| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - HIGHWAY SPECIALISTS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
800,000.00 |
800,000.00 |
900,000.00 |
900,000.00 |
950,000.00 |
950,000.00 |
650,000.00 |
650,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
80,000.00 |
80,000.00 |
25,000.00 |
25,000.00 |
125,000.00 |
125,000.00 |
185,000.00 |
185,000.00 |
| 202-02-B-01 |
removal of concrete box culvert (10+475.68; 1.06m x
0.94m x 27.00m r.c.box) |
1   |
ea |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
| 202-02-B-02 |
removal of concrete box culvert (10+682.07; 1.00m x
0.90m x 19.00m r.c.box) |
1   |
ea |
2,500.00 |
2,500.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-B-03 |
removal of concrete box culvert (11+080.71; 2-1.5m x
1.50m x 13.50m r.c. box) |
1   |
ea |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
4,500.00 |
4,500.00 |
| 202-02-B-04 |
removal of concrete box culvert (11+826.18; 2-1.80m x
1.80m x 16.00m r.c. box) |
1   |
ea |
7,000.00 |
7,000.00 |
8,000.00 |
8,000.00 |
2,000.00 |
2,000.00 |
4,500.00 |
4,500.00 |
| 202-02-B-05 |
removal of concrete box culvert (12+747.63; 1.55m x
1.25m x 12.50m r.c. box) |
1   |
ea |
2,400.00 |
2,400.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-B-06 |
removal of concrete box culvert (13+147.48; 2.25m x
0.70m x 16.50m r.c. box) |
1   |
ea |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
4,500.00 |
4,500.00 |
| 202-02-B-07 |
removal of concrete box culvert (13+532.11; 1.60m x
0.65m x 17.00m r.c. box) |
1   |
ea |
3,000.00 |
3,000.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-B-08 |
removal of concrete box culvert (13+936.34; 2-1.50m x
1.07m x 12.5m r.c. box) |
1   |
ea |
4,000.00 |
4,000.00 |
6,500.00 |
6,500.00 |
2,000.00 |
2,000.00 |
4,500.00 |
4,500.00 |
| 202-02-B-09 |
removal of concrete box culvert (14+386.83; 0.60m x
0.40m x 13.00m r.c. box) |
1   |
ea |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-B-10 |
removal of concrete box culvert (14+911.73; 0.91m x
0.63m x 12.50m r.c. box) |
1   |
ea |
1,500.00 |
1,500.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-B-11 |
removal of concrete box culvert (15+403.57; 2-1.90m x
1.85m x 12.50m r.c. box) |
1   |
ea |
6,000.00 |
6,000.00 |
8,000.00 |
8,000.00 |
2,000.00 |
2,000.00 |
4,500.00 |
4,500.00 |
| 202-02-B-12 |
removal of concrete box culvert (16+183.71; 1.52m x
0.40m x 17.00m r.c. box) |
1   |
ea |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
4,500.00 |
4,500.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
63,088   |
sq m |
5.00 |
315,440.00 |
3.20 |
201,881.60 |
3.00 |
189,264.00 |
3.00 |
189,264.00 |
| 202-02-D |
removal of concrete walks & drives
|
11,323   |
sq m |
7.50 |
84,922.50 |
4.50 |
50,953.50 |
7.00 |
79,261.00 |
7.00 |
79,261.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
51,046.2 |
sq m |
2.80 |
142,929.36 |
2.75 |
140,377.05 |
2.00 |
102,092.40 |
3.00 |
153,138.60 |
| 202-02-I |
removal of existing signal equipment and related items
|
lump |
lump |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
4,000.00 |
4,000.00 |
4,500.00 |
4,500.00 |
| 202-02-01 |
removal of wood frame house (rt. of sta. 11+040; 7.5m
x 12m) |
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-02-02 |
removal of wood frame house (rt. of sta. 11+167; 7.5m
x 11m) |
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
2,300.00 |
2,300.00 |
2,500.00 |
2,500.00 |
| 202-02-03 |
removal of mobile home (rt. of sta. 11+196; 4m x 16m)
|
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-04 |
removal of metal bldg (lt. of sta. 11+490; 12m x 22.5m)
|
1   |
ea |
1.00 |
1.00 |
7,500.00 |
7,500.00 |
7,000.00 |
7,000.00 |
7,000.00 |
7,000.00 |
| 202-02-05 |
removal of cinder block & wood bldg (lt. of sta.
