Lead Project: 450-04-0086
Parish: ACADIA, LAFAYETTE, ST MARTIN, IBERVILLE
Routes: I-10
Description: CROWLEY-RAMAH
Type Const: traffic signing and related work.
 
RankLicenseBidderAmount
135541 MASTEC NORTH AMERICA INC $2,324,006.04
234068 ALPHA SERVICE AND PRODUCTS, INC. $2,503,502.78
327043 JACK B. HARPER CONTRACTOR, INC. $2,694,692.75
438764 ATWOOD FENCE COMPANY INC. $2,768,907.15
526435 C.E.C., INC. $2,938,004.50
623811 UNITED RENTALS HWY TECHNOLOGIES INC $2,976,176.98
 
Item Number Item Description Quantity Unit of Measure - 1 -
MASTEC NORTH AMERICA INC
- 2 -
ALPHA SERVICE AND PRODUCTS, INC.
- 3 -
JACK B. HARPER CONTRACTOR, INC.
- 4 -
ATWOOD FENCE COMPANY INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 863      LNFT 3.60 3,106.80 2.50 2,157.50 3.15 2,718.45 5.00 4,315.00
202-02-01 removal of sign and support(s) 456      EACH 230.00 104,880.00 150.00 68,400.00 200.00 91,200.00 200.00 91,200.00
202-02-02 removal of sign face(s) 536      EACH 30.00 16,080.00 25.00 13,400.00 85.00 45,560.00 45.00 24,120.00
202-02-03 removal of sign supports 34      EACH 60.00 2,040.00 40.00 1,360.00 200.00 6,800.00 250.00 8,500.00
202-02-04 removal of sign and u-channel post 605      EACH 60.00 36,300.00 30.00 18,150.00 29.00 17,545.00 25.00 15,125.00
202-02-05 removal of sign support footing 11      EACH 300.00 3,300.00 135.00 1,485.00 230.00 2,530.00 150.00 1,650.00
202-02-06 removal of overhead sign support 4      EACH 2,000.00 8,000.00 1,400.00 5,600.00 2,875.00 11,500.00 1,000.00 4,000.00
202-02-07 removal of overhead sign support footings 9      EACH 1,600.00 14,400.00 1,200.00 10,800.00 2,875.00 25,875.00 850.00 7,650.00
202-02-08 removal of overhead sign fascia mounting 2      EACH 240.00 480.00 1,600.00 3,200.00 975.00 1,950.00 750.00 1,500.00
203-08 borrow (vehicular measurement) 366      CUYD 24.00 8,784.00 23.00 8,418.00 18.00 6,588.00 20.00 7,320.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 12.6    LNFT 39.00 491.40 30.00 378.00 45.00 567.00 35.00 441.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 37.5    LNFT 28.00 1,050.00 23.00 862.50 37.00 1,387.50 35.00 1,312.50
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 56.7    LNFT 45.00 2,551.50 38.00 2,154.60 52.00 2,948.40 45.00 2,551.50
704-03 blocked out guard rail 3,031.7    LNFT 17.00 51,538.90 13.75 41,685.87 18.00 54,570.60 16.50 50,023.05
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
106.8    LNFT 84.00 8,971.20 75.00 8,010.00 92.00 9,825.60 65.00 6,942.00
704-08-B guard rail transitions (double thrie beam) 56.7    LNFT 49.00 2,778.30 0.01 0.56 92.00 5,216.40 40.00 2,268.00
704-11-B guard rail end treatment (tangent) 17      EACH 2,100.00 35,700.00 1,750.00 29,750.00 2,070.00 35,190.00 1,950.00 33,150.00
706-03-A incidental concrete paving (4" thick) 3,020.9    SQYD 38.00 114,794.20 25.00 75,522.50 37.00 111,773.30 37.00 111,773.30
706-03-C incidental concrete paving (6" thick) 302.4    SQYD 64.00 19,353.60 33.00 9,979.20 39.00 11,793.60 63.00 19,051.20
713-01 temporary signs & barricades lump      LUMP 19,000.00 19,000.00 25,000.00 25,000.00 20,000.00 20,000.00 75,000.00 75,000.00
727-01 mobilization lump      LUMP 49,000.00 49,000.00 55,000.00 55,000.00 168,000.00 168,000.00 125,000.00 125,000.00
729-01 sign (type a) 5,487.9    SQFT 13.50 74,086.65 13.00 71,342.70 11.00 60,366.90 12.00 65,854.80
