| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MASTEC NORTH AMERICA INC |
- 2 - ALPHA SERVICE AND PRODUCTS, INC. |
- 3 - JACK B. HARPER CONTRACTOR, INC. |
- 4 - ATWOOD FENCE COMPANY INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
863   |
LNFT |
3.60 |
3,106.80 |
2.50 |
2,157.50 |
3.15 |
2,718.45 |
5.00 |
4,315.00 |
| 202-02-01 |
removal of sign and support(s)
|
456   |
EACH |
230.00 |
104,880.00 |
150.00 |
68,400.00 |
200.00 |
91,200.00 |
200.00 |
91,200.00 |
| 202-02-02 |
removal of sign face(s)
|
536   |
EACH |
30.00 |
16,080.00 |
25.00 |
13,400.00 |
85.00 |
45,560.00 |
45.00 |
24,120.00 |
| 202-02-03 |
removal of sign supports
|
34   |
EACH |
60.00 |
2,040.00 |
40.00 |
1,360.00 |
200.00 |
6,800.00 |
250.00 |
8,500.00 |
| 202-02-04 |
removal of sign and u-channel post
|
605   |
EACH |
60.00 |
36,300.00 |
30.00 |
18,150.00 |
29.00 |
17,545.00 |
25.00 |
15,125.00 |
| 202-02-05 |
removal of sign support footing
|
11   |
EACH |
300.00 |
3,300.00 |
135.00 |
1,485.00 |
230.00 |
2,530.00 |
150.00 |
1,650.00 |
| 202-02-06 |
removal of overhead sign support
|
4   |
EACH |
2,000.00 |
8,000.00 |
1,400.00 |
5,600.00 |
2,875.00 |
11,500.00 |
1,000.00 |
4,000.00 |
| 202-02-07 |
removal of overhead sign support footings
|
9   |
EACH |
1,600.00 |
14,400.00 |
1,200.00 |
10,800.00 |
2,875.00 |
25,875.00 |
850.00 |
7,650.00 |
| 202-02-08 |
removal of overhead sign fascia mounting
|
2   |
EACH |
240.00 |
480.00 |
1,600.00 |
3,200.00 |
975.00 |
1,950.00 |
750.00 |
1,500.00 |
| 203-08 |
borrow (vehicular measurement)
|
366   |
CUYD |
24.00 |
8,784.00 |
23.00 |
8,418.00 |
18.00 |
6,588.00 |
20.00 |
7,320.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
12.6 |
LNFT |
39.00 |
491.40 |
30.00 |
378.00 |
45.00 |
567.00 |
35.00 |
441.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
37.5 |
LNFT |
28.00 |
1,050.00 |
23.00 |
862.50 |
37.00 |
1,387.50 |
35.00 |
1,312.50 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
56.7 |
LNFT |
45.00 |
2,551.50 |
38.00 |
2,154.60 |
52.00 |
2,948.40 |
45.00 |
2,551.50 |
| 704-03 |
blocked out guard rail
|
3,031.7 |
LNFT |
17.00 |
51,538.90 |
13.75 |
41,685.87 |
18.00 |
54,570.60 |
16.50 |
50,023.05 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
106.8 |
LNFT |
84.00 |
8,971.20 |
75.00 |
8,010.00 |
92.00 |
9,825.60 |
65.00 |
6,942.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
56.7 |
LNFT |
49.00 |
2,778.30 |
0.01 |
0.56 |
92.00 |
5,216.40 |
40.00 |
2,268.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
17   |
EACH |
2,100.00 |
35,700.00 |
1,750.00 |
29,750.00 |
2,070.00 |
35,190.00 |
1,950.00 |
33,150.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
3,020.9 |
SQYD |
38.00 |
114,794.20 |
25.00 |
75,522.50 |
37.00 |
111,773.30 |
37.00 |
111,773.30 |
| 706-03-C |
incidental concrete paving (6" thick)
|
302.4 |
SQYD |
64.00 |
19,353.60 |
33.00 |
9,979.20 |
39.00 |
11,793.60 |
63.00 |
