08 |
borrow (vehicular measurement)
|
675   |
CUYD |
10.00 |
6,750.00 |
10.50 |
7,087.50 |
12.00 |
8,100.00 |
31.00 |
20,925.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
94   |
CUYD |
70.00 |
6,580.00 |
85.00 |
7,990.00 |
30.00 |
2,820.00 |
55.00 |
5,170.00 |
| 502-01 |
superpave asphaltic concrete
|
46,009.0 |
TON |
45.00 |
2,070,405.00 |
47.35 |
2,178,526.15 |
58.00 |
2,668,522.00 |
53.78 |
2,474,364.02 |
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
750.6 |
TON |
35.00 |
26,271.00 |
64.00 |
48,038.40 |
70.00 |
52,542.00 |
154.26 |
115,787.55 |
| 509-01 |
cold planing asphaltic pavement
|
132,556   |
SQYD |
0.80 |
106,044.80 |
0.73 |
96,765.88 |
1.10 |
145,811.60 |
2.00 |
265,112.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,682   |
CUYD |
18.00 |
- 66,276.00 |
1.00 |
- 3,682.00 |
FREE |
FREE |
1.00 |
- 3,682.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
920.0 |
LNFT |
25.73 |
23,671.60 |
25.60 |
23,552.00 |
28.20 |
25,944.00 |
45.00 |
41,400.00 |
| 704-03 |
blocked out guard rail
|
950.5 |
LNFT |
15.22 |
14,466.61 |
15.15 |
14,400.07 |
16.70 |
15,873.35 |
18.00 |
17,109.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
42.00 |
8,400.00 |
41.75 |
8,350.00 |
46.00 |
9,200.00 |
56.00 |
11,200.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,650.00 |
6,600.00 |
1,700.00 |
6,800.00 |
1,840.00 |
7,360.00 |
2,200.00 |
8,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
45,000.00 |
45,000.00 |
8,700.00 |
8,700.00 |
15,000.00 |
15,000.00 |
11,000.00 |
11,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
81   |
LNFT |
0.20 |
16.20 |
0.32 |
25.92 |
0.35 |
28.35 |
0.34 |
27.54 |
| 713-03-D |
temporary pavement markings (12" width)
|
624   |
LNFT |
0.30 |
187.20 |
0.47 |
293.28 |
0.52 |
324.48 |
0.51 |
318.24 |
| 713-03-E |
temporary pavement markings (24" width)
|
180   |
LNFT |
0.60 |
108.00 |
0.94 |
169.20 |
1.04 |
187.20 |
1.00 |
180.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
27.870 |
MILE |
250.00 |
6,967.50 |
175.00 |
4,877.25 |
316.00 |
8,806.92 |
282.00 |
7,859.34 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
16.968 |
MILE |
1.00 |
16.96 |
290.00 |
4,920.72 |
316.00 |
5,361.88 |
310.00 |
5,260.08 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.784 |
MILE |
1.00 |
43.78 |
450.00 |
19,702.80 |
488.00 |
21,366.59 |
475.00 |
20,797.40 |
| 713-07 |
temporary reflectorized raised pavement markers
|
1,488   |
EACH |
0.10 |
148.80 |
1.27 |
1,889.76 |
0.86 |
1,279.68 |
1.00 |
1,488.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
3,500.00 |
3,500.00 |
3,700.00 |
3,700.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
470   |
SQYD |
25.00 |
11,750.00 |
28.50 |
13,395.00 |
27.60 |
12,972.00 |
132.00 |
62,040.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,854   |
SQYD |
52.00 |
96,408.00 |
50.00 |
92,700.00 |
52.50 |
97,335.00 |
156.00 |
289,224.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
134,400.00 |
134,400.00 |
23,000.00 |
23,000.00 |
100,000.00 |
100,000.00 |
39,000.00 |
39,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
55.00 |
220.00 |
58.00 |
232.00 |
63.25 |
253.00 |
79.00 |
316.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
68.00 |
544.00 |
68.00 |
544.00 |
74.75 |
598.00 |
101.00 |
808.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,488   |
EACH |
5.00 |
7,440.00 |
5.10 |
7,588.80 |
5.60 |
8,332.80 |
5.50 |
8,184.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
624   |
LNFT |
0.90 |
561.60 |
0.63 |
393.12 |
0.70 |
436.80 |
0.68 |
424.32 |
| 732-01-D |
plastic pavement striping (12" width)
|
81   |
LNFT |
2.00 |
162.00 |
0.94 |
76.14 |
1.03 |
83.43 |
1.00 |
81.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
180   |
LNFT |
3.00 |
540.00 |
2.60 |
468.00 |
2.87 |
516.60 |
2.81 |
505.80 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.892 |
MILE |
1,800.00 |
39,405.60 |
1,800.00 |
39,405.60 |
1,955.00 |
42,798.86 |
1,900.00 |
41,594.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.484 |
MILE |
700.00 |
5,938.80 |
720.00 |
6,108.48 |
805.00 |
6,829.62 |
900.00 |
7,635.60 |
| 735-01 |
mailboxes
|
39   |
EACH |
1.00 |
39.00 |
1.10 |
42.90 |
20.00 |
780.00 |
13.00 |
507.00 |
| 735-02 |
mailbox supports (single)
|
23   |
EACH |
120.00 |
2,760.00 |
130.00 |
2,990.00 |
140.00 |
3,220.00 |
370.00 |
8,510.00 |
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
135.00 |
540.00 |
180.00 |
720.00 |
220.00 |
880.00 |
500.00 |
2,000.00 |
| 735-04 |
mailbox supports (multiple)
|
2   |
EACH |
300.00 |
600.00 |
350.00 |
700.00 |
300.00 |
600.00 |
600.00 |
1,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
100.00 |
100.00 |
4,500.00 |
4,500.00 |
18,000.00 |
18,000.00 |
11,000.00 |
11,000.00 |
| S-001 |
cement treated base course (12 in depth)
|
84,560   |
SQYD |
6.75 |
570,780.00 |
7.00 |
591,920.00 |
7.62 |
644,347.20 |
11.94 |
1,009,646.40 |
| S-002 |
rumble strips (ground-in)
|
18.6 |
MILE |
634.00 |
11,792.40 |
560.00 |
10,416.00 |
914.00 |
17,000.40 |
1,000.00 |
18,600.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,146,706.85 |
|
3,230,557.37 |
|
3,952,335.76 |
|
4,509,544.09 |
|