| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JOHN BAILEY, INC. |
- 2 - HD TRUCK & TRACTOR, LLC |
- 3 - BESSETTE DEVELOPMENT CORP. |
- 4 - F. MILLER & SONS, LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
41   |
SQYD |
25.00 |
1,025.00 |
11.00 |
451.00 |
20.00 |
820.00 |
9.00 |
369.00 |
| 202-02-E |
removal of concrete curbs
|
226.0 |
LNFT |
10.00 |
2,260.00 |
12.95 |
2,926.70 |
10.00 |
2,260.00 |
10.00 |
2,260.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
379.5 |
SQYD |
8.00 |
3,036.00 |
5.00 |
1,897.50 |
10.00 |
3,795.00 |
7.50 |
2,846.25 |
| 202-02-I |
removal of chain link fence
|
65.0 |
LNFT |
10.00 |
650.00 |
5.00 |
325.00 |
10.00 |
650.00 |
5.00 |
325.00 |
| 203-06 |
excavation & embankment
|
lump |
LUMP |
8,500.00 |
8,500.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
| 302-02-D |
class ii base course (12" thick)
|
2,004.2 |
SQYD |
18.00 |
36,075.60 |
18.40 |
36,877.28 |
17.00 |
34,071.40 |
17.00 |
34,071.40 |
| 304-01 |
lime
|
19.71 |
TON |
145.00 |
2,857.95 |
120.00 |
2,365.20 |
100.00 |
1,971.00 |
150.00 |
2,956.50 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
2,085   |
SQYD |
4.00 |
8,340.00 |
2.50 |
5,212.50 |
3.00 |
6,255.00 |
9.00 |
18,765.00 |
| 601-01-I |
portland cement concrete pavement (9" thick)
|
1,812.7 |
SQYD |
36.00 |
65,257.20 |
39.00 |
70,695.30 |
40.00 |
72,508.00 |
44.00 |
79,758.80 |
| 701-03-I |
storm drain pipe (24" rcp)
|
14   |
LNFT |
50.00 |
700.00 |
62.00 |
868.00 |
40.00 |
560.00 |
90.00 |
1,260.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
2,000.00 |
2,000.00 |
| 702-03-C |
catch basins (cb-06)
|
1   |
EACH |
4,500.00 |
4,500.00 |
2,200.00 |
2,200.00 |
2,500.00 |
2,500.00 |
2,500.00 |
2,500.00 |
| 702-04-A |
adjusting manholes
|
1   |
EACH |
500.00 |
500.00 |
683.00 |
683.00 |
800.00 |
800.00 |
800.00 |
800.00 |
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
450.00 |
900.00 |
1,188.00 |
2,376.00 |
1,500.00 |
3,000.00 |
800.00 |
1,600.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
199.3 |
SQYD |
25.00 |
4,982.50 |
30.00 |
5,979.00 |
30.00 |
5,979.00 |
18.00 |
3,587.40 |
| 707-01 |
concrete curb
|
626.1 |
LNFT |
8.00 |
5,008.80 |
6.30 |
3,944.43 |
5.00 |
3,130.50 |
10.00 |
6,261.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 713-03-A |
temporary pavement markings (4" width)
|
1,785   |
LNFT |
0.17 |
303.45 |
0.17 |
303.45 |
0.20 |
357.00 |
0.30 |
535.50 |
| 713-03-C |
temporary pavement markings (8" width)
|
800   |
LNFT |
0.33 |
264.00 |
0.33 |
264.00 |
0.35 |
280.00 |
0.50 |
400.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
90   |
LNFT |
0.98 |
88.20 |
1.00 |
90.00 |
1.00 |
90.00 |
1.00 |
90.00 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
8   |
EACH |
54.40 |
435.20 |
55.00 |
440.00 |
55.00 |
440.00 |
60.00 |
480.00 |
| 713-06-F |
temporary pavement legends and symbols (triangle)(36")
|
8   |
EACH |
81.60 |
652.80 |
85.00 |
680.00 |
85.00 |
680.00 |
115.00 |
920.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,500.00 |
2,500.00 |
3,200.00 |
3,200.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
150   |
EACH |
5.40 |
810.00 |
5.50 |
825.00 |
6.00 |
900.00 |
6.00 |
900.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
1,785   |
LNFT |
0.39 |
696.15 |
0.40 |
714.00 |
0.40 |
714.00 |
0.50 |
892.50 |
| 732-01-C |
plastic pavement striping (8" width)
|
800   |
LNFT |
0.77 |
616.00 |
0.79 |
632.00 |
0.80 |
640.00 |
1.00 |
800.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
90   |
LNFT |
3.21 |
288.90 |
3.35 |
301.50 |
3.50 |
315.00 |
4.00 |
360.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
157.70 |
1,261.60 |
155.00 |
1,240.00 |
175.00 |
1,400.00 |
230.00 |
1,840.00 |
| 732-04-F |