19,051.20 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
19,000.00 |
19,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
75,000.00 |
75,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
49,000.00 |
49,000.00 |
55,000.00 |
55,000.00 |
168,000.00 |
168,000.00 |
125,000.00 |
125,000.00 |
| 729-01 |
sign (type a)
|
5,487.9 |
SQFT |
13.50 |
74,086.65 |
13.00 |
71,342.70 |
11.00 |
60,366.90 |
12.00 |
65,854.80 |
| 729-02 |
sign (type b)
|
208.7 |
SQFT |
15.65 |
3,266.15 |
15.50 |
3,234.85 |
10.00 |
2,087.00 |
14.00 |
2,921.80 |
| 729-04 |
sign (type d)
|
21,763.5 |
SQFT |
13.83 |
300,989.20 |
14.00 |
304,689.00 |
13.00 |
282,925.50 |
15.00 |
326,452.50 |
| 729-05 |
sign (type e)
|
1,594.0 |
SQFT |
14.72 |
23,463.68 |
19.00 |
30,286.00 |
14.00 |
22,316.00 |
17.00 |
27,098.00 |
| 729-06 |
sign (overhead mounted)
|
8,001.5 |
SQFT |
12.31 |
98,498.46 |
17.00 |
136,025.50 |
13.00 |
104,019.50 |
15.00 |
120,022.50 |
| 729-08-A |
mounting (2 1/2" post)
|
186   |
EACH |
597.00 |
111,042.00 |
480.00 |
89,280.00 |
500.00 |
93,000.00 |
550.00 |
102,300.00 |
| 729-08-B |
mounting (3 1/2" post)
|
134   |
EACH |
675.00 |
90,450.00 |
620.00 |
83,080.00 |
800.00 |
107,200.00 |
625.00 |
83,750.00 |
| 729-08-C-01 |
mounting (5" post)(structure mounted)
|
19   |
EACH |
1,100.00 |
20,900.00 |
500.00 |
9,500.00 |
517.00 |
9,823.00 |
450.00 |
8,550.00 |
| 729-08-E |
mounting (s3 x 5.7)
|
28   |
EACH |
465.00 |
13,020.00 |
530.00 |
14,840.00 |
460.00 |
12,880.00 |
575.00 |
16,100.00 |
| 729-08-F |
mounting (w6 x 12)
|
285   |
EACH |
440.00 |
125,400.00 |
630.00 |
179,550.00 |
610.00 |
173,850.00 |
800.00 |
228,000.00 |
| 729-08-G |
mounting (w8 x 18)
|
30   |
EACH |
714.00 |
21,420.00 |
1,100.00 |
33,000.00 |
920.00 |
27,600.00 |
1,025.00 |
30,750.00 |
| 729-08-H |
mounting (w8 x 24)
|
158   |
EACH |
987.00 |
155,946.00 |
1,200.00 |
189,600.00 |
1,380.00 |
218,040.00 |
1,350.00 |
213,300.00 |
| 729-09-A |
mounting (overhead truss)(ground mounted)(66' span)
|
1   |
EACH |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
35,650.00 |
35,650.00 |
40,500.00 |
40,500.00 |
| 729-09-B |
mounting (overhead truss)(ground mounted)(84' span)
|
3   |
EACH |
31,500.00 |
94,500.00 |
42,000.00 |
126,000.00 |
37,375.00 |
112,125.00 |
42,000.00 |
126,000.00 |
| 729-09-C |
mounting (overhead truss)(ground mounted)(90' span)
|
1   |
EACH |
33,000.00 |
33,000.00 |
47,000.00 |
47,000.00 |
39,675.00 |
39,675.00 |
44,500.00 |
44,500.00 |
| 729-11 |
mounting (overhead cantilever)(ground mounted)(one
post) |
11   |
EACH |
16,000.00 |
176,000.00 |
18,000.00 |
198,000.00 |
16,675.00 |
183,425.00 |
16,800.00 |
184,800.00 |
| 729-13 |
mounting (bridge fascia mounted)
|
9   |
EACH |
2,200.00 |
19,800.00 |
4,300.00 |
38,700.00 |
3,565.00 |
32,085.00 |
4,500.00 |
40,500.00 |
| 729-16-C |
object marker assembly (type 3)
|
34   |
EACH |
77.00 |
2,618.00 |
65.00 |
2,210.00 |
86.00 |
2,924.00 |
75.00 |
2,550.00 |