11+575; 10m x 23m) |
1   |
ea |
1.00 |
1.00 |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
6,500.00 |
6,500.00 |
| 202-02-06 |
removal of brick house (lt. of sta. 11+753; 9m x 12m)
|
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
3,500.00 |
3,500.00 |
| 202-02-07 |
removal of wood shed (lt. of sta. 11+835; 8m x 9m)
|
1   |
ea |
1.00 |
1.00 |
1,200.00 |
1,200.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-08 |
removal of brick house (lt. of sta. 11+875; 10m x 24m)
|
1   |
ea |
1.00 |
1.00 |
7,500.00 |
7,500.00 |
6,000.00 |
6,000.00 |
6,500.00 |
6,500.00 |
| 202-02-09 |
removal of wood carport (lt. of sta. 11+964; 3m x 6m)
|
1   |
ea |
1.00 |
1.00 |
1,200.00 |
1,200.00 |
500.00 |
500.00 |
500.00 |
500.00 |
| 202-02-10 |
removal of metal building (rt. of sta. 12+007; 6m x 6m)
|
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 202-02-11 |
removal of metal building (rt. of sta. 12+014; 14m x
13m) |
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
4,900.00 |
4,900.00 |
| 202-02-12 |
removal of metal building (rt. of sta. 12+038; 14m x
8.5m) |
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
3,200.00 |
3,200.00 |
| 202-02-13 |
removal of wood bldg (centerline sta. 12+070; 5m x 16m)
|
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-14 |
removal of pump island & canopy (rt. of sta. 13+840;
7m x 10m) |
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
| 202-02-15 |
removal of wood frame house (rt. of sta. 14+175; 10m x
18m) |
1   |
ea |
1.00 |
1.00 |
7,500.00 |
7,500.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
| 202-02-16 |
removal of wood bldg (rt. of sta. 14+681; 7m x 11m)
|
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-17 |
removal of brick house (rt. of sta. 15+074; 21m x 14m)
|
1   |
ea |
1.00 |
1.00 |
8,000.00 |
8,000.00 |
7,000.00 |
7,000.00 |
7,500.00 |
7,500.00 |
| 202-02-18 |
removal of concrete bldg (lt. of sta. 16+500; 11m x
20m) |
1   |
ea |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
| 202-02-19 |
removal of pump islands & metal canopy (lt. of sta.
16+520; 12m x 22m) |
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
| 202-02-20 |
removal of metal bldg (portion in r/w)(lt. of sta.
17+125; 3m x 11m) |
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 202-02-21 |
removal of pump island & metal canopy (lt. of sta.
17+244; 4m x 12m) |
1   |
ea |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
| 202-02-22 |
removal of wood frame house (centerline of sta. 10+088;
9.5m x 16.5m) |
1   |
ea |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
| 202-02-23 |
removal of underground storage tanks (rt. of sta.
13+840; 2 - 10,000 gal tanks) |
2   |
ea |
8,000.00 |
16,000.00 |
14,000.00 |
28,000.00 |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
| 202-02-24 |
removal of underground storage tanks (lt. of sta.
16+520; 3 - 12,000 gal tanks) |
3   |
ea |
8,500.00 |
25,500.00 |
16,000.00 |
48,000.00 |
3,000.00 |
9,000.00 |
3,500.00 |
10,500.00 |
| 202-02-25 |
removal of cattle guard (sta. 16+662 lt.)
|
1   |
ea |
1.00 |
1.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
750.00 |
750.00 |
| 202-03-01 |
relocation of flashing warning sign (rt. of sta. 13 +
475) |
1   |
ea |
1,500.00 |
1,500.00 |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-03-02 |
relocation of flashing warning sign (lt. of sta. 13 +
980) |
1   |
ea |
1,500.00 |
1,500.00 |
3,500.00 |
3,500.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
| 202-05 |
excavation, disposal and backfilling of contaminated