plastic pavement legends & symbols (triangle)(36")
|
8   |
EACH |
217.50 |
1,740.00 |
220.00 |
1,760.00 |
220.00 |
1,760.00 |
400.00 |
3,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
1,500.00 |
1,500.00 |
4,210.00 |
4,210.00 |
4,000.00 |
4,000.00 |
6,275.00 |
6,275.00 |
| S-001 |
paved channel
|
138.0 |
LNFT |
40.00 |
5,520.00 |
36.00 |
4,968.00 |
30.00 |
4,140.00 |
110.00 |
15,180.00 |
| S-002 |
replace manhole lid
|
1   |
ea |
350.00 |
350.00 |
823.00 |
823.00 |
200.00 |
200.00 |
200.00 |
200.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
169,619.35 |
|
181,251.86 |
|
183,215.90 |
|
223,433.35 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - MCMANUS CONSTRUCTION, INC. |
QUALITY CONSTR. SPECIALISTS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
41   |
SQYD |
20.00 |
820.00 |
6.50 |
266.50 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
226.0 |
LNFT |
20.00 |
4,520.00 |
16.00 |
3,616.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
379.5 |
SQYD |
20.00 |
7,590.00 |
6.00 |
2,277.00 |
|
|
|
|
| 202-02-I |
removal of chain link fence
|
65.0 |
LNFT |
15.00 |
975.00 |
10.00 |
650.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
10,500.00 |
10,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 302-02-D |
class ii base course (12" thick)
|
2,004.2 |
SQYD |
16.00 |
32,067.20 |
20.00 |
40,084.00 |
|
|
|
|
| 304-01 |
lime
|
19.71 |
TON |
130.00 |
2,562.30 |
150.00 |
2,956.50 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
2,085   |
SQYD |
3.00 |
6,255.00 |
6.00 |
12,510.00 |
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
1,812.7 |
SQYD |
45.00 |
81,571.50 |
39.00 |
70,695.30 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp)
|
14   |
LNFT |
100.00 |
1,400.00 |
55.00 |
770.00 |
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
3,000.00 |
3,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
1   |
EACH |
2,500.00 |
2,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
1   |
EACH |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,200.00 |
2,400.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
199.3 |
SQYD |
32.00 |
6,377.60 |
32.00 |
6,377.60 |
|
|
|
|
| 707-01 |
concrete curb
|
626.1 |
LNFT |
7.00 |
4,382.70 |
18.00 |
11,269.80 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
14,500.00 |
14,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
1,785   |
LNFT |
0.40 |
714.00 |
0.20 |
357.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
800   |
LNFT |
1.00 |
800.00 |
0.35 |
280.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
90   |
LNFT |
14.00 |
1,260.00 |
1.00 |
90.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
8   |
EACH |
280.00 |
2,240.00 |
55.00 |
440.00 |
|
|
|
|
| 713-06-F |
temporary pavement legends and symbols (triangle)(36")
|
8   |
EACH |
280.00 |
2,240.00 |
82.00 |
656.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
150   |
EACH |
6.50 |
975.00 |
5.50 |
825.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
1,785   |
LNFT |
0.60 |
1,071.00 |
0.40 |
714.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
800   |
LNFT |
1.00 |
800.00 |
0.80 |
640.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
90   |
LNFT |
14.00 |
1,260.00 |
3.25 |
292.50 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
280.00 |
2,240.00 |
160.00 |
1,280.00 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (triangle)(36")
|
8   |
EACH |
280.00 |
2,240.00 |
220.00 |
1,760.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-001 |
paved channel
|
138.0 |
LNFT |
150.00 |
20,700.00 |
15.00 |
2,070.00 |
|
|
|
|
| S-002 |
replace manhole lid
|
1   |
ea |
500.00 |
500.00 |
200.00 |
200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
240,061.30 |
|
IRREGULAR |
|
|
|
|
|