| 729-17 |
milepost assembly (ground mounted)
|
72   |
EACH |
200.00 |
14,400.00 |
190.00 |
13,680.00 |
86.00 |
6,192.00 |
135.00 |
9,720.00 |
| 729-18 |
milepost assembly (structure mounted)
|
34   |
EACH |
118.00 |
4,012.00 |
52.00 |
1,768.00 |
80.00 |
2,720.00 |
95.00 |
3,230.00 |
| 729-18-01 |
milepost assembly (structure mounted)(secondary)
|
320   |
EACH |
40.00 |
12,800.00 |
60.00 |
19,200.00 |
86.00 |
27,520.00 |
95.00 |
30,400.00 |
| 729-20 |
footings for overhead mountings (truss)
|
10   |
EACH |
11,000.00 |
110,000.00 |
12,000.00 |
120,000.00 |
10,925.00 |
109,250.00 |
9,400.00 |
94,000.00 |
| 729-20-A |
footings for overhead mountings (cantilever)
|
11   |
EACH |
11,000.00 |
121,000.00 |
12,500.00 |
137,500.00 |
10,925.00 |
120,175.00 |
9,900.00 |
108,900.00 |
| 729-21 |
u-channel post
|
19   |
EACH |
56.00 |
1,064.00 |
32.00 |
608.00 |
57.00 |
1,083.00 |
65.00 |
1,235.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
| S-001 |
remove and remount sign
|
4   |
EACH |
100.00 |
400.00 |
150.00 |
600.00 |
345.00 |
1,380.00 |
250.00 |
1,000.00 |
| S-002 |
remove and remount logo panel
|
313   |
EACH |
35.00 |
10,955.00 |
40.00 |
12,520.00 |
34.00 |
10,642.00 |
35.00 |
10,955.00 |
| S-003 |
vertical supports, brackets & u-bolts
|
21   |
EACH |
465.00 |
9,765.00 |
525.00 |
11,025.00 |
1,035.00 |
21,735.00 |
550.00 |
11,550.00 |
| S-004 |
aluminum tee supports
|
160   |
EACH |
58.00 |
9,280.00 |
20.00 |
3,200.00 |
29.00 |
4,640.00 |
30.00 |
4,800.00 |
| S-005 |
remove and reinstall guard rail
|
100   |
LNFT |
13.30 |
1,330.00 |
10.50 |
1,050.00 |
16.00 |
1,600.00 |
10.00 |
1,000.00 |
| S-006 |
variable message sign unit
|
4   |
ea |
2,500.00 |
10,000.00 |
15,000.00 |
60,000.00 |
17,000.00 |
68,000.00 |
15,000.00 |
60,000.00 |
| S-101 |
mounting bracket for type a signs (str. mounted)
|
15   |
EACH |
2,000.00 |
30,000.00 |
2,000.00 |
30,000.00 |
2,875.00 |
43,125.00 |
1,485.00 |
22,275.00 |
| S-102 |
mounting bracket and post for type d signs (type 1)
(str. mounted) |
13   |
EACH |
5,000.00 |
65,000.00 |
6,000.00 |
78,000.00 |
5,750.00 |
74,750.00 |
7,500.00 |
97,500.00 |
| S-103 |
mounting bracket and post for type d signs (type ii)
(str. mounted) |
2   |
EACH |
8,000.00 |
16,000.00 |
9,100.00 |
18,200.00 |
8,050.00 |
16,100.00 |
10,750.00 |
21,500.00 |
| S-104 |
mounting (ts6x6x3/8)(str. mounted)
|
10   |
EACH |
800.00 |
8,000.00 |
1,350.00 |
13,500.00 |
1,725.00 |
17,250.00 |
900.00 |
9,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,324,006.04 |
|
2,503,502.78 |
|
2,694,692.75 |
|
2,768,907.15 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - C.E.C., INC. |
- 6 - UNITED RENTALS HWY TECHNOLOGIES INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
863   |
LNFT |
3.25 |
2,804.75 |
3.00 |
2,589.00 |
|
|
|
|
| 202-02-01 |
removal of sign and support(s)
|
456   |
EACH |
40.00 |
18,240.00 |
150.00 |
68,400.00 |
|
|
|
|
| 202-02-02 |