soil |
1,579   |
cu m |
85.00 |
134,215.00 |
165.00 |
260,535.00 |
100.00 |
157,900.00 |
115.00 |
181,585.00 |
| 202-06 |
removal and disposal of contaminated fluid
|
1,893   |
l |
0.30 |
567.90 |
0.35 |
662.55 |
0.30 |
567.90 |
1.50 |
2,839.50 |
| 203-01-A |
general excavation (plan quantity measurement)
|
76,782   |
cu m |
5.20 |
399,266.40 |
4.75 |
364,714.50 |
5.50 |
422,301.00 |
5.00 |
383,910.00 |
| 203-02 |
drainage excavation
|
1,031   |
cu m |
12.00 |
12,372.00 |
10.00 |
10,310.00 |
25.00 |
25,775.00 |
15.00 |
15,465.00 |
| 203-04-A |
embankment (plan quanity measurement)
|
179,111   |
cu m |
9.00 |
1,611,999.00 |
9.25 |
1,656,776.75 |
12.00 |
2,149,332.00 |
8.00 |
1,432,888.00 |
| 204-02 |
temporary hay or straw bales
|
3,759   |
ea |
5.00 |
18,795.00 |
5.00 |
18,795.00 |
4.00 |
15,036.00 |
5.00 |
18,795.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
147   |
ea |
100.00 |
14,700.00 |
250.00 |
36,750.00 |
65.00 |
9,555.00 |
100.00 |
14,700.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
7   |
ea |
500.00 |
3,500.00 |
1,000.00 |
7,000.00 |
300.00 |
2,100.00 |
350.00 |
2,450.00 |
| 204-06 |
temporary silt fencing
|
32,324   |
ln m |
3.00 |
96,972.00 |
1.00 |
32,324.00 |
2.45 |
79,193.80 |
3.00 |
96,972.00 |
| 302-02-D |
class ii base course (300 mm thick)
|
6,731.9 |
sq m |
23.00 |
154,833.70 |
23.00 |
154,833.70 |
18.00 |
121,174.20 |
24.00 |
161,565.60 |
| 302-02-E |
class ii base course (200 mm thick)
|
176,203.4 |
sq m |
10.60 |
1,867,756.04 |
13.00 |
2,290,644.20 |
12.00 |
2,114,440.80 |
16.00 |
2,819,254.40 |
| 304-01 |
lime
|
1,412.00 |
Mg |
105.00 |
148,260.00 |
55.00 |
77,660.00 |
100.00 |
141,200.00 |
110.50 |
156,026.00 |
| 304-03-D |
lime treatment (type c) (300 mm thick)
|
91,800   |
sq m |
2.00 |
183,600.00 |
0.10 |
9,180.00 |
1.50 |
137,700.00 |
2.00 |
183,600.00 |
| 305-01 |
subgrade layer (300mm thick)
|
182,936   |
sq m |
6.40 |
1,170,790.40 |
5.50 |
1,006,148.00 |
7.50 |
1,372,020.00 |
6.40 |
1,170,790.40 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
81   |
cu m |
65.00 |
5,265.00 |
85.00 |
6,885.00 |
55.00 |
4,455.00 |
40.00 |
3,240.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,000.0 |
cu m |
65.00 |
130,000.00 |
60.00 |
120,000.00 |
45.00 |
90,000.00 |
65.00 |
130,000.00 |
| 502-01 |
superpave asphaltic concrete
|
3,751.4 |
Mg |
110.00 |
412,654.00 |
85.00 |
318,869.00 |
120.00 |
450,168.00 |
100.50 |
377,015.70 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,285.2 |
Mg |
170.00 |
218,484.00 |
100.00 |
128,520.00 |
180.00 |
231,336.00 |
150.00 |
192,780.00 |
| 509-01 |
cold planing asphaltic pavement
|
58,652   |
sq m |
1.70 |
99,708.40 |
1.30 |
76,247.60 |
3.00 |
175,956.00 |
1.75 |
102,641.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,933   |
cu m |
0.01 |
- 29.33 |
1.00 |
- 2,933.00 |
0.01 |
- 29.33 |
0.01 |
- 29.33 |
| 601-01-I |
portland cement concrete pavement (225 mm thick)
|
162,697.6 |
sq m |
36.40 |
5,922,192.64 |
40.00 |
6,507,904.00 |
39.00 |
6,345,206.40 |
48.50 |
7,890,833.60 |
| 601-02-I |
portland cement concrete pavement (225 mm thick)
(crossovers & turnouts) |
8,450.6 |
sq m |
52.00 |
439,431.20 |
50.00 |
422,530.00 |
50.00 |
422,530.00 |
62.00 |
523,937.20 |
| 601-04 |
portland cement concrete pavement coring
|
214   |
ea |
100.00 |
21,400.00 |
90.00 |
19,260.00 |
110.00 |
23,540.00 |
120.00 |
25,680.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
70.0 |
ln m |
270.00 |
18,900.00 |
250.00 |
17,500.00 |
330.00 |