729-02 sign (type b) 208.7    SQFT 15.65 3,266.15 15.50 3,234.85 10.00 2,087.00 14.00 2,921.80
729-04 sign (type d) 21,763.5    SQFT 13.83 300,989.20 14.00 304,689.00 13.00 282,925.50 15.00 326,452.50
729-05 sign (type e) 1,594.0    SQFT 14.72 23,463.68 19.00 30,286.00 14.00 22,316.00 17.00 27,098.00
729-06 sign (overhead mounted) 8,001.5    SQFT 12.31 98,498.46 17.00 136,025.50 13.00 104,019.50 15.00 120,022.50
729-08-A mounting (2 1/2" post) 186      EACH 597.00 111,042.00 480.00 89,280.00 500.00 93,000.00 550.00 102,300.00
729-08-B mounting (3 1/2" post) 134      EACH 675.00 90,450.00 620.00 83,080.00 800.00 107,200.00 625.00 83,750.00
729-08-C-01 mounting (5" post)(structure mounted) 19      EACH 1,100.00 20,900.00 500.00 9,500.00 517.00 9,823.00 450.00 8,550.00
729-08-E mounting (s3 x 5.7) 28      EACH 465.00 13,020.00 530.00 14,840.00 460.00 12,880.00 575.00 16,100.00
729-08-F mounting (w6 x 12) 285      EACH 440.00 125,400.00 630.00 179,550.00 610.00 173,850.00 800.00 228,000.00
729-08-G mounting (w8 x 18) 30      EACH 714.00 21,420.00 1,100.00 33,000.00 920.00 27,600.00 1,025.00 30,750.00
729-08-H mounting (w8 x 24) 158      EACH 987.00 155,946.00 1,200.00 189,600.00 1,380.00 218,040.00 1,350.00 213,300.00
729-09-A mounting (overhead truss)(ground mounted)(66' span) 1      EACH 25,000.00 25,000.00 40,000.00 40,000.00 35,650.00 35,650.00 40,500.00 40,500.00
729-09-B mounting (overhead truss)(ground mounted)(84' span) 3      EACH 31,500.00 94,500.00 42,000.00 126,000.00 37,375.00 112,125.00 42,000.00 126,000.00
729-09-C mounting (overhead truss)(ground mounted)(90' span) 1      EACH 33,000.00 33,000.00 47,000.00 47,000.00 39,675.00 39,675.00 44,500.00 44,500.00
729-11 mounting (overhead cantilever)(ground mounted)(one
post)
11      EACH 16,000.00 176,000.00 18,000.00 198,000.00 16,675.00 183,425.00 16,800.00 184,800.00
729-13 mounting (bridge fascia mounted) 9      EACH 2,200.00 19,800.00 4,300.00 38,700.00 3,565.00 32,085.00 4,500.00 40,500.00
729-16-C object marker assembly (type 3) 34      EACH 77.00 2,618.00 65.00 2,210.00 86.00 2,924.00 75.00 2,550.00
729-17 milepost assembly (ground mounted) 72      EACH 200.00 14,400.00 190.00 13,680.00 86.00 6,192.00 135.00 9,720.00
729-18 milepost assembly (structure mounted) 34      EACH 118.00 4,012.00 52.00 1,768.00 80.00 2,720.00 95.00 3,230.00
729-18-01 milepost assembly (structure mounted)(secondary) 320      EACH 40.00 12,800.00 60.00 19,200.00 86.00 27,520.00 95.00 30,400.00
729-20 footings for overhead mountings (truss) 10      EACH 11,000.00 110,000.00 12,000.00 120,000.00 10,925.00 109,250.00 9,400.00 94,000.00
729-20-A footings for overhead mountings (cantilever) 11      EACH 11,000.00 121,000.00 12,500.00 137,500.00 10,925.00 120,175.00 9,900.00 108,900.00
729-21 u-channel post 19      EACH 56.00 1,064.00 32.00 608.00 57.00 1,083.00 65.00 1,235.00
740-01 construction layout lump      LUMP 8,000.00 8,000.00 5,000.00 5,000.00 15,000.00 15,000.00 25,000.00 25,000.00
S-001 remove and remount sign 4      EACH 100.00 400.00 150.00 600.00 345.00 1,380.00 250.00 1,000.00
S-002 remove and remount logo panel 313      EACH 35.00 10,955.00 40.00 12,520.00 34.00 10,642.00 35.00 10,955.00
S-003 vertical supports, brackets & u-bolts 21      EACH 465.00 9,765.00 525.00 11,025.00 1,035.00 21,735.00 550.00 11,550.00