removal of sign face(s)
|
536   |
EACH |
30.00 |
16,080.00 |
40.00 |
21,440.00 |
|
|
|
|
| 202-02-03 |
removal of sign supports
|
34   |
EACH |
70.00 |
2,380.00 |
225.00 |
7,650.00 |
|
|
|
|
| 202-02-04 |
removal of sign and u-channel post
|
605   |
EACH |
10.00 |
6,050.00 |
40.00 |
24,200.00 |
|
|
|
|
| 202-02-05 |
removal of sign support footing
|
11   |
EACH |
1,000.00 |
11,000.00 |
320.00 |
3,520.00 |
|
|
|
|
| 202-02-06 |
removal of overhead sign support
|
4   |
EACH |
1,100.00 |
4,400.00 |
5,400.00 |
21,600.00 |
|
|
|
|
| 202-02-07 |
removal of overhead sign support footings
|
9   |
EACH |
1,100.00 |
9,900.00 |
4,800.00 |
43,200.00 |
|
|
|
|
| 202-02-08 |
removal of overhead sign fascia mounting
|
2   |
EACH |
500.00 |
1,000.00 |
1,800.00 |
3,600.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
366   |
CUYD |
45.00 |
16,470.00 |
43.00 |
15,738.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
12.6 |
LNFT |
35.00 |
441.00 |
35.00 |
441.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
37.5 |
LNFT |
24.80 |
930.00 |
30.00 |
1,125.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
56.7 |
LNFT |
40.50 |
2,296.35 |
40.00 |
2,268.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
3,031.7 |
LNFT |
15.00 |
45,475.50 |
15.00 |
45,475.50 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
106.8 |
LNFT |
76.00 |
8,116.80 |
80.00 |
8,544.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
56.7 |
LNFT |
44.00 |
2,494.80 |
40.00 |
2,268.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
17   |
EACH |
1,900.00 |
32,300.00 |
2,200.00 |
37,400.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
3,020.9 |
SQYD |
50.00 |
151,045.00 |
37.40 |
112,981.66 |
|
|
|
|
| 706-03-C |
incidental concrete paving (6" thick)
|
302.4 |
SQYD |
65.00 |
19,656.00 |
63.80 |
19,293.12 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
5,487.9 |
SQFT |
17.00 |
93,294.30 |
15.00 |
82,318.50 |
|
|
|
|
| 729-02 |
sign (type b)
|
208.7 |
SQFT |
50.00 |
10,435.00 |
16.00 |
3,339.20 |
|
|
|
|
| 729-04 |
sign (type d)
|
21,763.5 |
SQFT |
15.00 |
326,452.50 |
16.00 |
348,216.00 |
|
|
|
|
| 729-05 |
sign (type e)
|
1,594.0 |
SQFT |
25.00 |
39,850.00 |
17.00 |
27,098.00 |
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
8,001.5 |
SQFT |
15.00 |
120,022.50 |
18.00 |
144,027.00 |
|
|
|
|
| 729-08-A |
mounting (2 1/2" post)
|
186   |
EACH |
500.00 |
93,000.00 |
600.00 |
111,600.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
134   |
EACH |
700.00 |
93,800.00 |
700.00 |
93,800.00 |
|
|
|
|
| 729-08-C-01 |
mounting (5" post)(structure mounted)
|
19   |
EACH |
1,000.00 |
19,000.00 |
750.00 |
14,250.00 |
|
|
|
|
| 729-08-E |
mounting (s3 x 5.7)
|
28   |
EACH |
800.00 |
22,400.00 |
600.00 |
16,800.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
285   |
EACH |
800.00 |
228,000.00 |
850.00 |
242,250.00 |
|
|
|
|
| 729-08-G |
mounting (w8 x 18)
|
30   |
EACH |