23,100.00 |
340.00 |
23,800.00 |
| 701-02-I |
cross drain pipe arch (1350 mm equiv. rcpa)
|
36.5 |
ln m |
450.00 |
16,425.00 |
560.00 |
20,440.00 |
800.00 |
29,200.00 |
580.00 |
21,170.00 |
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
7,579.1 |
ln m |
110.00 |
833,701.00 |
90.00 |
682,119.00 |
140.00 |
1,061,074.00 |
100.00 |
757,910.00 |
| 701-03-F-01 |
storm drain pipe (375 mm rcvccp) (outfall)
|
12.0 |
ln m |
160.00 |
1,920.00 |
180.00 |
2,160.00 |
230.00 |
2,760.00 |
160.00 |
1,920.00 |
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
1,344.0 |
ln m |
130.00 |
174,720.00 |
105.00 |
141,120.00 |
170.00 |
228,480.00 |
110.00 |
147,840.00 |
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
2,003.0 |
ln m |
150.00 |
300,450.00 |
140.00 |
280,420.00 |
210.00 |
420,630.00 |
135.00 |
270,405.00 |
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
1,058.0 |
ln m |
210.00 |
222,180.00 |
185.00 |
195,730.00 |
260.00 |
275,080.00 |
175.00 |
185,150.00 |
| 701-03-M |
storm drain pipe (900 mm rcp/pcp)
|
527.0 |
ln m |
260.00 |
137,020.00 |
250.00 |
131,750.00 |
320.00 |
168,640.00 |
220.00 |
115,940.00 |
| 701-03-M-01 |
storm drain pipe (900 mm rcvccp) (outfall)
|
7.5 |
ln m |
360.00 |
2,700.00 |
410.00 |
3,075.00 |
400.00 |
3,000.00 |
360.00 |
2,700.00 |
| 701-03-N |
storm drain pipe (1050 mm rcp/pcp)
|
292.7 |
ln m |
340.00 |
99,518.00 |
350.00 |
102,445.00 |
400.00 |
117,080.00 |
320.00 |
93,664.00 |
| 701-03-N-01 |
storm drain pipe (1050 mm rcvccp) (outfall)
|
11.0 |
ln m |
400.00 |
4,400.00 |
550.00 |
6,050.00 |
320.00 |
3,520.00 |
360.00 |
3,960.00 |
| 701-03-O |
storm drain pipe (1200 mm rcp/pcp)
|
258.0 |
ln m |
400.00 |
103,200.00 |
450.00 |
116,100.00 |
570.00 |
147,060.00 |
450.00 |
116,100.00 |
| 701-03-P |
storm drain pipe (1350 mm rcp/pcp)
|
156.5 |
ln m |
460.00 |
71,990.00 |
525.00 |
82,162.50 |
600.00 |
93,900.00 |
470.00 |
73,555.00 |
| 701-03-S |
storm drain pipe (1800 mm rcp/pcp)
|
118.0 |
ln m |
800.00 |
94,400.00 |
920.00 |
108,560.00 |
820.00 |
96,760.00 |
760.00 |
89,680.00 |
| 701-04-A |
storm drain pipe arch (375 mm equiv. rcpa)
|
46.0 |
ln m |
170.00 |
7,820.00 |
150.00 |
6,900.00 |
200.00 |
9,200.00 |
160.00 |
7,360.00 |
| 701-05-G |
side drain pipe (450 mm)
|
359.0 |
ln m |
130.00 |
46,670.00 |
125.00 |
44,875.00 |
160.00 |
57,440.00 |
95.00 |
34,105.00 |
| 701-05-I |
side drain pipe (600 mm)
|
91.0 |
ln m |
160.00 |
14,560.00 |
200.00 |
18,200.00 |
250.00 |
22,750.00 |
120.00 |
10,920.00 |
| 701-05-I-01 |
side drain pipe (600 mm) (erosion)
|
13.0 |
ln m |
200.00 |
2,600.00 |
210.00 |
2,730.00 |
220.00 |
2,860.00 |
120.00 |
1,560.00 |
| 701-05-M |
side drain pipe (900 mm)
|
25.0 |
ln m |
300.00 |
7,500.00 |
300.00 |
7,500.00 |
310.00 |
7,750.00 |
170.00 |
4,250.00 |
| 702-02-F |
manholes (mh-01)
|
4   |
ea |
3,000.00 |
12,000.00 |
4,000.00 |
16,000.00 |
3,000.00 |
12,000.00 |
4,000.00 |
16,000.00 |
| 702-02-G |
manholes (r-cb-36)
|
17   |
ea |
3,300.00 |
56,100.00 |
5,500.00 |
93,500.00 |
3,200.00 |
54,400.00 |
3,250.00 |
55,250.00 |
| 702-03-A |
catch basins (cb-01)
|
77   |
ea |
2,000.00 |
154,000.00 |
2,500.00 |
192,500.00 |
2,700.00 |
207,900.00 |
2,300.00 |
177,100.00 |
| 702-03-B |
catch basins (cb-02)
|
5   |
ea |
3,000.00 |
15,000.00 |
3,200.00 |
16,000.00 |
4,100.00 |
20,500.00 |
4,300.00 |
21,500.00 |
| 702-03-C |
catch basins (cb-06)
|
277   |
ea |
2,600.00 |
720,200.00 |
2,500.00 |
692,500.00 |
3,600.00 |
997,200.00 |
3,100.00 |
858,700.00 |
| 702-03-D |
catch basins (cb-07)
|
51   |
ea |
