| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
1,305   |
LNFT |
3.00 |
3,915.00 |
10.00 |
13,050.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
5,082   |
CUYD |
16.50 |
83,853.00 |
13.00 |
66,066.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
9,282   |
CUYD |
12.00 |
111,384.00 |
10.00 |
92,820.00 |
|
|
|
|
| 304-01 |
lime
|
208.16 |
TON |
101.68 |
21,165.70 |
103.00 |
21,440.48 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
18,889   |
SQYD |
3.13 |
59,122.57 |
2.50 |
47,222.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
92   |
CUYD |
50.25 |
4,623.00 |
50.00 |
4,600.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
12,955.3 |
TON |
46.62 |
603,976.08 |
56.00 |
725,496.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
270.5 |
TON |
130.25 |
35,232.62 |
126.00 |
34,083.00 |
|
|
|
|
| 507-01-B |
asphaltic surface treatment (2 applications)
|
56,334   |
SQYD |
2.25 |
126,751.50 |
1.75 |
98,584.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
55,629   |
SQYD |
1.37 |
76,211.73 |
1.50 |
83,443.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,013   |
CUYD |
0.10 |
- 201.30 |
0.01 |
- 20.13 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
14   |
LNFT |
105.87 |
1,482.18 |
200.00 |
2,800.00 |
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
650.00 |
1,300.00 |
600.00 |
1,200.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
984.0 |
LNFT |
42.35 |
41,672.40 |
35.00 |
34,440.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,162.6 |
LNFT |
17.00 |
19,764.20 |
16.50 |
19,182.90 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
52.93 |
5,293.00 |
40.00 |
4,000.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
4   |
EACH |
2,225.00 |
8,900.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
26,100.00 |
26,100.00 |
90,000.00 |
90,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.984 |
MILE |
318.00 |
2,538.91 |
175.00 |
1,397.20 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.726 |
MILE |
265.00 |
1,517.39 |
160.00 |
916.16 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.054 |
MILE |
530.00 |
12,218.62 |
1.00 |
23.05 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
5.67 |
ACRE |
690.00 |
3,912.30 |
575.00 |
3,260.25 |
|
|
|
|
| 717-01 |
seeding
|
255   |
LB |
8.00 |
2,040.00 |
7.00 |
1,785.00 |
|
|
|
|
| 718-01 |
fertilizer
|
5,670   |
LB |
0.26 |
1,474.20 |
0.25 |
1,417.50 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 724-01-C |
pavement patching (16" minimum thickness)
|
825   |
SQYD |
94.86 |
78,259.50 |
100.00 |
82,500.00 |
|
|
|
|
| 724-03 |
pavement joint repair
|
1,200.0 |
TON |
80.00 |
96,000.00 |
100.00 |
120,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
46.7 |
CUYD |
69.00 |
3,222.30 |
65.00 |
3,035.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
165,000.00 |
165,000.00 |
151,000.00 |
151,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
90.00 |
360.00 |
70.00 |
280.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
545   |
EACH |
5.50 |
2,997.50 |
5.50 |
2,997.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.773 |
MILE |
1,900.00 |
22,368.70 |
2,500.00 |
29,432.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.863 |
MILE |
714.00 |
2,044.18 |
1,000.00 |
2,863.00 |
|
|
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
12.00 |
72.00 |
1.00 |
6.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
255.00 |
1,530.00 |
150.00 |
900.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
23,564.00 |
23,564.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 805-12-A |
reinforced concrete box culverts (4'x 3')
|
12.0 |
LNFT |
585.00 |
7,020.00 |
675.00 |
8,100.00 |
|
|
|
|
| 805-12-Y |
reinforced concrete box culverts (4'x 2')
|
12.0 |
LNFT |
585.00 |
7,020.00 |
675.00 |
8,100.00 |
|
|
|
|
| 805-12-Z |
reinforced concrete box culverts (8'x 3')
|
24.0 |
LNFT |
1,060.00 |
25,440.00 |
750.00 |
18,000.00 |
|
|
|
|
| S-001 |
clean and reseal stress relief joint
|
48   |
LNFT |
91.00 |
4,368.00 |
100.00 |
4,800.00 |
|
|
|
|
| S-002 |
cement treated base course (8 1/2" depth)
|
38,882   |
SQYD |
6.31 |
245,345.42 |
5.85 |
227,459.70 |
|
|
|
|
| S-003 |
cleaning existing ditches
|
400   |
LNFT |
5.50 |
2,200.00 |
15.00 |
6,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,972,058.70 |
|
2,054,682.91 |
|
|
|
|
|