Letting of 7/28/2004 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 018-03-0024
Parish: ST TAMMANY
Routes: US 11
Description: US 11 AT HALL AVE. TO GAUSE BLVD.
Type Const: cold planing asphaltic concrete, class ii base course, asphaltic concrete overlay,
drainage structures related work.
 
RankLicenseBidderAmount
102179 BOH BROS. CONSTRUCTION CO., LLC. $426,803.88
206276 BARRIERE CONSTRUCTION CO., LLC. $443,306.90
312487 DIAMOND B CONSTRUCTION CO., L.L.C. $663,210.75
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 500.00 500.00 12,000.00 12,000.00 3,000.00 3,000.00    
202-02-D removal of concrete walks & drives 312      SQYD 7.00 2,184.00 8.00 2,496.00 12.00 3,744.00    
202-02-F removal of concrete combination curb & gutter 1,779.1    LNFT 4.00 7,116.40 6.00 10,674.60 6.00 10,674.60    
203-08 borrow (vehicular measurement) 50      CUYD 40.00 2,000.00 20.00 1,000.00 24.00 1,200.00    
204-05-A temporary sediment check dams (hay) 10      EACH 100.00 1,000.00 80.00 800.00 116.00 1,160.00    
204-06 temporary silt fencing 1,700      LNFT 1.60 2,720.00 2.00 3,400.00 5.00 8,500.00    
502-01 superpave asphaltic concrete 1,952.9    TON 65.00 126,938.50 66.00 128,891.40 97.42 190,251.51    
502-01-A superpave asphaltic concrete, paved drives and
turnouts
562.5    TON 65.00 36,562.50 66.00 37,125.00 146.50 82,406.25    
509-01 cold planing asphaltic pavement 6,428      SQYD 3.00 19,284.00 7.00 44,996.00 8.00 51,424.00    
509-02 contractor retained reclaimed asphaltic pavement - 446      CUYD 6.00 - 2,676.00 6.00 - 2,676.00 0.10 - 44.60    
701-04-A storm drain pipe arch (15" equiv. rcpa) 30      LNFT 90.00 2,700.00 100.00 3,000.00 150.00 4,500.00    
702-03-C catch basins (cb-06) 8      EACH 4,800.00 38,400.00 4,000.00 32,000.00 4,700.00 37,600.00    
702-04-A adjusting manholes 1      EACH 600.00 600.00 800.00 800.00 1,800.00 1,800.00    
702-04-B adjusting catch basins 10      EACH 100.00 1,000.00 1,400.00 14,000.00 2,400.00 24,000.00    
706-01-A concrete walk (4" thick) 207.5    SQYD 50.00 10,375.00 65.00 13,487.50 47.00 9,752.50    
706-02-C concrete drive (6" thick) 140.4    SQYD 65.00 9,126.00 68.00 9,547.20 47.00 6,598.80    
707-03 combination concrete curb & gutter 1,895.7    LNFT 19.00 36,018.30 19.00 36,018.30 24.00 45,496.80    
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 15,000.00 15,000.00 6,000.00 6,000.00    
713-04-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
0.378  MILE 400.00 151.20 4,000.00 1,512.00 1,000.00 378.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.134  MILE 275.00 311.85 100.00 113.40 325.00 368.55    
713-05-A temporary pavement markings (solid line)(4" width) 2.271  MILE 450.00 1,021.95 200.00 454.20 525.00 1,192.27    
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
0.757  MILE 10,200.00 7,721.40 11,000.00 8,327.00 12,000.00 9,084.00    
713-06-A temporary pavement legends and symbols (arrow) 18      EACH 45.00 810.00 50.00 900.00 53.00 954.00    
713-06-C temporary pavement legends and symbols (only) 9      EACH 55.00 495.00 70.00 630.00 64.00 576.00    
713-06-D temporary pavement legends and symbols (rr crossing) 3      EACH 150.00 450.00 180.00 540.00 175.00 525.00    
724-01-B pavement patching (12" minimum thickness) 100      SQYD 80.00 8,000.00 70.00 7,000.00 175.00 17,500.00    
727-01 mobilization lump      LUMP 40,000.00 40,000.00 22,000.00 22,000.00 20,000.00 20,000.00    
731-02 reflectorized raised pavement markers 100      EACH 4.90 490.00 6.00 600.00 6.00 600.00    
732-02-A plastic pavement striping (solid line) (4" width) 0.757  MILE 1,790.00 1,355.03 2,000.00 1,514.00 2,100.00 1,589.70    
732-03-A plastic pavement striping (broken line)(4" width) 0.757  MILE 750.00 567.75 900.00 681.30 875.00 662.37    
732-04-A plastic pavement legends & symbols (arrow) 6      EACH 145.00 870.00 170.00 1,020.00 169.00 1,014.00    
732-04-C plastic pavement legends & symbols (only) 3      EACH 155.00 465.00 180.00 540.00 180.00 540.00    
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 400.00 400.00 500.00 500.00 465.00 465.00    
736-09 loop detector 975      LNFT 10.00 9,750.00 11.00 10,725.00 12.00 11,700.00    
736-10 underground junction box 2      EACH 225.00 450.00 300.00 600.00 262.00 524.00    
736-11 conduit (1/2" pec) 100      LNFT 5.00 500.00 6.00 600.00 6.00 600.00    
739-01 hydro-seeding 0.48   ACRE 2,700.00 1,296.00 3,000.00 1,440.00 1,300.00 624.00    
740-01 construction layout lump      LUMP 6,000.00 6,000.00 8,000.00 8,000.00 14,000.00 14,000.00    
S-001 milling portland cement concrete pavement (1" average
depth)
250      SQYD 9.00 2,250.00 25.00 6,250.00 33.00 8,250.00    
S-002 variable message sign unit 4      EACH 2,400.00 9,600.00 1,700.00 6,800.00 21,000.00 84,000.00    
                       
 CONTRACTOR TOTAL       426,803.88   443,306.90   663,210.75    