4,000.00 |
204,000.00 |
3,500.00 |
178,500.00 |
4,000.00 |
204,000.00 |
4,500.00 |
229,500.00 |
| 702-03-F |
catch basins (cb-08)
|
37   |
ea |
5,200.00 |
192,400.00 |
7,500.00 |
277,500.00 |
7,500.00 |
277,500.00 |
7,000.00 |
259,000.00 |
| 702-03-G |
catch basins (cb-09)
|
13   |
ea |
3,200.00 |
41,600.00 |
5,000.00 |
65,000.00 |
3,500.00 |
45,500.00 |
6,000.00 |
78,000.00 |
| 702-03-I |
catch basins (paved gutter drain)
|
20   |
ea |
1,500.00 |
30,000.00 |
2,500.00 |
50,000.00 |
2,000.00 |
40,000.00 |
3,100.00 |
62,000.00 |
| 702-03-J |
catch basins (cb-04)
|
43   |
ea |
1,600.00 |
68,800.00 |
2,400.00 |
103,200.00 |
2,200.00 |
94,600.00 |
1,500.00 |
64,500.00 |
| 702-04-A |
adjusting manholes
|
20   |
ea |
1,000.00 |
20,000.00 |
1,500.00 |
30,000.00 |
350.00 |
7,000.00 |
1,500.00 |
30,000.00 |
| 703-01 |
shoulder underdrain systems
|
500   |
ln m |
25.00 |
12,500.00 |
25.00 |
12,500.00 |
75.00 |
37,500.00 |
30.00 |
15,000.00 |
| 703-02 |
shoulder outlet underdrains
|
8   |
ea |
400.00 |
3,200.00 |
420.00 |
3,360.00 |
1,000.00 |
8,000.00 |
450.00 |
3,600.00 |
| 703-03 |
perforated pipe underdrains
|
13,650   |
ln m |
22.00 |
300,300.00 |
17.00 |
232,050.00 |
25.00 |
341,250.00 |
12.00 |
163,800.00 |
| 705-01 |
barbed wire fence
|
71   |
ln m |
17.50 |
1,242.50 |
16.00 |
1,136.00 |
18.00 |
1,278.00 |
16.00 |
1,136.00 |
| 705-02 |
combination mesh & barbed wire fence
|
215   |
ln m |
21.00 |
4,515.00 |
18.00 |
3,870.00 |
20.00 |
4,300.00 |
16.00 |
3,440.00 |
| 705-03 |
single swinging walk gates
|
1   |
ea |
250.00 |
250.00 |
250.00 |
250.00 |
250.00 |
250.00 |
200.00 |
200.00 |
| 705-04 |
single swinging driveway gates
|
3   |
ea |
400.00 |
1,200.00 |
450.00 |
1,350.00 |
400.00 |
1,200.00 |
400.00 |
1,200.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
382   |
ln m |
42.00 |
16,044.00 |
65.00 |
24,830.00 |
45.00 |
17,190.00 |
60.00 |
22,920.00 |
| 705-06-B |
chain link fence (1500 mm height)
|
73   |
ln m |
56.00 |
4,088.00 |
75.00 |
5,475.00 |
60.00 |
4,380.00 |
66.00 |
4,818.00 |
| 705-06-D |
chain link fence (2100 mm height)
|
73   |
ln m |
94.00 |
6,862.00 |
110.00 |
8,030.00 |
100.00 |
7,300.00 |
101.00 |
7,373.00 |
| 705-07-A |
4-meter single gates for chain link fence (1200mm
height) |
5   |
ea |
800.00 |
4,000.00 |
600.00 |
3,000.00 |
850.00 |
4,250.00 |
500.00 |
2,500.00 |
| 705-07-D |
4-meter single gates for chain link fence (2100mm
height) |
1   |
ea |
1,000.00 |
1,000.00 |
1,100.00 |
1,100.00 |
1,050.00 |
1,050.00 |
1,000.00 |
1,000.00 |
| 705-08-A |
8-meter double gates for chain link fence (1200mm
height) |
1   |
dbgt |
1,500.00 |
1,500.00 |
550.00 |
550.00 |
1,550.00 |
1,550.00 |
500.00 |
500.00 |
| 706-01-A |
concrete walk (100 mm thick)
|
22.1 |
sq m |
55.00 |
1,215.50 |
70.00 |
1,547.00 |
75.00 |
1,657.50 |
80.00 |
1,768.00 |
| 706-02-C |
concrete drive (150 mm thick)
|
15,270.0 |
sq m |
45.00 |
687,150.00 |
42.00 |
641,340.00 |
40.00 |
610,800.00 |
45.00 |
687,150.00 |
| 707-01 |
concrete curb
|
16,880.0 |
ln m |
12.00 |
202,560.00 |
15.00 |
253,200.00 |
8.00 |
135,040.00 |
16.00 |
270,080.00 |
| 707-03 |
combination concrete curb & gutter
|
84.0 |
ln m |
100.00 |
8,400.00 |
75.00 |
6,300.00 |
35.00 |
2,940.00 |
90.00 |
7,560.00 |
| 708-01 |
right-of-way monument
|
243   |
ea |
120.00 |
29,160.00 |
300.00 |
72,900.00 |
200.00 |
48,600.00 |
110.00 |
26,730.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
200,000.00 |
200,000.00 |
240,000.00 |
240,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