1,100.00 |
33,000.00 |
1,100.00 |
33,000.00 |
|
|
|
|
| 729-08-H |
mounting (w8 x 24)
|
158   |
EACH |
1,300.00 |
205,400.00 |
1,400.00 |
221,200.00 |
|
|
|
|
| 729-09-A |
mounting (overhead truss)(ground mounted)(66' span)
|
1   |
EACH |
45,000.00 |
45,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| 729-09-B |
mounting (overhead truss)(ground mounted)(84' span)
|
3   |
EACH |
45,000.00 |
135,000.00 |
45,000.00 |
135,000.00 |
|
|
|
|
| 729-09-C |
mounting (overhead truss)(ground mounted)(90' span)
|
1   |
EACH |
48,000.00 |
48,000.00 |
52,000.00 |
52,000.00 |
|
|
|
|
| 729-11 |
mounting (overhead cantilever)(ground mounted)(one
post) |
11   |
EACH |
20,000.00 |
220,000.00 |
20,000.00 |
220,000.00 |
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
9   |
EACH |
6,000.00 |
54,000.00 |
6,500.00 |
58,500.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
34   |
EACH |
70.00 |
2,380.00 |
70.00 |
2,380.00 |
|
|
|
|
| 729-17 |
milepost assembly (ground mounted)
|
72   |
EACH |
110.00 |
7,920.00 |
120.00 |
8,640.00 |
|
|
|
|
| 729-18 |
milepost assembly (structure mounted)
|
34   |
EACH |
120.00 |
4,080.00 |
75.00 |
2,550.00 |
|
|
|
|
| 729-18-01 |
milepost assembly (structure mounted)(secondary)
|
320   |
EACH |
130.00 |
41,600.00 |
85.00 |
27,200.00 |
|
|
|
|
| 729-20 |
footings for overhead mountings (truss)
|
10   |
EACH |
16,000.00 |
160,000.00 |
16,000.00 |
160,000.00 |
|
|
|
|
| 729-20-A |
footings for overhead mountings (cantilever)
|
11   |
EACH |
16,000.00 |
176,000.00 |
17,500.00 |
192,500.00 |
|
|
|
|
| 729-21 |
u-channel post
|
19   |
EACH |
100.00 |
1,900.00 |
65.00 |
1,235.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| S-001 |
remove and remount sign
|
4   |
EACH |
500.00 |
2,000.00 |
500.00 |
2,000.00 |
|
|
|
|
| S-002 |
remove and remount logo panel
|
313   |
EACH |
30.00 |
9,390.00 |
30.00 |
9,390.00 |
|
|
|
|
| S-003 |
vertical supports, brackets & u-bolts
|
21   |
EACH |
600.00 |
12,600.00 |
550.00 |
11,550.00 |
|
|
|
|
| S-004 |
aluminum tee supports
|
160   |
EACH |
45.00 |
7,200.00 |
55.00 |
8,800.00 |
|
|
|
|
| S-005 |
remove and reinstall guard rail
|
100   |
LNFT |
12.00 |
1,200.00 |
10.00 |
1,000.00 |
|
|
|
|
| S-006 |
variable message sign unit
|
4   |
ea |
20,000.00 |
80,000.00 |
1,200.00 |
4,800.00 |
|
|
|
|
| S-101 |
mounting bracket for type a signs (str. mounted)
|
15   |
EACH |
3,000.00 |
45,000.00 |
1,900.00 |
28,500.00 |
|
|
|
|
| S-102 |
mounting bracket and post for type d signs (type 1)
(str. mounted) |
13   |
EACH |
6,000.00 |
78,000.00 |
6,500.00 |
84,500.00 |
|
|
|
|
| S-103 |
mounting bracket and post for type d signs (type ii)
(str. mounted) |
2   |
EACH |
10,000.00 |
20,000.00 |
8,000.00 |
16,000.00 |
|
|
|
|
| S-104 |
mounting (ts6x6x3/8)(str. mounted)
|
10   |
EACH |
1,100.00 |
11,000.00 |
2,500.00 |
25,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,938,004.50 |
|
2,976,176.98 |
|
|
|
|
|