| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-G |
removal of surfacing & stabilized base
|
14,811.0 |
SQYD |
3.00 |
44,433.00 |
4.00 |
59,244.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
12,802   |
CUYD |
5.00 |
64,010.00 |
21.00 |
268,842.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular measurement)(selected soils)
|
1,280   |
CUYD |
15.00 |
19,200.00 |
23.00 |
29,440.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
17,032.8 |
SQYD |
12.00 |
204,393.60 |
20.00 |
340,656.00 |
|
|
|
|
| 304-01 |
lime
|
261.27 |
TON |
105.00 |
27,433.35 |
110.00 |
28,739.70 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
20,736   |
SQYD |
3.00 |
62,208.00 |
4.00 |
82,944.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,628   |
CUYD |
45.00 |
73,260.00 |
50.00 |
81,400.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
946.0 |
CUYD |
35.00 |
33,110.00 |
30.00 |
28,380.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,710.6 |
TON |
59.50 |
637,280.70 |
56.00 |
599,793.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete (paved drives and
turnouts) |
351.0 |
TON |
59.50 |
20,884.50 |
125.00 |
43,875.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
56   |
LNFT |
200.00 |
11,200.00 |
110.00 |
6,160.00 |
|
|
|
|
| 701-15 |
concrete collar
|
7   |
EACH |
1,000.00 |
7,000.00 |
400.00 |
2,800.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
185,000.00 |
185,000.00 |
4,500.00 |
4,500.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.880 |
MILE |
200.00 |
1,576.00 |
270.00 |
2,127.60 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.860 |
MILE |
230.00 |
1,807.80 |
270.00 |
2,122.20 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
15.980 |
MILE |
1.00 |
15.98 |
550.00 |
8,789.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
10.00 |
ACRE |
800.00 |
8,000.00 |
650.00 |
6,500.00 |
|
|
|
|
| 717-01 |
seeding
|
600   |
LB |
10.00 |
6,000.00 |
6.50 |
3,900.00 |
|
|
|
|
| 718-01 |
fertilizer
|
10,000   |
LB |
0.40 |
4,000.00 |
0.28 |
2,800.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
4,000.00 |
4,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
700   |
SQYD |
99.50 |
69,650.00 |
110.00 |
77,000.00 |
|
|
|
|
| 724-02 |
pavement widening
|
4,196.4 |
SQYD |
30.00 |
125,892.00 |
39.00 |
163,659.60 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
185,000.00 |
185,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
520   |
EACH |
6.50 |
3,380.00 |
5.00 |
2,600.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.990 |
MILE |
2,900.00 |
23,171.00 |
1,975.00 |
15,780.25 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.930 |
MILE |
1,200.00 |
4,716.00 |
750.00 |
2,947.50 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
15.52 |
CUYD |
1,200.00 |
18,624.00 |
665.00 |
10,320.80 |
|
|
|
|
| 805-12-I |
reinforced concrete box culverts (5'x 5')
|
18.0 |
LNFT |
1,200.00 |
21,600.00 |
600.00 |
10,800.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,050   |
LB |
2.00 |
2,100.00 |
2.00 |
2,100.00 |
|
|
|
|
| S-001 |
reinforced concrete box culvert sloped end treatment
|
2   |
EACH |
3,500.00 |
7,000.00 |
9,000.00 |
18,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,896,945.93 |
|
1,947,221.25 |
|
|
|
|
|