S-004 aluminum tee supports 160      EACH 58.00 9,280.00 20.00 3,200.00 29.00 4,640.00 30.00 4,800.00
S-005 remove and reinstall guard rail 100      LNFT 13.30 1,330.00 10.50 1,050.00 16.00 1,600.00 10.00 1,000.00
S-006 variable message sign unit 4      ea 2,500.00 10,000.00 15,000.00 60,000.00 17,000.00 68,000.00 15,000.00 60,000.00
S-101 mounting bracket for type a signs (str. mounted) 15      EACH 2,000.00 30,000.00 2,000.00 30,000.00 2,875.00 43,125.00 1,485.00 22,275.00
S-102 mounting bracket and post for type d signs (type 1)
(str. mounted)
13      EACH 5,000.00 65,000.00 6,000.00 78,000.00 5,750.00 74,750.00 7,500.00 97,500.00
S-103 mounting bracket and post for type d signs (type ii)
(str. mounted)
2      EACH 8,000.00 16,000.00 9,100.00 18,200.00 8,050.00 16,100.00 10,750.00 21,500.00
S-104 mounting (ts6x6x3/8)(str. mounted) 10      EACH 800.00 8,000.00 1,350.00 13,500.00 1,725.00 17,250.00 900.00 9,000.00
                       
 CONTRACTOR TOTAL       2,324,006.04   2,503,502.78   2,694,692.75   2,768,907.15
 
Item Number Item Description Quantity Unit of Measure - 5 -
C.E.C., INC.
- 6 -
UNITED RENTALS HWY TECHNOLOGIES INC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 863      LNFT 3.25 2,804.75 3.00 2,589.00        
202-02-01 removal of sign and support(s) 456      EACH 40.00 18,240.00 150.00 68,400.00        
202-02-02 removal of sign face(s) 536      EACH 30.00 16,080.00 40.00 21,440.00        
202-02-03 removal of sign supports 34      EACH 70.00 2,380.00 225.00 7,650.00        
202-02-04 removal of sign and u-channel post 605      EACH 10.00 6,050.00 40.00 24,200.00        
202-02-05 removal of sign support footing 11      EACH 1,000.00 11,000.00 320.00 3,520.00        
202-02-06 removal of overhead sign support 4      EACH 1,100.00 4,400.00 5,400.00 21,600.00        
202-02-07 removal of overhead sign support footings 9      EACH 1,100.00 9,900.00 4,800.00 43,200.00        
202-02-08 removal of overhead sign fascia mounting 2      EACH 500.00 1,000.00 1,800.00 3,600.00        
203-08 borrow (vehicular measurement) 366      CUYD 45.00 16,470.00 43.00 15,738.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 12.6    LNFT 35.00 441.00 35.00 441.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 37.5    LNFT 24.80 930.00 30.00 1,125.00        
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 56.7    LNFT 40.50 2,296.35 40.00 2,268.00        
704-03 blocked out guard rail 3,031.7    LNFT 15.00 45,475.50 15.00 45,475.50        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
106.8    LNFT 76.00 8,116.80 80.00 8,544.00        
704-08-B guard rail transitions (double thrie beam) 56.7    LNFT 44.00 2,494.80 40.00 2,268.00        
704-11-B guard rail end treatment (tangent) 17      EACH 1,900.00 32,300.00 2,200.00 37,400.00        
706-03-A incidental concrete paving (4" thick) 3,020.9    SQYD 50.00 151,045.00 37.40 112,981.66        
706-03-C incidental concrete paving (6" thick) 302.4    SQYD 65.00 19,656.00 63.80 19,293.12        
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 35,000.00 35,000.00        
727-01 mobilization lump      LUMP 50,000.00 50,000.00 25,000.00 25,000.00        
729-01 sign (type a) 5,487.9    SQFT 17.00 93,294.30 15.00 82,318.50        
729-02 sign (type b) 208.7    SQFT 50.00 10,435.00 16.00 3,339.20        
