| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - SEALEVEL CONSTRUCTION INC |
- 3 - GRAY CONSTRUCTION CORP. |
- 4 - KOSTMAYER CONSTRUCTION, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
500.00 |
500.00 |
6,000.00 |
6,000.00 |
8,250.00 |
8,250.00 |
14,000.00 |
14,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
41   |
SQYD |
10.00 |
410.00 |
10.00 |
410.00 |
124.00 |
5,084.00 |
10.00 |
410.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
126.0 |
LNFT |
10.00 |
1,260.00 |
3.00 |
378.00 |
4.50 |
567.00 |
6.00 |
756.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,000.00 |
15,000.00 |
30,000.00 |
30,000.00 |
41,100.00 |
41,100.00 |
48,000.00 |
48,000.00 |
| 203-08 |
borrow (vehicular measurement)
|
264   |
CUYD |
23.00 |
6,072.00 |
20.00 |
5,280.00 |
18.80 |
4,963.20 |
15.00 |
3,960.00 |
| 203-09 |
geotextile fabric
|
7,676   |
SQYD |
1.10 |
8,443.60 |
1.00 |
7,676.00 |
1.86 |
14,277.36 |
1.20 |
9,211.20 |
| 302-01-A |
class ii base course (410 stone)
|
4.8 |
CUYD |
200.00 |
960.00 |
100.00 |
480.00 |
260.00 |
1,248.00 |
140.00 |
672.00 |
| 302-01-B |
class ii base course (stone)
|
1,350.0 |
CUYD |
62.00 |
83,700.00 |
80.00 |
108,000.00 |
75.60 |
102,060.00 |
16.00 |
21,600.00 |
| 502-01-A |
superpave asphaltic concrete, paved drives and
turnouts |
1,266.0 |
TON |
78.00 |
98,748.00 |
128.00 |
162,048.00 |
107.00 |
135,462.00 |
170.00 |
215,220.00 |
| 701-03-G |
storm drain pipe (18" cmp)
|
60   |
LNFT |
50.00 |
3,000.00 |
25.00 |
1,500.00 |
22.00 |
1,320.00 |
58.00 |
3,480.00 |
| 701-03-I-01 |
storm drain pipe (24" cmp)
|
50   |
LNFT |
50.00 |
2,500.00 |
34.00 |
1,700.00 |
28.00 |
1,400.00 |
61.00 |
3,050.00 |
| 701-03-I-02 |
storm drain pipe (24" rcp)
|
20   |
LNFT |
50.00 |
1,000.00 |
60.00 |
1,200.00 |
52.00 |
1,040.00 |
79.00 |
1,580.00 |
| 701-06-E |
side drain pipe arch (30" equiv. cmpa)
|
375   |
LNFT |
50.00 |
18,750.00 |
42.00 |
15,750.00 |
35.00 |
13,125.00 |
68.00 |
25,500.00 |
| 701-07-C |
yard drain pipe (8"cmp)
|
12   |
LNFT |
50.00 |
600.00 |
24.00 |
288.00 |
24.00 |
288.00 |
37.00 |
444.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
55   |
LNFT |
50.00 |
2,750.00 |
65.00 |
3,575.00 |
50.00 |
2,750.00 |
91.00 |
5,005.00 |
| 701-12-I |
corrugated metal pipe (extension)(24")
|
20   |
LNFT |
50.00 |
1,000.00 |
42.00 |
840.00 |
34.00 |
680.00 |
79.00 |
1,580.00 |
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
3,400.00 |
23,800.00 |
1,700.00 |
11,900.00 |
1,560.00 |
10,920.00 |
2,650.00 |
18,550.00 |
| 705-06-A |
chain link fence (4-foot height)
|
230   |
LNFT |
13.00 |
2,990.00 |
17.00 |
3,910.00 |
21.40 |
4,922.00 |
30.00 |
6,900.00 |
| 705-07-A |
5-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
500.00 |
500.00 |
700.00 |
700.00 |
1,500.00 |
1,500.00 |
700.00 |
700.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
15.0 |
SQYD |
80.00 |
1,200.00 |
50.00 |
750.00 |
88.00 |
1,320.00 |
60.00 |
900.00 |
| 707-01 |
concrete curb
|
315.0 |
LNFT |
25.00 |
7,875.00 |
8.00 |
2,520.00 |
15.00 |
4,725.00 |
15.00 |
4,725.00 |
| 707-03 |
combination concrete curb & gutter
|
674.0 |
LNFT |
30.00 |
20,220.00 |
20.00 |
13,480.00 |
22.70 |
15,299.80 |
19.00 |
12,806.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
1,000.00 |
1,000.00 |
10,000.00 |
10,000.00 |
12,400.00 |
12,400.00 |
6,000.00 |
6,000.00 |
| 717-01 |
seeding(pensacola bahia)
|
74   |
LB |
23.00 |
1,702.00 |
30.00 |
2,220.00 |
18.50 |
1,369.00 |
16.00 |
1,184.00 |
| 718-01 |
fertilizer
|
74   |
LB |
1.00 |
74.00 |
3.00 |
222.00 |
1.82 |
134.68 |
1.20 |
88.80 |
| 727-01 |
mobilization
|
lump |
LUMP |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
17,600.00 |
17,600.00 |
35,000.00 |
35,000.00 |
| 729-01 |
sign (type a)
|
116.0 |
SQFT |
17.00 |
1,972.00 |
25.00 |
2,900.00 |
33.00 |
3,828.00 |
41.00 |
4,756.00 |
| 729-21 |
u-channel post
|
29   |
EACH |
100.00 |
2,900.00 |
50.00 |
1,450.00 |
74.00 |
2,146.00 |
51.00 |
1,479.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,160   |
LNFT |
3.50 |
4,060.00 |
5.00 |
5,800.00 |
3.67 |
4,257.20 |
4.00 |
4,640.00 |
| S-001 |
pipe bollard
|
5   |
EACH |
650.00 |
3,250.00 |
200.00 |
1,000.00 |
540.00 |
2,700.00 |
175.00 |
875.00 |
| S-002 |
tactile warning in concrete
|
528   |
SQFT |
65.00 |
34,320.00 |
50.00 |
26,400.00 |
48.00 |
25,344.00 |
11.00 |
5,808.00 |
| S-003 |
wheel stops
|
2   |
EACH |
40.00 |
80.00 |
50.00 |
100.00 |
102.00 |
204.00 |
57.00 |
114.00 |
| S-004 |
6" schedule 40 pipe cross drain
|
500   |
LNFT |
15.00 |
7,500.00 |
10.00 |
5,000.00 |
16.30 |
8,150.00 |
70.00 |
35,000.00 |
| S-005 |
special catch basin
|
4   |
EACH |
5,000.00 |
20,000.00 |
4,500.00 |
18,000.00 |
3,200.00 |
12,800.00 |
5,300.00 |
21,200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
387,136.60 |
|
461,477.00 |
|
463,234.24 |
|
515,194.00 |
|