| 713-04-A-01 |
temporary pvmt. markings (broken line)(100 mm w)(1.2 m
l)(type 1 removable) |
0.500 |
km |
4,000.00 |
2,000.00 |
2,200.00 |
1,100.00 |
1,600.00 |
800.00 |
2,000.00 |
1,000.00 |
| 713-04-C-01 |
temporary pvmt. markings (broken line)(100 mm w)(0.6 m
l)(type 1 removable) |
1.000 |
km |
1,500.00 |
1,500.00 |
1,600.00 |
1,600.00 |
1,500.00 |
1,500.00 |
4,000.00 |
4,000.00 |
| 713-05-A |
temporary pavement markings (solid line)(100 mm width)
|
30.100 |
km |
300.00 |
9,030.00 |
320.00 |
9,632.00 |
300.00 |
9,030.00 |
600.00 |
18,060.00 |
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
74.500 |
km |
5,800.00 |
432,100.00 |
5,800.00 |
432,100.00 |
5,800.00 |
432,100.00 |
9,000.00 |
670,500.00 |
| 713-06-A-01 |
temporary pavement legends and symbols (arrow)(type 1)
(removable) |
4   |
ea |
200.00 |
800.00 |
220.00 |
880.00 |
500.00 |
2,000.00 |
550.00 |
2,200.00 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
70   |
ea |
140.00 |
9,800.00 |
250.00 |
17,500.00 |
125.00 |
8,750.00 |
400.00 |
28,000.00 |
| 716-01-A |
mulch (vegetative)
|
28.7 |
hctr |
900.00 |
25,830.00 |
1,300.00 |
37,310.00 |
900.00 |
25,830.00 |
1,250.00 |
35,875.00 |
| 717-01 |
seeding
|
3,091   |
kg |
11.50 |
35,546.50 |
9.00 |
27,819.00 |
12.00 |
37,092.00 |
10.00 |
30,910.00 |
| 718-01 |
fertilizer
|
70,762   |
kg |
0.40 |
28,304.80 |
0.60 |
42,457.20 |
0.50 |
35,381.00 |
0.56 |
39,626.72 |
| 720-01-A |
erosion control system, slope protection (type a)
|
9,819   |
sq m |
1.00 |
9,819.00 |
1.25 |
12,273.75 |
1.30 |
12,764.70 |
1.20 |
11,782.80 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
4,653   |
sq m |
1.00 |
4,653.00 |
2.00 |
9,306.00 |
1.50 |
6,979.50 |
1.80 |
8,375.40 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
615   |
sq m |
1.00 |
615.00 |
4.00 |
2,460.00 |
5.00 |
3,075.00 |
3.60 |
2,214.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
ea |
35,000.00 |
35,000.00 |
25,000.00 |
25,000.00 |
12,000.00 |
12,000.00 |
15,000.00 |
15,000.00 |
| 725-02 |
temporary detour roads
|
13,829.3 |
sq m |
56.00 |
774,440.80 |
60.00 |
829,758.00 |
95.00 |
1,313,783.50 |
64.00 |
885,075.20 |
| 726-01 |
bedding material
|
7,900.5 |
cu m |
45.00 |
355,522.50 |
35.00 |
276,517.50 |
80.00 |
632,040.00 |
60.00 |
474,030.00 |
| 727-01 |
mobilization
|
lump |
lump |
2,200,000.00 |
2,200,000.00 |
2,400,000.00 |
2,400,000.00 |
2,000,000.00 |
2,000,000.00 |
3,000,000.00 |
3,000,000.00 |
| 729-01 |
sign (type a)
|
0.94 |
sq m |
400.00 |
376.00 |
400.00 |
376.00 |
250.00 |
235.00 |
300.00 |
282.00 |
| 729-19-A |
dead end road installation (type a)
|
1   |
ea |
4,000.00 |
4,000.00 |
3,200.00 |
3,200.00 |
3,230.00 |
3,230.00 |
3,500.00 |
3,500.00 |
| 729-21 |
u-channel post
|
1   |
ea |
200.00 |
200.00 |
110.00 |
110.00 |
70.00 |
70.00 |
150.00 |
150.00 |
| 731-02 |
reflectorized raised pavement markers
|
3,914   |
ea |
5.00 |
19,570.00 |
5.50 |
21,527.00 |
5.00 |
19,570.00 |
7.50 |
29,355.00 |
| 732-01-A |
plastic pavement striping (100 mm width)
|
3,258   |
ln m |
1.40 |
4,561.20 |
1.40 |
4,561.20 |
1.50 |
4,887.00 |
3.50 |
11,403.00 |
| 732-01-C |
plastic pavement striping (200 mm width)
|
372   |
ln m |
2.70 |
1,004.40 |
2.75 |
1,023.00 |
2.75 |
1,023.00 |
20.00 |
7,440.00 |
| 732-01-E |
plastic pavement striping (600 mm width)
|
530   |
ln m |
8.00 |
4,240.00 |
8.00 |
4,240.00 |
8.00 |
4,240.00 |
22.00 |
11,660.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
33.650 |
km |
1,100.00 |
37,015.00 |
1,200.00 |
40,380.00 |
1,200.00 |
40,380.00 |
3,925.00 |