729-04 sign (type d) 21,763.5    SQFT 15.00 326,452.50 16.00 348,216.00        
729-05 sign (type e) 1,594.0    SQFT 25.00 39,850.00 17.00 27,098.00        
729-06 sign (overhead mounted) 8,001.5    SQFT 15.00 120,022.50 18.00 144,027.00        
729-08-A mounting (2 1/2" post) 186      EACH 500.00 93,000.00 600.00 111,600.00        
729-08-B mounting (3 1/2" post) 134      EACH 700.00 93,800.00 700.00 93,800.00        
729-08-C-01 mounting (5" post)(structure mounted) 19      EACH 1,000.00 19,000.00 750.00 14,250.00        
729-08-E mounting (s3 x 5.7) 28      EACH 800.00 22,400.00 600.00 16,800.00        
729-08-F mounting (w6 x 12) 285      EACH 800.00 228,000.00 850.00 242,250.00        
729-08-G mounting (w8 x 18) 30      EACH 1,100.00 33,000.00 1,100.00 33,000.00        
729-08-H mounting (w8 x 24) 158      EACH 1,300.00 205,400.00 1,400.00 221,200.00        
729-09-A mounting (overhead truss)(ground mounted)(66' span) 1      EACH 45,000.00 45,000.00 40,000.00 40,000.00        
729-09-B mounting (overhead truss)(ground mounted)(84' span) 3      EACH 45,000.00 135,000.00 45,000.00 135,000.00        
729-09-C mounting (overhead truss)(ground mounted)(90' span) 1      EACH 48,000.00 48,000.00 52,000.00 52,000.00        
729-11 mounting (overhead cantilever)(ground mounted)(one
post)
11      EACH 20,000.00 220,000.00 20,000.00 220,000.00        
729-13 mounting (bridge fascia mounted) 9      EACH 6,000.00 54,000.00 6,500.00 58,500.00        
729-16-C object marker assembly (type 3) 34      EACH 70.00 2,380.00 70.00 2,380.00        
729-17 milepost assembly (ground mounted) 72      EACH 110.00 7,920.00 120.00 8,640.00        
729-18 milepost assembly (structure mounted) 34      EACH 120.00 4,080.00 75.00 2,550.00        
729-18-01 milepost assembly (structure mounted)(secondary) 320      EACH 130.00 41,600.00 85.00 27,200.00        
729-20 footings for overhead mountings (truss) 10      EACH 16,000.00 160,000.00 16,000.00 160,000.00        
729-20-A footings for overhead mountings (cantilever) 11      EACH 16,000.00 176,000.00 17,500.00 192,500.00        
729-21 u-channel post 19      EACH 100.00 1,900.00 65.00 1,235.00        
740-01 construction layout lump      LUMP 40,000.00 40,000.00 45,000.00 45,000.00        
S-001 remove and remount sign 4      EACH 500.00 2,000.00 500.00 2,000.00        
S-002 remove and remount logo panel 313      EACH 30.00 9,390.00 30.00 9,390.00        
S-003 vertical supports, brackets & u-bolts 21      EACH 600.00 12,600.00 550.00 11,550.00        
S-004 aluminum tee supports 160      EACH 45.00 7,200.00 55.00 8,800.00        
S-005 remove and reinstall guard rail 100      LNFT 12.00 1,200.00 10.00 1,000.00        
S-006 variable message sign unit 4      ea 20,000.00 80,000.00 1,200.00 4,800.00        
S-101 mounting bracket for type a signs (str. mounted) 15      EACH 3,000.00 45,000.00 1,900.00 28,500.00        
S-102 mounting bracket and post for type d signs (type 1)
(str. mounted)
13      EACH 6,000.00 78,000.00 6,500.00 84,500.00        
S-103 mounting bracket and post for type d signs (type ii)
(str. mounted)
2      EACH 10,000.00 20,000.00 8,000.00 16,000.00        
S-104 mounting (ts6x6x3/8)(str. mounted) 10      EACH 1,100.00 11,000.00 2,500.00 25,000.00        
                       
 CONTRACTOR TOTAL       2,938,004.50   2,976,176.98        