132,076.25 |
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mm width)
preformed marking tape - (type v) |
30.394 |
km |
2,500.00 |
75,985.00 |
2,600.00 |
79,024.40 |
2,500.00 |
75,985.00 |
3,650.00 |
110,938.10 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
99   |
ea |
130.00 |
12,870.00 |
150.00 |
14,850.00 |
125.00 |
12,375.00 |
400.00 |
39,600.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
19   |
ea |
130.00 |
2,470.00 |
150.00 |
2,850.00 |
125.00 |
2,375.00 |
600.00 |
11,400.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
ea |
400.00 |
800.00 |
400.00 |
800.00 |
375.00 |
750.00 |
1,850.00 |
3,700.00 |
| 735-01 |
mailboxes
|
174   |
ea |
1.00 |
174.00 |
25.00 |
4,350.00 |
1.00 |
174.00 |
25.00 |
4,350.00 |
| 735-02 |
mailbox supports (single)
|
168   |
ea |
100.00 |
16,800.00 |
175.00 |
29,400.00 |
100.00 |
16,800.00 |
130.00 |
21,840.00 |
| 735-04 |
mailbox supports (multiple)
|
2   |
ea |
230.00 |
460.00 |
350.00 |
700.00 |
225.00 |
450.00 |
350.00 |
700.00 |
| 736-01 |
trenching and backfilling
|
472   |
ln m |
10.00 |
4,720.00 |
13.00 |
6,136.00 |
10.00 |
4,720.00 |
10.00 |
4,720.00 |
| 736-04-A |
signal support (9.14m length, galvanized steel strain
pole) |
8   |
ea |
5,200.00 |
41,600.00 |
6,000.00 |
48,000.00 |
5,200.00 |
41,600.00 |
5,200.00 |
41,600.00 |
| 736-04-B |
signal support (7.62m (25') mast arm pole)
|
1   |
ea |
6,500.00 |
6,500.00 |
7,000.00 |
7,000.00 |
6,500.00 |
6,500.00 |
6,500.00 |
6,500.00 |
| 736-05-A |
signal heads, 3 section (r,y,g)
|
13   |
ea |
650.00 |
8,450.00 |
600.00 |
7,800.00 |
650.00 |
8,450.00 |
650.00 |
8,450.00 |
| 736-05-B |
signal heads, 5 section (r,y, |
1   |
ea |
850.00 |
850.00 |
850.00 |
850.00 |
850.00 |
850.00 |
860.00 |
860.00 |
| 736-06 |
signal service
|
1   |
ea |
800.00 |
800.00 |
575.00 |
575.00 |
800.00 |
800.00 |
800.00 |
800.00 |
| 736-06-B |
signal service, 9.14m (30') wood pole class 5 cca
|
1   |
each |
400.00 |
400.00 |
1,200.00 |
1,200.00 |
400.00 |
400.00 |
400.00 |
400.00 |
| 736-08 |
signal controller
|
2   |
ea |
15,000.00 |
30,000.00 |
15,000.00 |
30,000.00 |
15,000.00 |
30,000.00 |
15,000.00 |
30,000.00 |
| 736-09 |
loop detector
|
270   |
ln m |
40.00 |
10,800.00 |
50.00 |
13,500.00 |
40.00 |
10,800.00 |
40.00 |
10,800.00 |
| 736-10-A |
underground junction box, type d
|
11   |
ea |
300.00 |
3,300.00 |
375.00 |
4,125.00 |
300.00 |
3,300.00 |
300.00 |
3,300.00 |
| 736-10-B |
underground junction box, type e
|
1   |
ea |
450.00 |
450.00 |
550.00 |
550.00 |
450.00 |
450.00 |
450.00 |
450.00 |
| 736-11-A |
conduit (25mm dia polyethylene)
|
9   |
ln m |
10.00 |
90.00 |
25.00 |
225.00 |
10.00 |
90.00 |
10.00 |
90.00 |
| 736-11-B |
conduit (51mm dia polyethylene)
|
451   |
ln m |
12.00 |
5,412.00 |
9.00 |
4,059.00 |
12.00 |
5,412.00 |
12.00 |
5,412.00 |
| 736-11-C |
conduit (75mm dia polyethylene)
|
36   |
ln m |
15.00 |
540.00 |
20.00 |
720.00 |
15.00 |
540.00 |
15.00 |
540.00 |
| 736-12-A |
conductor (6c signal / #14 awg)
|
75   |
ln m |
4.00 |
300.00 |
7.50 |
562.50 |
4.00 |
300.00 |
4.00 |
300.00 |
| 736-12-B |
conductor (2c loop lead-in / #16 awg)
|
619   |
ln m |
3.00 |
1,857.00 |
2.25 |
1,392.75 |
3.00 |
1,857.00 |
3.00 |
1,857.00 |
| 736-12-C |
conductor, power
|
9   |
ln m |
9.00 |
81.00 |
22.00 |
198.00 |
9.00 |
81.00 |
9.00 |
81.00 |
| 736-12-D |
conductor, (10c signal / #14 awg)
|
3   |
ln m |
10.00 |
30.00 |
22.00 |
66.00 |
10.00 |
30.00 |
10.00 |
30.00 |
| 736-12-E |
conductor (3c blank-out signs)
|
6   |
ln m |
10.00 |
60.00 |
22.00 |
132.00 |
10.00 |
60.00 |
10.00 |
60.00 |
| 736-12-F |
conductor (3c signal cable)
|
318   |
ln m |
4.00 |
1,272.00 |
5.50 |
1,749.00 |
4.00 |
1,272.00 |
4.00 |
1,272.00 |
| 736-12-G |
conductor (2c railroad preemption)
|
28   |
ln m |
3.00 |
84.00 |
22.00 |
616.00 |
3.00 |
84.00 |
3.00 |
84.00 |
| 740-01 |
construction layout
|
lump |
lump |
350,000.00 |
350,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
350,000.00 |
350,000.00 |
| 741-09 |
adjusting water house connections
|
174   |
ea |
400.00 |
69,600.00 |
100.00 |
17,400.00 |
250.00 |
43,500.00 |
400.00 |
69,600.00 |
| 741-10 |
adjusting water service lines
|
964   |
ln m |
60.00 |
57,840.00 |
20.00 |
19,280.00 |
50.00 |
48,200.00 |
60.00 |
57,840.00 |
| 741-11 |
adjusting water valve and meter box
|
186   |
ea |
600.00 |
111,600.00 |
125.00 |
23,250.00 |
400.00 |
74,400.00 |
550.00 |
102,300.00 |
| 742-01-C-01 |
sanitary sewer pipe (ductile iron pipe)(200mm)
|
20   |
ln m |
200.00 |
4,000.00 |
150.00 |
3,000.00 |
200.00 |
4,000.00 |
85.00 |
1,700.00 |
| 742-01-C-02 |
sanitary sewer pipe (pvc pipe)(200mm)
|
898   |
ln m |
120.00 |
107,760.00 |
150.00 |
134,700.00 |
100.00 |
89,800.00 |
123.00 |
110,454.00 |
| 742-01-D-01 |
sanitary sewer pipe (ductile pipe)(250mm)
|
8   |
ln m |
200.00 |
1,600.00 |
225.00 |
1,800.00 |
500.00 |
4,000.00 |
125.00 |
1,000.00 |
| 742-01-D-02 |
sanitary sewer pipe (pvc pipe)(250mm)
|
100   |
ln m |
120.00 |
12,000.00 |
150.00 |
15,000.00 |
100.00 |
10,000.00 |
123.00 |
12,300.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
51   |
ea |
700.00 |
35,700.00 |
100.00 |
5,100.00 |
1,300.00 |
66,300.00 |
700.00 |
35,700.00 |
| 742-03 |
adjusting sanitary sewer service lines
|
510   |
ln m |
100.00 |
51,000.00 |
25.00 |
12,750.00 |
100.00 |
51,000.00 |
100.00 |
51,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
25,000.00 |
105,000.00 |
105,000.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
14.91 |
cu m |
900.00 |
13,419.00 |
1,000.00 |
14,910.00 |
1,000.00 |
14,910.00 |
1,050.00 |
15,655.50 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
92.81 |
cu m |
900.00 |
83,529.00 |
1,200.00 |
111,372.00 |
1,000.00 |
92,810.00 |
1,290.00 |
119,724.90 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
480.60 |
ln m |
600.00 |
288,360.00 |
750.00 |
360,450.00 |
640.00 |
307,584.00 |
850.00 |
408,510.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
105.60 |
ln m |
850.00 |
89,760.00 |
900.00 |
95,040.00 |
690.00 |
72,864.00 |
1,200.00 |
126,720.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
105.00 |
ln m |
1,100.00 |
115,500.00 |
1,200.00 |
126,000.00 |
900.00 |
94,500.00 |
1,500.00 |
157,500.00 |
| 806-01 |
deformed reinforcing steel
|
4,751   |
kg |
2.00 |
9,502.00 |
2.50 |
11,877.50 |
2.50 |
11,877.50 |
3.00 |
14,253.00 |
| S-001 |
portable impact attenuator
|
10   |
ea |
10,000.00 |
100,000.00 |
19,000.00 |
190,000.00 |
16,500.00 |
165,000.00 |
16,500.00 |
165,000.00 |
| S-002 |
blank-out signs
|
2   |
ea |
3,500.00 |
7,000.00 |
1,800.00 |
3,600.00 |
1,800.00 |
3,600.00 |
1,800.00 |
3,600.00 |
| S-003 |
signal ahead warning sign with flashing beacons
|
1   |
ea |
2,000.00 |
2,000.00 |
1,600.00 |
1,600.00 |
1,300.00 |
1,300.00 |
1,400.00 |
1,400.00 |
| S-004 |
utility oversight and coordination
|
lump |
lump |
60,000.00 |
60,000.00 |
25,000.00 |
25,000.00 |
1,000.00 |
1,000.00 |
250,000.00 |
250,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
25,584,662.41 |
|
26,145,744.75 |
|
28,489,705.87 |
|
30,469,673.54 |
|